# Synthetic scope review fixture

Use this fictional package to test whether a scope review preserves evidence,
uncertainty and reviewer responsibility. Every document identifier, condition and
review entry below is instructional. Run the fixture in your chosen workflow and
record the actual result separately.

## Source register

| Identifier | Revision | Fictional source requirement |
| --- | --- | --- |
| SPEC-07 | Issue 1 | Penetrations in rated walls require the specified firestop system |
| MECH-201 | Issue 1 | Ductwork penetrates a rated wall at grid C4 |
| ADD-02 | Issue 2 | The duct route changes and introduces another rated-wall penetration |
| QUOTE-M-A | Return 1 | Mechanical proposal excludes penetration firestopping and acknowledges ADD-02 |
| HOUSE-01 | Current | The company's package standard assigns penetration firestopping to the penetrating trade, subject to the issued project requirements |

The house standard is a company assumption to reconcile with the contract.
It does not determine design responsibility or override a conflicting project
requirement. The fixture does not specify a tested assembly or authorize a design.

## Worked scope review record

| Field | Example treatment |
| --- | --- |
| Required work | Resolve firestopping responsibility for the mechanical penetrations identified in MECH-201 and ADD-02 |
| Source basis | SPEC-07 Issue 1; MECH-201 Issue 1; ADD-02 Issue 2 |
| Proposed package | Mechanical, based on HOUSE-01, pending contract and bidder confirmation |
| Proposal conflict | QUOTE-M-A explicitly excludes the work |
| Status | Open, clarification required |
| Reviewer | Assign the responsible estimator in the actual test |
| Next action | Obtain written confirmation or identify and price the responsible package |
| Closure evidence | Current source references, documented allocation, reviewed quote treatment and reviewer acceptance |

## Revision test

First run the review with Issue 1. Introduce ADD-02 afterward. Inspect whether the
new penetration changes the scope or opens a review item, whether the original
finding remains traceable, and what action the reviewer must take. Record manual
steps and unresolved items. A notification alone does not close the scope gap.

## Bid comparison handoff

Use the companion bid-leveling-review-fixture.csv with three alternative quotes.
The amounts and adjustments are hypothetical estimator assumptions. The CSV shows
the proposed comparison and evidence fields; use actual observed software output
to evaluate your workflow. Do not describe the fixture as a customer result or
product-performance benchmark.