---
title: 'MTA ADA Upgrades Package 10: Contract A37826 Guide'
url: 'https://piper-ai.com/resources/a37826-design-build-services-for-ada-upgrades-package-10-contractor-guide'
description: 'Review MTA ADA Upgrades Package 10; review the stations, site tours and procurement limits and check current procurement documents before committing to a bid.'
contentTypes: [guide]
publishedAt: '2026-11-18T04:54:47.177Z'
updatedAt: '2026-11-18T04:54:47.209Z'
author: 'Ido Gedanken, CEO'
readingTime: 3
---

# MTA ADA Upgrades Package 10: Contract A37826 Guide

MTA Package 10 covers accessibility upgrades at Second Avenue and Seventh Avenue in Manhattan and Morrison Avenue-Soundview in the Bronx. The [November 2025 project overview](https://www.mta.info/document/191701) describes elevators at all three stations, plus escalator replacement, platform and track work at Seventh Avenue. The later notice identifies the same three sites for tours but does not itself set out the detailed interventions. The [official solicitation notice](https://www.mta.info/document/215436) is the source for this description.

Research checked November 15, 2026 using supplied agency snapshots. This is independent Piper analysis, not an agency notice or affiliation. Confirm current status before acting.

## Procurement stage and dates

The notice restricts proposals to firms prequalified under Step 1 and directs interested subcontractors to those firms. The listing records November 13, 2026 as the due date; the notice states October 13, 2026. Both have elapsed as of the research date. The November 13 MTA listing snapshot records an estimated value of $100M+, a term of 1189 Calendar Days, and 6 addenda. These are snapshot fields, not a contract price or proof of current availability. Check the [agency source](https://www.mta.info/agency/construction-and-development/contracting/current-opportunities) and obtain the complete current solicitation and every addendum. Reconcile the deadline, eligibility and document baseline to the controlling material, rather than relying on an older notice or this guide.

## What the scope boundary means for the estimate

The November 2025 overview is an early procurement baseline, not proof that the later RFP or addenda retained every element. Use it to organize the review, then reconcile each item with the issued proposal documents:

- **Seventh Avenue:** The overview describes two street-to-mezzanine elevators, a three-stop elevator to the two platforms, two escalator replacements, platform reconstruction and track work. Ask where elevator, structural, platform and track packages meet and how their design and quantities are carried.
- **Morrison Avenue-Soundview:** The early plan describes two street-to-platform elevators, two new stairs, platform extensions, canopy and control areas. Compare structural supports, elevator equipment, roofing and fare-control interfaces by platform.
- **Second Avenue:** The early plan describes three elevators, a mezzanine ramp, platform work and track reconstruction. Review the connections between elevator landings, the ramp, fare controls and altered platform elevations.

The overview also described a separate long-term elevator maintenance contract. Check the later procurement documents for its boundary, handover and pricing treatment; do not assume maintenance is included in the construction trade quote. Record each unresolved interface against its drawing or specification and responsible trade.

## Project-specific documents and questions

Obtain the solicitation instructions, drawings, specifications, project overview, available existing-condition information and all revisions. Assign an owner to answer these questions against that baseline:

- Which issued drawings confirm or change the earlier elevator, platform and track concepts at each station?
- Who carries elevator supports, machine/control rooms, platform reconstruction, track work and associated testing at each station?
- For a subcontractor, which prequalified design-builder is seeking the trade and what document baseline is it using?

For each answer, record the controlling sheet or clause, responsible trade, estimate treatment and the owner of the remaining decision. Reissue affected inquiries when an addendum changes that basis.

## Keep the review tied to the issued package

Use the [NYC public bid review checklist](https://piper-ai.com/resources/nyc-public-construction-bid-review-checklist), [addenda management for estimators](https://piper-ai.com/resources/construction-addenda-management-for-gc-estimators), [rail and airport prebid access review](https://piper-ai.com/resources/nyc-rail-airport-prebid-access-review) to structure the review. The NYC public project guides provide a directory of related packages.

For an issued document set, [Piper scope generation](https://piper-ai.com/use-cases/scope-generation) can help prepare a scope for review; check the resulting references and trade assignments against the current package.
