---
title: 'Accessibility in renovation bids: trace the altered area to the scope'
url: 'https://piper-ai.com/resources/accessibility-alteration-bid-scope'
description: 'Review accessibility interfaces in an alteration by tracing the documented design into routes, doors, finishes and trade scope, with applicability questions visible.'
contentTypes: [guide]
publishedAt: '2026-11-17T14:43:46.661Z'
updatedAt: '2026-11-17T14:43:46.669Z'
author: 'Ido Gedanken, CEO'
readingTime: 2
---

# Accessibility in renovation bids: trace the altered area to the scope

In a renovation bid, map the altered area and its connections before assuming accessibility work stops at the tenant boundary. The estimator's job is to identify a possible scope gap and get the design team to decide the applicable requirements, not to declare the building compliant.

The [US Access Board's alterations guide](https://www.access-board.gov/files/ada/guides/alterations.pdf) explains that the scope of an alteration affects application of the ADA Standards and that additional requirements can apply to an area containing a primary function. The standards contain conditions and exceptions. Applicable federal, state and local requirements and the actual design must be evaluated for the project; this is not a legal or design determination.

## Trace the documented route and connected spaces

Mark the proposed altered area, entrances, route, changes in level, doors and restrooms shown in the bid set. Compare existing-condition surveys with the architectural plans and landlord work letter. Ask which facilities serve the altered area, who controls them, what work is designed and whether the drawings include necessary details. [Confirm the project code basis](https://piper-ai.com/resources/construction-code-requirements-scope-review) and [review tenant improvement scope boundaries](https://piper-ai.com/resources/tenant-improvement-preconstruction-scope-review) before pricing assumptions harden.

## Example: tenant renovation with a shared restroom

Illustration: a tenant fit-out modifies an office suite. The drawings show a shared corridor restroom outside the tenant lease line but do not describe whether it will be altered. The landlord work letter is silent and the plumbing quote covers fixtures within the suite only. This is an unresolved scope and design question, not evidence that a restroom alteration is automatically required.

| Interface | Existing evidence | Bid decision |
| --- | --- | --- |
| Suite entrance and door | Plans show new door | Price indicated work; seek missing hardware detail |
| Route through common corridor | Route shown without existing dimensions | Request survey and design-team assessment |
| Shared restroom | Outside tenant plan; scope silent | Ask who assesses and funds any required work |
| Finishes and plumbing | Quotes limited to suite | Obtain revised scopes if design adds work |

Send an RFI identifying the altered area, the common route, the restroom and the missing assignment. Request a design response and landlord/owner scope decision before the bid deadline. If no answer arrives, follow bid instructions for a specific assumption or allowance, identify what was not measured, and record how an answer could change trades and schedule. Do not apply a guessed lump sum to the whole building.

## Handoff the open decision

Give the project team the drawing versions, survey limitations, RFI, assumed boundary, trade quotes and estimate line. If the design changes, update demolition, framing, finishes, doors, plumbing and access as relevant. The design team and appropriate advisers determine compliance and applicable exceptions.
