---
title: 'Advancing Nuclear Power Construction 2027: send your chief estimator and your quality lead together'
url: 'https://piper-ai.com/resources/advancing-nuclear-power-construction-2027-guide'
description: 'Advancing Nuclear Power Construction runs Jan. 19–21, 2027 in Dallas. Prices, the precon sessions, and why a GC should send estimating and QA together.'
contentTypes: [guide]
publishedAt: '2026-11-23T12:00:00.000Z'
author: 'Ido Gedanken, CEO'
readingTime: 7
---

# Advancing Nuclear Power Construction 2027: send your chief estimator and your quality lead together

1. Dates and place: Jan. 19–21, 2027, Hyatt Regency Dallas, with a workshop day on Jan. 19
2. Contractor rates are $2,249 for the conference or $3,007 with the workshop day if booked by Dec. 18, 2026
3. Two Jan. 20 sessions are directly about nuclear preconstruction and estimating
4. Nuclear quality requirements change the scope and the estimate, so the quality lead belongs in the room with precon

**Advancing Nuclear Power Construction 2027 runs Tuesday, Jan. 19 to Thursday, Jan. 21, 2027, at the Hyatt Regency Dallas, 300 Reunion Blvd.** Jan. 19 is a pre-conference workshop day; the main conference is Jan. 20–21. Contractor pricing starts at $2,249 for the conference alone if booked by Dec. 18, 2026. The organizer, Hanson Wade's Advancing Construction team, describes it as the first event built entirely around U.S. nuclear construction.

Of the niche January events, this is one of the few with sessions that are actually about nuclear preconstruction and estimating. It is also small and expensive for its size. Our view: a GC should go only if it has a real intent to pursue nuclear or nuclear-adjacent work in the next few years, and then it should send two people: the chief estimator or precon director who will own the first estimate, and the quality manager who will own the quality program. On nuclear work those are not separate conversations. The quality requirements are part of the scope, and an estimator who hears them second-hand will price them as overhead.

Facts below come from the official [event site](https://advancing-nuclear-power-construction.com/), its [workshop day](https://advancing-nuclear-power-construction.com/pre-conference-day/), [day one](https://advancing-nuclear-power-construction.com/day-one/) and [day two](https://advancing-nuclear-power-construction.com/day-two/) agendas, [registration](https://advancing-nuclear-power-construction.com/register/), [venue](https://advancing-nuclear-power-construction.com/venue-accommodation/) and [who should attend](https://advancing-nuclear-power-construction.com/who-should-attend-2027/) pages, checked Nov. 23, 2026.

## Logistics at a glance

| Item | Detail |
| --- | --- |
| Workshop day | Tuesday, Jan. 19, 2027, 9:00 AM to 5:30 PM |
| Conference day 1 | Wednesday, Jan. 20, 7:30 AM to 4:50 PM |
| Conference day 2 | Thursday, Jan. 21, 7:30 AM to 3:30 PM |
| Venue | Hyatt Regency Dallas, 300 Reunion Blvd, Dallas, TX 75207 |
| Booking deadline | Register by Friday, Dec. 18, 2026 to save $200 |
| Group discount | 10% for 3, 15% for 4, 20% for 5 or more from one company, booked and paid together |
| Credits | None listed |

## What it costs

Prices are in U.S. dollars and exclude taxes. The organizer says bookings are subject to approval.

| Category | Conference and workshop day | Conference only |
| --- | --- | --- |
| MEP and trade contractors, engineering and design, EPCs | $3,007 by Dec. 18 ($3,207 at the door) | $2,249 by Dec. 18 ($2,449 at the door) |
| Owners and developers, utilities, reactor technology developers | $2,647 by Dec. 18 ($2,847 at the door) | $1,849 by Dec. 18 ($2,049 at the door) |
| Technology and solution providers | $4,397 by Dec. 18 ($4,597 at the door) | $3,199 by Dec. 18 ($3,399 at the door) |

General contractors are not named in a price category. The closest is the first row, which covers trade contractors and EPCs. Confirm your category with the organizer before booking.

## The sessions worth a precon seat

### Workshop day, Jan. 19

- **Accelerating Delivery by Transforming NRC Licensing into an Actionable Playbook**, 10:00 AM, Benjamin Holtzman, Director of New Nuclear at the Nuclear Energy Institute. The agenda frames it around sequencing long-lead purchases and site work against licensing. For an estimator, that is the question of what can be bought and mobilized before a license milestone, and what it costs to hold a price until then.
- **Securing Commercial Growth and Contracts Through an Advanced NQA-1 Program**, 1:00 PM, Ryan Kinney, Chief Nuclear Engineer at Black & Veatch.
- **Winning Nuclear Work as an Aspiring Subcontractor**, 3:30 PM, Craig Fritts, Nuclear Program Director at Icon Mechanical. Useful from both sides: how EPCs and owners shortlist partners, and what your own subs will need to show you.

The workshop day is the main reason to pay the higher rate. NQA-1 is the nuclear quality assurance standard, and two sessions on the program are built around it. A firm that has never operated under one is likely to price it as paperwork rather than as staff, inspection and records.

### Day one, Jan. 20: the precon afternoon

- **Getting Preconstruction Right: Planning the First Build Before You Break Ground**, 1:45 PM, James Teague, Director of Preconstruction at Fessler & Bowman Inc. The agenda lists the preconstruction estimate, constructability and long-lead decisions.
- **Advanced Work Packaging and Project Controls for a First-of-a-Kind Build**, 2:15 PM, Justin Garza of Burns & McDonnell and Renee Hopmann of Energy Solutions.
- **Estimating, Scheduling and Structuring the First Nuclear Build**, 2:45 PM, Adam Faircloth, Director of Nuclear Program Integrations at Day & Zimmermann. The agenda mentions a credible estimate, a man-hour basis and EPC versus EPCM risk.

These three run back to back, which makes Wednesday afternoon the core of the event for a precon team.

Earlier that day: the opening panel **Demand Rich, Delivery Poor** (8:30 AM) with Faircloth, Holtzman and Chad Boyer of EPRI; **Restarting Duane Arnold** (9:15 AM) with Dan Deboer of NextEra Energy; **Restarting Three Mile Island as Crane Clean Energy Center** (11:15 AM) with Bradley Kreifels of Constellation, which the agenda describes as 25 concurrent projects and 27,000 activities; **Building the AP1000 Fleet** (11:45 AM) with Sean Burk of Burns & McDonnell; and **Building an NQA-1 Program and Commercial Grade Dedication** (12:15 PM) with Randy Maxwell of PPI Quality & Engineering. David Brock of SaskPower closes the day at 4:15 PM.

### Day two, Jan. 21

- **Assembling the First Fleet: The Whole Supply Chain, in One Room**, 8:30 AM, with Kreifels (Constellation), Brock (SaskPower), Bradley Smalldridge (Fluor) and James Chesnut (Day & Zimmermann).
- **Learning from the Last Builds: Vogtle, Olkiluoto and Barakah**, 9:15 AM. Speakers were not listed when we checked.
- **Design One, Build Many: Escaping the Fifty-Designs Trap**, 10:45 AM, Russell Milam of Fluor.
- **Modularizing the Build: Finding the Goldilocks Zone**, 11:15 AM, Adam Garcia of Black & Veatch.
- A workforce panel at 1:15 PM and a labor roundtable at 2:00 PM, then a fireside chat on how developers, owners and off-takers fund new nuclear at 2:45 PM with Clay Williams of X-energy.

## What a precon team should listen for

**Where the quality boundary sits in the scope.** On a nuclear site, the same trade can be doing safety-related and non-safety-related work. The quality program attached to each is different: qualified suppliers, traceable material, documented inspections, records turned over at the end. If a scope sheet does not say which side of that line a package sits on, two sub proposals for "the same" work are not comparable. Listen for how EPCs draw that line and how early they know it.

**What commercial grade dedication costs and who carries it.** Dedicating a commercial item for safety-related use takes engineering, testing and paperwork. Someone pays for it: the supplier, the sub or the GC. Find out how experienced firms allocate it in their packages.

**How design maturity is treated in a first-of-a-kind estimate.** The Fluor session on standardization and the restart case studies come at the same problem from two sides. A restart prices existing conditions; a new build may price a design that is still moving. Our piece on [pricing design intent when drawings are incomplete](https://piper-ai.com/resources/design-intent-estimating-incomplete-drawings) covers how to keep those assumptions visible.

**Man-hours, not just unit prices.** The Day & Zimmermann session mentions a man-hour basis. On work where productivity is shaped by quality hold points and access restrictions, a unit-price history from commercial jobs will mislead.

**Long-lead purchases against licensing.** Ask when owners are willing to release procurement before key approvals, and what price-hold or escalation terms come with that.

If your firm already works on federal projects with formal quality control plans, our guide to [pricing a contractor quality control system](https://piper-ai.com/resources/federal-construction-quality-control-bid-scope) is a useful starting point; nuclear is stricter, but the logic of pricing the system the contract requires is the same.

## Who attends

The organizer lists owners and developers, EPCs, general contractors, MEP and specialty contractors, engineering and design firms, reactor technology vendors and utilities. It cites 60+ attendees, 18+ speakers (80% director level and above), 40% of the agenda dedicated to networking, three workshops and 6+ hours of workshop content. Its pitch to general contractors is learning how to enter the nuclear market and understand qualification requirements.

Sixty-plus people is a small room. That is a disadvantage if you want breadth and an advantage if you want a real conversation with the EPCs and utilities that will be choosing partners. Being qualified to bid and having a scope your team can price are different tests; our piece on [prequalification versus bid review](https://piper-ai.com/resources/subcontractor-prequalification-vs-bid-review) draws that line.

## Practical tips

- **Book by Dec. 18, 2026.** The saving is $200 per registration, and the group discount applies only when colleagues book and pay together.
- **Hotel:** the venue page lists no room-block rate and warns about fraudulent callers offering hotel bookings. Book only through official links from the event manager.
- **Getting there:** the organizer says the Hyatt Regency Dallas connects directly to DART light rail and is about 20 minutes from Love Field and 30 minutes from DFW.
- **Agenda brochure:** downloadable from the site through a form.
- **Contact:** construction@hansonwade.com, per the organizer.
- **Bring your questions on paper.** Before you go, list what your team does not yet know how to price on nuclear work: QA staffing, dedication, records turnover, access and security time. Use the roundtables to fill it in.

## Where Piper fits when quality requirements are scope

On nuclear work, the requirements that move the number are spread across the specification, the quality program and the contract, not just the drawings. They have to reach every trade package, every sub comparison and the final bid, and they change as the design matures.

Piper is an AI operating system for preconstruction that carries one evolving understanding of the project and of the company's own standards through each of those steps. A [survey](https://piper-ai.com/use-cases/survey) can ask the same questions on every project (which scope is safety-related, what records are required, which items need dedication) and return answers tied to the source pages. [Scope generation](https://piper-ai.com/use-cases/scope-generation) writes those boundaries into each package, [bid leveling](https://piper-ai.com/use-cases/bid-leveling) shows which subs carried the quality work and which left it out, and [quantity takeoff](https://piper-ai.com/use-cases/takeoff) measures the drawings from the same project. It can also [draft a schedule](https://piper-ai.com/use-cases/scheduling) from the project documents as a starting point for long-lead sequencing. The estimator decides what to carry. A demo request sits at the bottom of this page if you want to see it on your own documents.

### When and where is Advancing Nuclear Power Construction 2027?

Jan. 19–21, 2027, at the Hyatt Regency Dallas, 300 Reunion Blvd, Dallas, Texas. Jan. 19 is a workshop day and the main conference runs Jan. 20–21, per the organizer.

### How much does registration cost for a contractor?

The organizer's trade contractor and EPC category is $2,249 for the conference only or $3,007 with the workshop day if booked by Dec. 18, 2026, and $200 more at the door. Prices exclude taxes. General contractors are not named in a category, so confirm yours with the organizer.

### Are there sessions on nuclear estimating?

Yes. On Jan. 20, the agenda lists "Getting Preconstruction Right: Planning the First Build Before You Break Ground" at 1:45 PM and "Estimating, Scheduling and Structuring the First Nuclear Build" at 2:45 PM.

### Does the event offer continuing education credits?

None are listed on the event site.
