---
title: 'Advancing Prefabrication 2027: why the prefab decision belongs to preconstruction'
url: 'https://piper-ai.com/resources/advancing-prefabrication-2027-guide'
description: 'Advancing Prefabrication 2027 runs Feb. 23–25 in Glendale, Ariz. Dates, pass prices before Dec. 18, the precon track and what a GC estimator should listen for.'
contentTypes: [guide]
publishedAt: '2026-11-23T12:00:00.000Z'
author: 'Ido Gedanken, CEO'
readingTime: 7
---

# Advancing Prefabrication 2027: why the prefab decision belongs to preconstruction

1. Dates and place: Feb. 23–25, 2027, Renaissance Phoenix Glendale Hotel & Conference Center, Glendale, Ariz.
2. A contractor conference-only pass is $2,149 if booked by Dec. 18, 2026; the door price is $2,649
3. Prefab moves scope from the field to the shop and pulls design freeze earlier, so the estimator should be part of the decision
4. For a GC precon leader, Wednesday afternoon's precon track and the owner forum are the core of the trip

**Advancing Prefabrication 2027 runs Feb. 23–25, 2027 at the Renaissance Phoenix Glendale Hotel & Conference Center in Glendale, Ariz., with a workshop day on Tuesday, Feb. 23 and two conference days after it.** The organizer, Hanson Wade Group's Advancing Construction division, bills it as the largest and longest-running prefab conference in North America, now in its tenth year. A contractor's conference-only pass is $2,149 if booked by Dec. 18, 2026.

Our position: whether a scope gets prefabricated is a preconstruction decision, and it is usually made without the estimator in the room. Prefab moves work from field trades to a shop, redraws the boundaries between trades at every module interface, and pulls the date the design has to be frozen forward. All three land in the estimate. A GC that sends only its VDC lead or its operations team to this conference will come home with a strategy the bid desk then has to price after the fact. Send the precon leader, on a conference-only pass, and point them at the Wednesday afternoon precon track and the owner sessions.

Facts below come from the organizer's [event site](https://advancing-prefabrication.com/), [workshop day](https://advancing-prefabrication.com/pre-conference-day/), [day one](https://advancing-prefabrication.com/day-one/) and [day two](https://advancing-prefabrication.com/day-two/) agendas, [registration](https://advancing-prefabrication.com/register/), [venue](https://advancing-prefabrication.com/venue-accommodation/), [about](https://advancing-prefabrication.com/about/about-event/), [audience](https://advancing-prefabrication.com/about/who-is-this-event-for/) and [facility tour](https://advancing-prefabrication.com/about/exclusive-facility-tours/) pages, checked Nov. 23, 2026. One conflict: a sibling Hanson Wade event site lists Advancing Prefabrication as April 2027, but the event's own site says Feb. 23–25, and that is the date to plan around.

## Logistics at a glance

| Item | Detail |
| --- | --- |
| Workshop day | Tue. Feb. 23, 2027: check-in 8:00 AM, workshops 9:00 AM–5:00 PM, Cement Mixer reception from 5:00 PM |
| Conference day 1 | Wed. Feb. 24, 2027, 7:00 AM–5:30 PM |
| Conference day 2 | Thu. Feb. 25, 2027, from 7:30 AM (end time not published on the agenda when checked) |
| Venue | Renaissance Phoenix Glendale Hotel & Conference Center, 9495 W Entertainment Blvd, Glendale, AZ 85305 |
| Format | Workshop day, six conference tracks, exhibition, optional offsite facility tours |
| Hotel block | $299++ a night, Sun. Feb. 21 to Thu. Feb. 25, cutoff Jan. 24, 2027 |

The hotel is in the Westgate Entertainment District, about 20 miles from Phoenix Sky Harbor, per the organizer.

## What it costs

Prices depend on what kind of company you work for. These are the organizer's rates for contractors, trades and modular construction partners.

| Contractor pass | Booked by Dec. 18, 2026 | Door price |
| --- | --- | --- |
| Conference Only | $2,149 | $2,649 |
| Conference and 1 Tour | $2,499 | $2,999 |
| Conference and Workshop Day | $2,947 | $3,447 |
| Conference, Workshop Day and 1 Tour | $3,297 | $3,797 |

Clients, architects and structural engineering firms pay $1,749 to $2,757 before Dec. 18 depending on the package. Software, tools, materials and solution providers pay $3,149 for the conference only or $4,347 with the workshop day. Offsite facility tours are also listed as a $350 add-on per session, with 60 places per tour. Group discounts are 10% for three people, 15% for five and 20% for seven or more from one company, booked and paid together.

## The sessions worth a precon seat

Times are as the organizer lists them. Six tracks run in parallel on Wednesday afternoon, so decide in advance.

### Wednesday afternoon: the precon track

The **Preconstruction & Project Management** track runs at 1:00 PM and 2:00 PM on Wed. Feb. 24, with sessions on **establishing a prefabrication process map** and **strengthening client involvement**. Speakers listed include Stan Chiu of HDR, Haley Ashway of JE Dunn and Matt Hardy of Robins & Morton.

What to listen for is where prefab sits on the precon timeline. A process map that shows the module design freeze, shop drawing approval and fabrication release also shows the date after which a design change stops being a revision and becomes rework in a shop. Ask when the speakers lock the module scope relative to the design stage, and how that date gets into the owner's schedule and the contract.

The **Project Set Up & Planning** track runs in the same slots: a client's account of calculating the value of prefab against traditional construction on a lifecycle basis (Michael Larson of DTE Vantage), and a panel on **prioritizing integration of contractors earlier**, with Sara Curry of JE Dunn among the panelists. If your firm is the one making the case for prefab on a pursuit, this track shows how an owner checks the math.

### Thursday morning: two case studies with precon lessons

- **"Orchestrating $1.5BN+ of Offsite Manufacturing to Deliver a Mega-Scale Project,"** Thu. Feb. 25, 8:10 AM, Adam Tarr of Hoffman Construction. The organizer describes the project as roughly 3,000 modules. At that scale, the interfaces between modules and site work are their own scope.
- **"Modular Interim Passenger Corridors at SFO Terminal 3 West,"** 9:00 AM, Tim Annin of Gensler. The organizer notes that fabrication started at 75% design. That is the sentence a precon team should think hardest about: when fabrication starts before design is complete, the estimate for the fabricated scope is fixed earlier than the rest of the job, and whatever the last 25% of design changes has to be priced as a change to work already built.

### Thursday midday: procurement and hybrid decisions

Thursday's tracks, 11:15 AM–2:00 PM, include a panel on owner contract frameworks for multiyear, multi-project procurement, **DPR's comparison of full prefab and hybrid stick-built expansions**, a session from Clayco on fast-tracking prefab capabilities, and one from Rosendin on synchronizing material, production and construction flow. The DPR session is the closest thing on the program to a leveling problem: the same scope priced two ways, where the shop premium has to be weighed against general conditions, crane time and schedule.

### The owners

**The Client Collective**, Wed. Feb. 24 at 4:30 PM, is an owner forum. Panelists listed include Ryan Berry of Providence, John Moebes of Crate & Barrel, Eric Roark of NexCore and Bob McCain of HCA. It follows the **Market Matters** roundtables at 3:45 PM. For a GC pursuing healthcare or repeat-program work, hearing how owners set prefab expectations before a GC is selected is the best hour of the conference.

### Workshop day

Tuesday's nine workshops (9:00 AM–5:00 PM) are pitched at three levels and focus on running prefab operations: shop footprints, productization, robotics, workforce and BIM-to-fabrication workflows, with specialty contractors such as U.S. Engineering, Staff Electric and Cleveland Electric among the leaders. Two midday panels cover quantifying the value of prefab business lines and prefab beyond the data center cycle. This day is for firms that run, or are about to build, a shop. A GC precon leader without one can skip it, or book a facility tour instead: the organizer lists tours of a modular facility in Chandler and a ballpark development in Glendale on Feb. 23.

The Wednesday keynote at 10:40 AM, from economist Anirban Basu of Sage Policy Group, covers the 2027 economic outlook.

## Who attends

The organizer describes an audience of 1,000+ clients, contractors, prefabricators, designers and solution providers, including precon leaders alongside prefab, technology and operations leaders and the C-suite. It lists data centers, healthcare, multifamily and commercial, public and federal, education and advanced manufacturing as the markets covered, with 75+ speakers, nine workshops and six tracks. There is also an exhibition floor.

## Practical tips

- **Book by Dec. 18, 2026.** Contractor prices rise by $500 at the door.
- **Reserve tours early.** Each has 60 places, first come, first served.
- **Book the hotel before Jan. 24, 2027.** The organizer says rooms may sell out sooner. Booking details for the block are on the venue page.
- **Bring one pursuit.** Pick a current job where prefab is on the table, with the multi-trade scope you would move to a shop, and ask the precon track speakers how they would draw the interfaces: supports and hangers, connections between modules, field tie-ins, testing, transport, picks and damage in transit. Our guides to [MEP coordination in precon scope](https://piper-ai.com/resources/mep-coordination-preconstruction-scope) and [HVAC scope gaps and double-ups](https://piper-ai.com/resources/hvac-scope-gaps-and-double-ups-bid-leveling) cover where those lines usually break.
- **Plan logistics questions too.** Modules need laydown, delivery windows and crane picks that a stick-built estimate never carried. See our [logistics plan estimate review](https://piper-ai.com/resources/construction-logistics-plan-estimate-review).

## Where Piper fits when prefab changes the scope

The hard part of pricing prefab is not the shop number. It is keeping track of what moved: which scope left the field trades, which trade picks up each interface, and which design stage the fabricated scope was frozen at. When those facts live in separate conversations between VDC, the shop and the bid desk, the next addendum lands in one place and not the others.

Piper is an AI operating system for preconstruction that keeps one evolving understanding of the project and of the company's own scope standards. [Quantity takeoff](https://piper-ai.com/use-cases/takeoff) on the drawings measures the lengths, areas and counts that size a prefab candidate. [Scope generation](https://piper-ai.com/use-cases/scope-generation) can write the shop and field scopes with the interface lines stated, and [bid leveling](https://piper-ai.com/use-cases/bid-leveling) compares a prefab proposal and a stick-built proposal against that same intended scope rather than against each other. The precon team decides what gets built in the shop. If you want to see it on a real package, there is a demo request at the bottom of this page.

### When and where is Advancing Prefabrication 2027?

Feb. 23–25, 2027, at the Renaissance Phoenix Glendale Hotel & Conference Center, 9495 W Entertainment Blvd, Glendale, Ariz. Feb. 23 is a workshop day and the conference runs Feb. 24–25, according to the organizer.

### How much does Advancing Prefabrication 2027 cost?

For contractors, trades and modular partners, $2,149 for the conference only and up to $3,297 with the workshop day and a tour, if booked by Dec. 18, 2026. Door prices are $500 higher. Clients, architects and structural engineers pay less; solution providers pay more.

### Is there a preconstruction track?

Yes. The Preconstruction & Project Management track runs Wednesday, Feb. 24 at 1:00 PM and 2:00 PM, with sessions on prefabrication process mapping and client involvement.

### Is the event in February or April 2027?

The event's own site lists Feb. 23–25, 2027. A sibling Hanson Wade site lists April 2027; the event's own site is the one to follow.
