---
title: 'AGC Lean education: choose the course and company sponsor for production learning'
url: 'https://piper-ai.com/resources/agc-lean-training-preconstruction-field-transfer'
description: 'Choose introductory Lean, the five-unit program or a separate credential pathway based on the production problem and sponsor’s ability to act.'
contentTypes: [guide]
publishedAt: '2026-11-23T11:04:07.629Z'
author: 'Ido Gedanken, CEO'
readingTime: 2
---

# AGC Lean education: choose the course and company sponsor for production learning

Choose Lean 101 when the immediate need is an introduction. Choose the full second-edition program when a participant and company sponsor can apply its production and problem-solving concepts to an identified handoff. Treat the CM-Lean exam as a separate credential decision, not as an automatic consequence of attending a class.

[AGC's program information](https://www.agc.org/education/lean-construction-education-program-archive) distinguishes optional Lean 101, the five-course program and a separate credential exam application. The [second-edition learning objectives](https://edge.agc.org/wp-content/uploads/2023/06/LCEP-2-Learning-Objectives.pdf) emphasize production, value, waste and flow, the Last Planner System, problem-solving and application beyond field production. They are intended learning outcomes, not evidence of a cost or schedule improvement.

## Select a participant and a sponsor

| Need | Participant | Sponsor's commitment |
| --- | --- | --- |
| Explore the terminology before a larger investment | A manager who can assess relevance of Lean 101 | Decide what evidence would justify further training |
| Improve production planning or a repeated handoff | A preconstruction or field leader who can change the work being studied | Protect course time and convene the other affected discipline |
| Pursue CM-Lean | A participant prepared to complete the applicable education and separately follow the credential process | Confirm current exam requirements and resources with AGC |

The [AGC NYS calendar](https://www.agcnys.org/calendar/) listed a virtual cohort on November 3, 4, 17 and 18, 2026. At the November 17 source check it was underway, not an invitation to assume late enrollment. Verify the next actual offering with the organizer; no later date is established here.

## Test one readiness assumption with the field

As an illustrative exercise, an estimator records the assumed date that a work area will be ready for a trade and the estimate's access and material assumptions. The participant brings that record to a superintendent and trade partner, asks what must be ready first and who can confirm it, and records the answer and unresolved constraint. The sponsor decides whether the estimate or handoff needs revision. This is a proposed learning exercise, not an observed project result.

The broader feedback process belongs in [connecting estimating and field evidence](https://piper-ai.com/resources/closing-the-loop-between-estimating-and-the-field). Keep the project's [baseline, update and lookahead](https://piper-ai.com/resources/construction-schedule-baseline-update-lookahead) distinct while deciding which commitment is ready to be made.
