# AGC MA leadership academy spring 2027: evaluate the learning commitment for a preconstruction leader

AGC MA's [Leadership in the Built Environment Academy](https://members.agcmass.org/events/details/leadership-in-the-built-environment-academy-4684) combines sessions at Wentworth in Boston with online learning. The organizer lists sessions from February 25 through March 19, 2027, and an earlier virtual orientation. Confirm the current schedule, availability and terms directly before committing.

A preconstruction manager who needs to lead decisions across estimating, operations and design may find the program relevant. The organizer describes it for managers, project leaders and directors, emphasizes women and allies, and says it is open to all. Treat it as leadership development, not a technical estimating credential or a promise of career outcomes. If the immediate need is code instruction or a specialist technical qualification, first define that need and compare a relevant technical option.

## Make an attendance and coverage plan

Block the listed sessions and the orientation after confirming their current dates and format. Add travel time for Boston sessions and reserve uninterrupted time for online work. Name a deputy for bid decisions during each absence, and identify which decisions require the attendee's approval in advance. The organizer's listing, not this planning example, controls the actual program logistics.

| Before enrollment | During the program | After each session |
| --- | --- | --- |
| Confirm dates, delivery, prerequisites and current price with organizer | Deputy owns the bid calendar and escalates decisions outside delegated authority | Share one applicable lesson and record a next action |
| Choose a real cross-functional decision and protect confidential details | Keep a short decision log without attributing unobserved outcomes to the course | Test the action with the project team and record the result |

## Bring one decision to coaching

An illustrative issue: estimating and operations disagree about which trade should carry temporary protection at an occupied renovation. Bring a sanitized description of the decision, the two proposed package boundaries, the schedule constraint, and the current source references. Ask how to secure the right participants and make the decision visible, rather than asking the program to decide the contract allocation.

Back at work, assign a decision owner, document the trade responsibilities and circulate the result to the affected package leads. If the documents do not resolve the interface, identify the responsible person for a clarification and maintain the estimate assumption until it is answered. The [scope generation and review](https://piper-ai.com/resources/construction-scope-generation-guide) guide shows how to preserve the source and decision alongside the scope.

Recheck the organizer's live listing for orientation, session dates, format, enrollment and pricing before acting. The examples here are suggested preparation, not a claim about actual coaching content or results.