# AGC MA passive house builder training January 2027: choose the project role before buying a seat

Choose the January builder course for a person who can use the learning in field execution: installation sequence, enclosure continuity, quality records and trade handoffs. Give that person a project task before reserving the seat, and keep independent verification as a separate role decision.

## The January builder cohort and its field focus

AGC MA lists a builder course in Wellesley January 27–29, 2027, with self-paced content followed by three in-person days and an exam after instruction. The organizer describes airtight enclosures, windows, field QA and site management. Recheck schedule and enrollment terms. Source: [AGC MA passive house builder training January 2027: choose the project role before buying a seat](https://members.agcmass.org/events/details/certified-passive-house-builder-in-person-4687).

## Give the learner an enclosure handoff to investigate

The questions below are a suggested preparation tool; they are not announced session findings or project requirements.

| Item | Evidence or topic | Question and next evidence |
| --- | --- | --- |
| Envelope detail | Field lead reviews the detail with the designer. | Identify the continuity point and unresolved construction sequence. |
| Windows and interfaces | Installer and adjacent enclosure trades coordinate their boundaries. | Request the approved detail and the inspection or QA record required by the project. |
| Airtightness and field QA | Field team prepares work for the assigned testing party. | Identify access, readiness, documentation and correction responsibilities. |
| Site management | Superintendent sequences trades and protects completed work. | Confirm who records issues and obtains designer direction. |

## Bring installation and QA questions back to the team

Use the table as a suggested handoff exercise, not a course syllabus or a substitute for project specifications. An estimator can ask the attendee to return with questions for the envelope scope, the intended QA evidence and any trade boundary that needs a priced clarification.

## Separate builder execution from verification

This course suits a field implementation role; an independent testing or verification role calls for a separate review of verifier training and prerequisites. Attendance alone does not certify a building or confer design authority. Confirm the requirements and project-specific role before purchase.

After training, bring the unresolved installation and QA handoffs into the [project scope review](https://piper-ai.com/resources/construction-scope-generation-guide). Use current design details to assign the work; the course example does not replace a project requirement.