---
title: 'AGC NYS Construction Industry Conference 2026: the sessions that change what you carry'
url: 'https://piper-ai.com/resources/agc-nys-construction-industry-conference-2026-guide'
description: 'AGC NYS''s 40th Construction Industry Conference runs Dec. 8–10, 2026 in Saratoga Springs. Cost, hotels and the sessions that matter for precon.'
contentTypes: [guide]
publishedAt: '2026-11-23T12:00:00.000Z'
author: 'Ido Gedanken, CEO'
readingTime: 6
---

# AGC NYS Construction Industry Conference 2026: the sessions that change what you carry

1. Dates and place: Dec. 8–10, 2026, Saratoga Hilton and Saratoga City Center, Saratoga Springs, N.Y.
2. General registration is $375 after the Nov. 20 early rate of $350, per AGC NYS
3. The most useful sessions for precon are the public-work rules (DBE bid requirements, prevailing wage, delay and liquidated damages), not the AI keynotes
4. Wednesday, Dec. 9 is the dense day, with the trade show, two workshop blocks and most of the bidding-relevant sessions

**The 2026 AGC NYS/Adams LeClair LLP Construction Industry Conference, the 40th annual, runs Dec. 8–10, 2026 at the Saratoga Hilton and Saratoga City Center in Saratoga Springs, N.Y.** General registration is $375 per person now that the Nov. 20 early rate ($350) has passed. Wednesday, Dec. 9 carries the trade show, the main keynote and most of the workshops.

Our view for estimators and preconstruction managers who bid New York public work: go for the compliance and contract sessions, not the technology headlines. A session on NYSDOT DBE bid requirements or prevailing wage enforcement changes a number you carry on the next bid. A general talk on AI usually does not. The program lists both, and the schedule forces choices, so pick the sessions that touch your carries first.

Sources: the [AGC NYS conference page](https://www.agcnys.org/industry-conference/), the [event calendar listing](https://www.agcnys.org/calendar/2026-agc-nys-construction-industry-conference/) and the [published schedule pamphlet](https://www.agcnys.org/wp-content/uploads/Schedule-Pamphlet-5.pdf), all checked Nov. 23, 2026. The pamphlet does not show every workshop slot, so check the conference app for the full program.

## Logistics at a glance

| Item | Detail |
| --- | --- |
| Dates | Tuesday, Dec. 8 to Thursday, Dec. 10, 2026 |
| Venue | Saratoga Hilton and Saratoga City Center, 534 Broadway, Saratoga Springs, N.Y. |
| General registration | $375 per person after Nov. 20 ($350 before) |
| Tuesday, Dec. 8 | Trainings and workshops (some separately priced) |
| Wednesday, Dec. 9 | 7:30 AM general session, 8:30 AM keynote, workshops from 9:45 AM, trade show from 10:30 AM |
| Thursday, Dec. 10 | Breakfast 7:00 AM, 8:30 AM keynote, workshops from 9:45 AM; conference ends around noon |
| Credits | PDH on many sessions; bring your PE license number to register PDH attendance |

One inconsistency to know about: the calendar listing prints "Albany NY" as the city, while the conference page and pamphlet place the event in Saratoga Springs. The Saratoga Hilton address is the one to plan around.

### Tuesday trainings

Several Tuesday trainings carry their own fees, and some were already sold out when checked: work zone traffic control supervisor training, concrete flatwork and anchor adhesive. Work zone flagger training is listed as free with general registration (the fee printed for it differs between the page and the pamphlet), and a NYSDEC four-hour erosion and sediment control training is $100. These matter more to field and operations staff than to estimators.

## The sessions worth a precon seat

The pamphlet lists no session explicitly about estimating or bid leveling. The relevant content sits in sessions on how public work is procured, paid and disputed. These are the ones we would plan around.

### Bidding and labor-cost rules

- **NYSDOT DBE Bid Requirements**, Wed. Dec. 9, 1:15 PM, with Kara Hogan of NYSDOT. DBE participation goals and good-faith-effort documentation affect sub selection before bid day, not after. If your team leveled a NYSDOT job on price alone and then scrambled for DBE coverage, this is the session.
- **NYSDOL Compliance and Enforcement Updates for NYS Prevailing Wage**, Wed. Dec. 9, 3:45 PM, with NYSDOL staff. Prevailing wage classifications drive labor carries and subcontractor comparisons. Our [prevailing wage and PLA estimate review](https://piper-ai.com/resources/prevailing-wage-pla-construction-estimate-review) covers how those assumptions should show up in a bid.
- **Labor/Human Resources Legislative Update 2026**, Wed. Dec. 9, 11:00 AM, with Frank Kerbein of the Business Council of New York State.

### Schedule, delay and risk

- **Dealing With Delays in Public Work: Schedules, Liquidated Damages, Time Extensions and Delay Claims**, Thu. Dec. 10, 9:45 AM, with Adams LeClair LLP attorneys. A precon team decides how much float and LD exposure it prices. This session is about how those decisions play out later. See our guide on [change directives versus change orders](https://piper-ai.com/resources/construction-change-directive-vs-change-order) for the estimating side of that story.
- **Managing Your Construction Risk, Liability & Insurance**, Wed. Dec. 9, 3:45 PM, with EPIC Brokers. Related: [builder's risk and liability in the estimate](https://piper-ai.com/resources/construction-insurance-builders-risk-liability).
- **Keeping Projects Moving: Dispute Avoidance, ADR, and AI Tools**, Wed. Dec. 9, 2:30 PM, with the American Arbitration Association (1 PDH pending).

### Pipeline and constructability

- **MTA's IBX Project Design Status and Construction Opportunities**, Wed. Dec. 9, 1:15 PM, with Jordan Smith of the MTA. Pipeline sessions are where you learn what is coming and when. Treat what you hear as a lead to verify against official procurement notices, not a bid date.
- **Bridge Constructability: More Than Just a Checklist**, Wed. Dec. 9, 1:15 PM, Colliers Engineering (1 PDH). Constructability review is where design assumptions meet means and methods, which is exactly where scope gaps start.
- **Behind the Build: The New Highmark Stadium**, Wed. Dec. 9, 11:00 AM, with Turner Construction. A GC case study on a large stadium job.

The pamphlet also lists project sessions on the Hunts Point program, LIRR Hall Interlocking, SUNY Oswego's Hewitt Hall and the Livingston Avenue Bridge, plus technical sessions on micropiles and rebar.

### Keynotes and AI sessions

Wednesday opens with a welcome from AGC of America CEO Jeff Shoaf at 7:30 AM and a keynote by former MLB pitcher Jim Abbott at 8:30 AM. Thursday's 8:30 AM keynote covers practical AI in the field. There are also two Wednesday workshops on AI: a general introduction (11:00 AM) and "Artificial Intelligence: Compliance in New York Construction Projects and Disputes" (1:15 PM, 1 PDH pending). Note the timing conflicts: the AI compliance session runs against the DBE bid requirements, MTA pipeline and bridge constructability sessions.

## Who attends

AGC NYS describes the conference as drawing nearly 1,000 attendees. The program leans toward heavy civil, highway and public building work in New York State, with owner agencies (NYSDOT, NYSDOL, MTA) on the agenda. The Wednesday trade show was sold out to exhibitors when checked.

That makes it a fit for estimators and precon leaders at firms that bid state and authority work, and for anyone who manages subcontractor compliance on public jobs. A private-sector commercial GC in New York City will find less on the program aimed at its work.

## Practical tips

- **Book the hotel now.** AGC NYS lists the Saratoga Hilton as selling out, with group rates at the Embassy Suites (86 Congress St.), Holiday Inn (232 Broadway) and Residence Inn (295 Excelsior Ave.).
- **Use the conference app** at agcnys.org/indconfapp to filter PDH-eligible sessions and see the full workshop list.
- **Split the Wednesday 1:15 PM block.** Four relevant sessions run at once. Send one person to DBE requirements and another to the MTA pipeline session if you can.
- **Bring a question for the agencies.** NYSDOT and NYSDOL staff are presenting. "How are good-faith-effort submissions evaluated?" is a better use of Q&A than a general one.
- **Registration questions** go to AGC NYS; contact details are on the conference page.

## Where Piper fits in public-bid review

The sessions above share one problem for precon: rules that change a bid (DBE goals, wage classifications, LD terms, bonding) sit in different documents from the drawings, and they are easy to miss when the team is leveling subs under time pressure.

Piper is an AI operating system for preconstruction that keeps one evolving understanding of the project and its documents. A [survey](https://piper-ai.com/use-cases/survey) can run your company's own pre-bid questions (DBE goal, wage requirements, LD rate, bonding) across the bid documents with each answer linked to its source. [Bid leveling](https://piper-ai.com/use-cases/bid-leveling) compares subcontractor proposals against the intended scope rather than against each other, and a [final bid review](https://piper-ai.com/use-cases/final-bid-review) checks the finished bid against the project requirements before submission. Scope generation, [quantity takeoff](https://piper-ai.com/use-cases/takeoff) on drawings and [schedule drafting](https://piper-ai.com/use-cases/scheduling) work from the same project understanding. Your estimators make the calls. The demo request at the bottom of this page is the place to see it on a real package.

### When and where is the 2026 AGC NYS Construction Industry Conference?

Dec. 8–10, 2026, at the Saratoga Hilton and Saratoga City Center, 534 Broadway, Saratoga Springs, N.Y., according to AGC NYS.

### How much does registration cost?

AGC NYS lists general registration at $375 per person after Nov. 20, 2026, and $350 before. Some Tuesday trainings carry separate fees.

### Are there estimating sessions?

The published schedule pamphlet lists no session specifically on estimating. The most relevant sessions for precon cover NYSDOT DBE bid requirements, prevailing wage enforcement, delay and liquidated damages, risk and insurance, and the MTA IBX pipeline.

### Does the conference offer PDH credits?

Yes. Many sessions are listed with 1 PDH, some pending approval. AGC NYS asks for your PE license number at registration to record PDH attendance.
