# AI site concrete takeoff in Piper: manual, assisted and agentic workflow

1. Choose the measurement basis before choosing manual, assisted or agentic takeoff.
2. Keep curb types, sidewalk thickness zones and structural pads in separate items.
3. Review ramp concrete and detectable warning quantities separately.
4. Check agent-created geometry and item assignments on the source sheets.

For a GC estimator checking a commercial site-concrete package at bid-stage CDs, the useful output is not one flatwork total. It is curb length by section, sidewalk area by thickness, ramps with their associated warning surfaces, and pads tied to the details that define them.

Use Piper to build that breakdown in one editable takeoff file. Draw manually where the measurement needs a deliberate interpretation, use assistance for suitable repeated geometry, and give the agent a bounded task when the sheet coverage and quantity basis are clear. In all three workflows, review the source sheet, scale, geometry and item assignment before carrying quantities. Those are the capabilities described on Piper's [Takeoff page](https://piper-ai.com/use-cases/takeoff).

**Choose the measurement basis first, then the tool.** A correctly traced sidewalk boundary is still the wrong quantity if the driveway crossing belongs to a different thickness item.

This walkthrough is a proposed working method, not a report of a completed project test. It applies to PDF-based quantity review, not licensed accessibility design, structural design or native model takeoff.

## 1. Bring in the sheets that define both extent and section

Bring the drawing PDFs into a takeoff, select the relevant sheets, and set or calibrate their scale. Piper keeps measurements attached to the drawing page they came from, so the reviewer can inspect the basis behind a total rather than work backward from an unexplained number. See the [cross-trade Piper takeoff walkthrough](https://piper-ai.com/resources/ai-takeoff-in-piper) for the broader workflow.

For this package, prepare a short sheet-coverage list before measuring:

- Civil layout and paving plans for the horizontal extent.
- Grading plans for ramps, transitions and changes in elevation.
- Curb, sidewalk, apron and warning-surface details for item classification.
- Electrical or equipment site sheets where a pad or support may be located.
- Structural details for pads, enclosure foundations or retaining walls that require more than a flatwork area.

This is recommended estimating practice, not a claim that Piper automatically establishes which discipline governs every item. Decide which sheet owns each measurement. Use another discipline's sheet to check the item, not to create a second quantity for the same work.

Calibrate the selected sheet against a reliable dimension. Then check a second dimension elsewhere on that sheet before starting a long curb trace or a large area measurement. Treat enlarged details separately from the site plan; do not transfer a plan's scale to a detail without checking it.

Keep the revision basis with your working record. If the quantity uses the revised paving plan but an older section detail, resolve that mismatch before applying thickness. An unresolved detail is a pricing question, not permission to use the last project's assembly. The distinction is developed in [estimating design intent from incomplete drawings](https://piper-ai.com/resources/design-intent-estimating-incomplete-drawings).

## 2. Define the items before drawing their geometry

Set up items around the distinctions the team needs to price and review. For this exercise, use curb and gutter LF by type, sidewalk SF by thickness, ramp counts, warning-surface locations and dimensions, and equipment pads by detail.

A useful official example is [UFGS 32 16 19, Concrete Curbs, Gutters and Sidewalks](https://www.wbdg.org/FFC/DOD/UFGS/UFGS%2032%2016%2019.pdf). Its unit-price provisions measure sidewalks by depth and curbs and gutters by cross section, with curb length measured along the face at the gutter line. It is an editable federal guide specification, not a universal commercial-project measurement rule. Follow the actual contract where it specifies a different basis.

The practical consequence is to establish one reference line for each curb run and retain thickness as an item attribute for each flatwork zone. Do not decide those attributes after everything has been combined.

For the proposed takeoff, separate:

- Each curb or combined curb-and-gutter section identified by the project legend and details.
- Ordinary sidewalk from any driveway-crossing or apron area assigned a different thickness.
- Ramp concrete from ordinary sidewalk, with a stated treatment of shared landings and flares.
- Detectable warning surfaces from the concrete they are installed in.
- Flat equipment pads from pads with thickened edges, foundations or other structural requirements.
- Base, joints and reinforcing where the documents define a separate quantity or scope requirement.

An enclosure or retaining wall should not disappear into a pad area item. If it is in this package, create the measurements its details require, or record the unresolved extent for review.

For broader organization advice, use the separate guide to site-concrete takeoff items and formulas; here the objective is a reviewable Piper takeoff rather than a complete estimating workbook.

## 3. Choose manual, assisted or agentic for each item

Piper supports all three methods in the same editable takeoff file. Manual means the estimator draws the measurements. Assisted means tools propose boundaries, trace connected lines or find similar symbols for the estimator to inspect. Agentic means the estimator gives a measurement task and reviews the editable measurements the agent creates.

The following choices are recommendations for this trade, not measured performance comparisons.

| Site-concrete item | Manual starting point | Assisted starting point | Agentic starting point |
| --- | --- | --- | --- |
| Curb and gutter by type | Draw the chosen reference line through returns and type changes | Trace connected linework then remove branches and unwanted parallel edges | Request each type separately with one specified reference line per run |
| Sidewalk by thickness | Draw each thickness zone and its deductions | Try boundary assistance only where an enclosed area is interpretable and inspect the proposed extent | Request separate editable areas for each documented thickness zone |
| Curb ramps | Locate each ramp and draw its concrete extent deliberately | Find similar symbols if the plan uses a repeatable ramp symbol | Request counts and concrete extents by location with detail references for review |
| Detectable warnings | Count locations and measure the specified surface dimensions | Use matching only where a consistent symbol represents the warning surface | Request a separate item rather than assuming an accessory in every ramp |
| Equipment pads and supports | Measure from the applicable plan and section | Match repeated pad or bollard symbols only when their meanings are consistent | Request pads by type and source sheet leaving unresolved dimensions open |

Use manual work when the difficult part is deciding what belongs in the measurement. Use assistance when the geometry is suitable but still needs candidate cleanup. Use agentic work when you can describe both the scope and the basis well enough to inspect the returned set.

Do not force every item through the same method merely because it is in one trade package.

## 4. Draw the judgment-heavy pieces manually, then clean assisted candidates

Piper's manual workflow supports areas, linear runs, wall surfaces and counts, with deductions, adjustable geometry, curved measurements and repeated units. Apply those tools to the exceptions you have already identified.

For example, draw a small apron as its own area when the detail assigns it a different thickness. Trace a curb return along the selected measurement line rather than drawing a chord across the curve. For a pad with a thickened edge, retain the footprint and the additional section quantity separately so a reviewer can see how the total was assembled.

Next, use assistance selectively:

**Curb tracing.** Start with the intended connected line. Inspect the proposed path before applying it. Check that it follows the chosen curb reference, stops at the work boundary, and does not continue into a gutter edge, pavement outline or unrelated branch. Add or correct geometry manually where necessary.

**Sidewalk boundaries.** Piper describes room-boundary assistance as a tool that proposes an enclosed boundary. Do not assume an outdoor sidewalk with open ends or crossing linework behaves like a closed room. Where the geometry is suitable, try the proposal and inspect every edge. Otherwise, draw the area manually.

**Ramp and bollard symbols.** Select an example only when the plan actually uses a consistent symbol for the item. Inspect candidates for unrelated matches and missed variants before applying them. A matched bollard location is a count candidate, not proof of its foundation dimensions or trade ownership.

Piper's public documentation identifies dense linework, open boundaries, symbol variants and drawing quality as factors affecting assistance. It describes assistance as a starting point requiring review and manual correction, not a complete quantity guarantee.

Keep the automated-selection review bounded here; the detailed failure checklist belongs in AI site-concrete takeoff pitfalls.

## 5. Give the agent a bounded site-concrete measurement task

For agentic work in Piper, assign the measurement set rather than accepting individual assisted candidates yourself. The agent uses drawing-reading, measurement and assistance tools to produce item-grouped geometry that you then review. For site concrete, the assignment needs to say which curb line to follow and how to separate thickness zones. The request below is an illustrative task brief authored for this guide, not a customer quotation or a claim that a test was completed.

> Measure new site concrete within the work boundary on the selected current civil plans. Measure curb and gutter in LF by the types identified in the legend and details. Use one reference line per run, following the project measurement rule; do not count both face and back edges. Measure sidewalk in SF, separated by the thickness zones stated in the details, including separate driveway-crossing and apron areas where their thickness differs. Count curb ramps by location and measure their concrete extent separately from ordinary sidewalk so the areas do not overlap. Create separate detectable warning items using the documented locations and dimensions. Measure equipment pads shown on the selected civil and electrical site sheets, using referenced sections for thickness and thickened edges. Group the editable measurements by item. Leave missing dimensions, unclear type transitions and unresolved scope boundaries for review rather than inventing quantities.

Use this as a pattern, not boilerplate. Replace general references with the actual sheet numbers, detail references, curb types and work limits available in your set.

If that basis is not ready, narrow the task. Asking for curb Type A on one selected sheet is more reviewable than asking for all exterior concrete with unresolved boundaries.

The vendor-neutral end-to-end method is covered in how to do AI site-concrete takeoff; this section shows how to frame that work for Piper's documented agentic workflow.

### Review the returned set on its source sheets

Open a returned curb run on the drawing page it came from. Check the calibrated scale, follow its path through returns and transitions, and compare its assigned type with the civil detail. If the path follows the back edge instead of the specified face, correct its geometry; if it duplicates another run, remove it. These corrections use the same takeoff viewer used for manual work.

For this trade, conduct the review in two passes:

1. **Coverage and classification:** walk the work boundary, check every identified curb type and thickness zone, reconcile ramp locations, and inspect the selected equipment sheets for pads.
2. **Geometry and calculation basis:** inspect curb reference lines, area overlaps, deductions, pad sections and the inputs behind each derived quantity.

Do not make the review only a remeasurement of one convenient sidewalk. The review should also challenge whether a driveway area went to the correct thickness item and whether a ramp has a separate warning-surface quantity where required.

For a warning surface, keep the location, specified width and depth, and any procurement panel breakdown distinct. PROWAG R305.1.4 specifies a minimum 24-inch depth in the direction of travel and full ramp-run width excluding flares where that provision applies. Its applicability depends on the governing accessibility standard and jurisdiction, as explained in the [official public-right-of-way guidelines](https://www.access-board.gov/prowag/complete.html). A ramp count alone therefore does not establish the warning material quantity.

Use a three-part reconciliation for each returned ramp location: **applicable requirement → project detail surface → selected panel layout.** First confirm the governing requirement. Then compare the detail's warning dimensions with that requirement. Only after that check should the team translate the surface into purchased pieces. If the detail and applicable requirement conflict, retain the location and raise the discrepancy rather than treating the agent's measured surface as design approval.

Illustrative only: suppose one ramp location has a 48-inch-wide run excluding flares, and its project detail specifies a rectangular warning surface 48 inches wide by 24 inches deep. If R305.1.4 governs, those dimensions meet the width and minimum-depth provisions cited above, not necessarily every other accessibility requirement. The takeoff records **one ramp location and 8 SF of warning surface**. If the proposed procurement layout uses two hypothetical 24-by-24-inch panels, with no cutting or surplus, it records **two purchased pieces**, not one.

In the Piper review, tie that surface measurement to the ramp location and keep the panel calculation separate from the location count. Reconcile the sum of panel coverage with the detailed surface at each location before rolling up totals. An 8 SF total elsewhere cannot explain a missing surface at this ramp. Actual panel dimensions and installation suitability must come from the selected product's submittal; the hypothetical layout is not a product recommendation.

## 6. Roll reviewed measurements into quantities without hiding the inputs

Piper can roll measurements up by item, classify them through catalogs, and apply price-book references and Excel-style formulas. Your team supplies and reviews the pricing basis.

For a uniform flatwork zone measured in SF with thickness in inches, the geometric concrete volume is:

**Concrete CY = area SF × thickness inches ÷ 12 ÷ 27.**

Illustrative only: 1,200 SF at 4 inches produces 14.81 CY, while a separate 300 SF apron at 6 inches produces 5.56 CY. The combined geometric volume is 20.37 CY before any separately stated procurement allowance. These are hypothetical dimensions, not recommended design thicknesses or Piper test results.

Now carry the classification error through the same illustrative calculation. If the apron is assigned to the 4-inch sidewalk item, all 1,500 SF still appears in the area total, but the formula returns **18.52 CY instead of 20.37 CY**. The geometric quantity is understated by **1.85 CY**, even though no measured area is missing. Checking the combined SF against the plan would not catch this error because the failed input is thickness classification, not boundary geometry.

In Piper, inspect the apron measurement's item assignment against its detail before accepting the formula total. Keep the two area measurements separate even when the estimate eventually combines their concrete purchase volume. That preserves the ability to change one thickness without redrawing the other zone. A procurement allowance should remain separate, not conceal an incorrect thickness basis.

Use the same dimensional calculation for base volume only after confirming its own documented extent and depth. Do not silently reuse the concrete footprint if the base extends beyond it. For a curb section, derive volume from its actual cross-sectional area and the compatible run length rather than assigning a sidewalk thickness to a linear item.

Joints require their own basis. [NRMCA's CIP 6](https://www.nrmca.org/wp-content/uploads/2020/04/06p.pdf) distinguishes contraction, isolation and construction joints by function. In the takeoff, retain the joint type and documented extent instead of treating every line across a sidewalk as interchangeable sawcut LF. Use the project requirements for pricing; association recommendations are not a substitute for the contract's joint layout.

Likewise, derive reinforcing from the applicable details, not an assumed pounds-per-SF factor presented as measured steel. If a pricing assembly includes reinforcing or base, make that inclusion explicit so the same work is not carried again as an add-on.

A separate article covers building a custom site-concrete quantity app in Piper; an app is not necessary to inspect and roll up this takeoff.

## 7. Connect the reviewed takeoff to the package bidders carry

Keep the reviewed quantities alongside the drawings, specifications, trade scopes and bid review in Piper. Takeoff measures how much work is shown; [Scope Generation](https://piper-ai.com/use-cases/scope-generation) defines what each trade carries. They are separate workflows supporting the same project review.

Before issuing or leveling the site-concrete package, use a short handoff record:

- Item, quantity and unit.
- Source plan, revision and governing detail.
- Thickness or cross-section basis.
- Included base, joints, reinforcing and warning surfaces.
- Work assigned elsewhere and the responsible package.
- Open clarification and the estimating treatment pending an answer.

Base ownership deserves an explicit decision. UFGS 32 16 19 notes that major grading and subbase may be covered under other sections and that the guide must be revised where that work belongs in the concrete section. That is an example of why a measured base quantity does not itself settle trade ownership.

Consider a hypothetical package decision using the flatwork example above. Suppose the project detail defines 1,650 SF of base at 6 inches, including its documented extension beyond the 1,500 SF concrete footprint. Measure that base extent separately in Piper: its geometric volume is **30.56 CY**, not the **27.78 CY** obtained by borrowing the concrete footprint. These illustrative quantities exclude procurement and compaction adjustments, whose basis would need separate review.

Now suppose the issued earthwork scope includes supplying and placing that base, while the concrete package excludes it and requires concrete placement over the prepared base. Send the base quantity and detail to the earthwork bidder for confirmation. Give the concrete bidder the same interface basis, clearly identified as work by others rather than an additional concrete-package carry. The detail establishes the quantity; the package language establishes the intended assignment. Neither substitutes for the other.

At bid review, compare each quote with that assignment. If the earthwork quote excludes the base and the concrete quote also excludes it, the GC estimator should hold one explicit base carry pending clarification, with its quantity and pricing basis recorded. Do not convert two exclusions into a zero. If both quotes include the same defined base work, identify the duplicate and obtain an agreed scope and price adjustment before removing either carry. A quantity alone does not justify subtracting an assumed cost from a lump-sum quote.

Use the base item, source detail and bid qualifications together in the project review. Once responsibility is confirmed, replace the temporary GC carry with the agreed package treatment rather than adding the subcontractor's inclusion on top of it. This proposed handoff method catches both an omitted carry and a duplicated carry without changing the measured base quantity or pretending Piper decides contractual responsibility.

Accessibility scope also needs its actual governing basis. The [Access Board's ADA curb-ramp guide](https://www.access-board.gov/ada/guides/chapter-4-ramps-and-curb-ramps/) distinguishes detectable-warning requirements at DOT-covered transit facilities from non-transit facilities under DOJ's standards. Do not assume one warning-surface rule applies to every private site, and do not omit warning surfaces that the project documents require.

The final decision remains with the precon team: accept the reviewed quantities, correct their classification, seek clarification, or carry a stated assumption. Piper provides editable measurements and project-connected scope workflows. The defensible package is the one whose quantity, detail and responsibility can be inspected together.

### Can I mix manual, assisted and agentic site-concrete measurements in Piper?

Yes. Piper supports the three workflows in one editable takeoff file. Use manual geometry for judgment-heavy exceptions, assistance for suitable repeated linework or symbols, and an agentic task for a defined measurement set. Review all three against the selected source sheets and scale before using the quantities.

### Does boundary assistance automatically measure an outdoor sidewalk?

No. Piper documents boundary assistance as proposing room boundaries, and open boundaries can affect results. For an outdoor sidewalk, inspect any proposed area against the actual concrete edges and thickness zones. Where the geometry is not suitable, draw the area manually rather than relying on an unverified boundary.

### Can I change a curb measurement created by the agent?

Yes. You can correct a returned curb path or remove a duplicate. For example, a run that follows an unwanted parallel edge needs a geometry correction, while a correctly drawn run assigned to the wrong curb type needs its item assignment corrected. Check both against the source plan and detail.

### Should every curb ramp automatically receive one warning-panel count?

No. Track the documented warning-surface locations and dimensions separately from ramp counts. The governing accessibility requirements and project details determine the surface required, while the selected panel arrangement determines procurement quantities. A ramp count is useful for reconciliation but does not establish panel size or the number of pieces.