# Alfred E. Smith Recreation Center: carry the window and cooling interfaces together

At Alfred E. Smith Recreation Center, the opening cannot be priced independently of the cooling unit it currently contains. Ask who removes the existing unit, closes and restores the opening, supplies the new cooling system and makes its electrical and controls connections.

The [May 2026 DCAS energy record ACEDPR223](https://data.cityofnewyork.us/resource/fb86-vt7u.json?$where=reporting_period%3D%27202605%27%20AND%20managing_agency%3D%27DCAS%27%20AND%20fms_id%3D%27ACEDPR223%27) describes replacing old, leaking single-pane windows containing window units with high-efficiency windows and efficient cooling systems. The May 28 agency data lists design. It is a capital narrative, not an issued contract or evidence of measured savings.

## Treat related records as separate until reconciled

[Parks window record 10777](https://data.cityofnewyork.us/resource/4hcv-tc5r.json?$where=trackerid%3D%2710777%27) and [broader proposed reconstruction record 11431](https://data.cityofnewyork.us/resource/4hcv-tc5r.json?$where=trackerid%3D%2711431%27) should be checked against the DCAS project by location, scope, agency and controlling documents. Their existence does not establish one issued contract or authorize adding each record's work to a single price. Obtain current boundaries and schedules before determining overlap.

## Follow an opening through the handoff

This estimator matrix is illustrative, not an issued work breakdown.

| Step | Boundary question | Evidence needed |
| --- | --- | --- |
| Existing unit | Who disconnects, removes and disposes of it? | Survey and demolition documents |
| Window replacement | Who measures, installs and seals each opening? | Window schedule and envelope details |
| New cooling | What equipment replaces the existing unit and where does it go? | Mechanical design and equipment schedule |
| Electrical and controls | Who supplies circuits, terminations and programming? | Electrical plans and control sequence |
| Interior restoration | Who repairs finishes and maintains temporary protection? | Finish details and phasing requirements |

If a new cooling strategy changes an opening, the window vendor needs a coordinated detail before fabrication. If the unit remains in service until cutover, temporary weather protection and occupant access also need an assigned owner. Those are questions to resolve, not facts established by the agency record.

## Document the cooling transition

For a preliminary price, record the assumed shutdown and replacement sequence, identify openings whose equipment is still unknown, and separate a temporary cooling allowance from permanent work. Replace those assumptions with issued equipment, envelope and electrical details before leveling bids. Do not present projected energy savings or comfort improvement as measured results.

For the broader package review, use the [MEP coordination review](https://piper-ai.com/resources/mep-coordination-preconstruction-scope) and the [trade scope generation](https://piper-ai.com/resources/construction-scope-generation-guide).