---
title: 'Astoria Boulevard HWQ1201: price three locations without inventing a sewer replacement'
url: 'https://piper-ai.com/resources/astoria-boulevard-hwq1201-three-location-utility-scope'
description: 'HWQ1201 joins three distinct street areas with local utility adjustments. Separate the 2026 sewer expectation from the final contract scope.'
contentTypes: [guide]
publishedAt: '2026-11-24T05:02:11.621Z'
author: 'Ido Gedanken, CEO'
readingTime: 3
---

# Astoria Boulevard HWQ1201: price three locations without inventing a sewer replacement

For HWQ1201, a single project title should not become a single undifferentiated street-work allowance. The January 2026 DDC and DOT presentation describes three locations, surface and access changes, and local utility work. It anticipated connections from new catch basins to existing storm sewers, with no major storm sewer pipe reconstruction anticipated. That is a dated design expectation, not a contractual exclusion.

The estimating decision is to keep a location-specific register and reconcile it with the final plans. Do not allocate every wall, hydrant or basin to a particular location from the general scope slide, and do not turn an absence of anticipated major sewer reconstruction into an assumption that no drainage or utility work exists.

## Three limits, one stated program

The [January 2026 community presentation](https://www.nyc.gov/assets/ddc/downloads/presentations/HWQ1201%20-%20Community%20Board%20Presentation_2026.01.12.pdf) defines the locations as:

- **A:** Astoria Boulevard from 80th to 84th Street, and 24th Avenue from 81st to 84th Street.
- **B:** Astoria Boulevard from 88th to 90th Street, and 25th Avenue from 88th to 90th Street.
- **C:** Astoria Boulevard from 102nd Street to Humphreys Street.

The scope list includes curb, ramp and median extensions, bus bulbs, retaining walls, turn bays, crossings and bike routes. It also describes hydrant relocations as needed, resetting manholes and grates, and installing catch basins connected to the existing storm sewer. These are project-level descriptions, not verified quantities or a location-by-location takeoff.

## Keep surface geometry and local utilities together

A curb line, for example, is not just a concrete quantity if the issued drawings also require a hydrant relocation or drainage adjustment. A basin connection is still work even if a major storm sewer replacement is not anticipated. The estimate needs the actual connection details and division of responsibility before a bidder can be evaluated against that expectation.

The presentation also discusses staging to minimize effects on drivers and pedestrians and coordination with commercial properties. Its schedule was a forecast in January 2026, not evidence of current construction progress. For a live pursuit, [price the maintained-access plan](https://piper-ai.com/resources/construction-logistics-plan-estimate-review) against the issued staging and access requirements, rather than using a general per-location allowance without a basis.

## Location-by-interface carry register

Keep separate records for A, B and C using the official limits above. Apply this single interface register to each record; the public scope list does not establish which item occurs at which location. Mark an issued requirement, a verified absence or an unresolved allocation rather than copying a quantity to all three.

| Interface | Location record to complete | Evidence before carry |
| --- | --- | --- |
| Curb, bus and wall geometry | Applicable location and exact work limits | Issued plan, section and measured quantity |
| Local utility adjustments | Each hydrant, manhole or grate affected within that location | Existing and proposed utilities, reset or relocation details and responsible party |
| Drainage connections | Each basin and its connection to the retained system | Connection detail, excavation/restoration limits and verified scope split |
| Maintained access | Bus, pedestrian and business route for the relevant stage | Issued staging plan, agency conditions and temporary-work inclusions |
| Surface handover | What the utility package leaves for the roadway package | Acceptance, temporary reinstatement and final surface responsibilities |

For each confirmed item, attach its sheet and revision, quantity basis, trade owner and any related temporary work. If the final drainage detail changes the connection to the existing system, update the carry and bidder instructions together. A utility reset should not disappear inside a roadway unit price unless the proposal explicitly includes it.

## Recheck the controlling package

The presentation identifies the project and its 2026 design expectations. It does not establish an open tender, final issued scope or present schedule. Before using the case to price a live project, obtain the current drawings, specifications, addenda and traffic or access requirements. Resolve the wall, hydrant, basin and surface interfaces separately for each location, including who will maintain the required routes during the work.
