---
title: 'Austin EV readiness: separate future capacity from installed chargers'
url: 'https://piper-ai.com/resources/austin-commercial-ev-readiness-scope'
description: 'Separate Austin EV-capable infrastructure, ready circuits and chargers, including EMS, garage and utility assumptions, before leveling electrical bids.'
contentTypes: [guide]
publishedAt: '2026-11-24T09:02:23.668Z'
author: 'Ido Gedanken, CEO'
readingTime: 2
---

# Austin EV readiness: separate future capacity from installed chargers

For an Austin commercial parking bid, ask the designer for the applicable EV readiness calculation and separate future capacity, ready circuits and installed charging equipment in the bid form. A quote that says “EV included” can conceal very different work in the garage, service and site packages.

The [Austin commercial EV readiness guide](https://austinenergy.com/-/media/Project/Websites/AustinEnergy/Energy-Efficiency/PDFs/AEGB25_3734_COM_EV_Readiness.pdf?hash=EF97EDBE88A8A6BC0F0CAC28AA963282&rev=54a334f01b614d31be5ed91b9b7d5897&sc_lang=en) distinguishes EV-capable, EV-ready and installed EV supply equipment (EVSE). Austin's local amendments remove the blanket installed-EVSE requirement under the percentage method. The guide identifies an exemption for commercial non-R2 projects with fewer than ten parking spaces. Confirm occupancy, code basis, eligible garage levels and the approved method before applying any quantities.

The [City’s technical-code table](https://www.austintexas.gov/development-services/building-technical-codes) lists the 2026 NEC as effective September 1, 2026. Confirm the electrical code and transition basis for the actual filing alongside the energy-code calculation.

## Make the calculation a bid input

Obtain the designer's marked parking count, occupancy, method, required categories and assumptions about energy management systems (EMS). The guide describes 3.3 kVA and 25 A per space with EMS versus 7.2 kVA and 50 A without it for its stated calculation. Those values are not a design instruction or a substitute for utility and engineer sizing. The guide also distinguishes building distribution from utility-equipment sizing and describes a garage conduit exception. Ask the designer which provisions apply.

**Illustrative example:** A commercial garage has 100 parking spaces. The designer has not yet confirmed the eligible levels, method or required counts. Do not infer that all 100 spaces require chargers or multiply a generic national percentage by the total. Carry a documented allowance or qualification pending the designer's actual calculation, and ask bidders to price the same assumptions.

## Map the interfaces before bid leveling

This proposed register assigns questions, not code determinations:

| Interface | Electrical scope to confirm | Other owner and decision |
| --- | --- | --- |
| Future capable spaces | Distribution capacity, raceway and termination basis | Designer confirms category and garage exception |
| Ready spaces | Circuits, outlets or connection details shown | Civil and concrete coordinate routing and restoration |
| Installed EVSE | Equipment, controls, connections and commissioning | Owner selects equipment and network responsibility |
| Service and EMS | Capacity, controls and operating assumptions | Utility and engineer confirm service and sizing |
| Garage safety and access | Disconnects, clearances and applicable ventilation | Fire and accessibility designers confirm requirements |

Austin's guide identifies fire-code, accessibility and disconnect or ventilation coordination as relevant interfaces. Request drawings and specifications identifying the boundary between civil trenching, electrical conduit, utility work and any charger vendor. State whether bollards, markings, payment systems and testing are included. A charger alternate should identify which base infrastructure remains.

Carry the approved calculation and each bidder's exclusions into the scope letter. If the EMS assumption or parking count changes, revisit distribution, controls and civil work together rather than adjusting only the equipment line.

For the broader method, see [the electrical-bid exclusions review](https://piper-ai.com/resources/common-electrical-bid-exclusions-gcs-should-review).
