# Austin construction recycling: price the diversion route and reporting evidence

For an affected Austin project, choose a diversion route before buying demolition and hauling. The apparent cheapest haul price may omit sorting, processing or the records needed at final inspection. Ask bidders to price the same destination and documentation responsibilities, then carry the selected method into the subcontract.

Austin's [construction and demolition recycling program](https://www.austintexas.gov/resource-recovery/programs/construction-and-demolition-recycling-ordinance) applies to building permits exceeding 5,000 square feet of new, added or remodeled floor area and commercial or multifamily demolitions of any size. The GC must either divert at least 50% of debris from landfill or landfill less than 2.5 pounds per square foot, and report the quantities. Check the permit scope and current City instructions for the particular project; the two routes are alternatives, not cumulative thresholds.

## Compare the routes before letting the package

Obtain a debris forecast by material and identify opportunities to reuse, source-separate or send mixed loads to a processor. Get written quotations for containers, pulls, sorting, contamination, disposal and reporting. A processor's diversion assumption needs a project-specific evidence path; a promise to recycle does not itself establish the actual quantity. The lower disposal-intensity route also needs a reliable floor-area denominator and all landfill quantities.

**Illustrative calculation:** A 10,000-square-foot project generates 40,000 pounds of debris. Tickets show 24,000 pounds diverted and 16,000 pounds landfilled. The diversion share is 24,000 / 40,000 = 60%; landfill intensity is 16,000 / 10,000 = 1.6 pounds per square foot. Both illustrative tests pass, but actual eligibility, counting and records must follow City instructions. If a 10,000-pound load lacks a destination record, neither percentage should be represented as verified until reconciled.

## Assign the ticket trail

This proposed register makes the handoff explicit. Populate actual firms and dates before award.

| Activity | Proposed owner | Evidence and decision |
| --- | --- | --- |
| Separate debris at site | Demolition subcontractor | Container labels, contamination and labor included |
| Move loads | Hauler | Dated load ticket identifying project and destination |
| Process and classify | Processor or receiving facility | Weights and reused, recycled and landfilled quantities |
| Reconcile and submit | GC | Ticket log, missing-load follow-up and recycling report |

Agree how the team will capture material reused directly, rejected loads and multiple facilities. Match each haul to a ticket and weigh records; do not double count transfers between facilities. Assign the superintendent to check the log while work is underway rather than reconstruct it at closeout.

## Protect the final inspection handoff

Austin says the required recycling report accompanies the request for final inspection. Give one person responsibility for collecting each trade's records and reconciling totals before that request. Coordinate container space and movement with the [demolition permit sequence](https://piper-ai.com/resources/austin-commercial-demolition-permit-gates); neither a demolition permit nor a hauling quote replaces the report.

For the broader method, see [the general conditions and general requirements review](https://piper-ai.com/resources/general-conditions-vs-general-requirements-construction).