# Austin MBE/WBE bid compliance: protect the ten-business-day outreach window

Start certified-firm outreach before the final week of an Austin City bid. The estimator needs enough time to define useful scopes, notify firms, reconcile responses with the base bid and assemble the compliance plan. A participation percentage calculated on bid day cannot recreate missing outreach evidence.

Austin's [MBE/WBE rules effective December 14, 2023](https://services.austintexas.gov/edims/document.cfm?id=420586) require notification at least ten business days before response submission under Section 9.2.2. The rules treat late or incomplete compliance plans as nonresponsive and use the base bid for base-plus-alternate bids. Confirm the current solicitation, applicable program, project goals and deadline; an airport or federal DBE procurement may use different documents and requirements. The City publishes [separate program forms](https://www.austintexas.gov/small-minority-business/documents-smbr).

## Work backward from the actual deadline

The following is a proposed calendar. Count business days using the governing solicitation and City instructions, including any holiday treatment. Do not treat these relative milestones as a substitute for the ten-business-day rule.

| Milestone | Proposed action | Record |
| --- | --- | --- |
| Before the notice deadline | Divide work into commercially useful scopes and verify certified firms | Scope list, directory search and certification match |
| At least 10 business days before submission | Notify eligible firms with useful bid information | Dated notices, recipients, scope and delivery evidence |
| After notice | Follow up, answer questions and capture responses | Contact log, quotes and assistance offered |
| Before submission | Reconcile commitments and good-faith evidence with base bid | Signed or required forms and bid math |
| At submission | Submit complete plan in required format | Copy and submission confirmation |

If an addendum changes scope or the deadline, reassess notice and outreach rather than assuming the earlier package is still adequate. City first-contact arrangements do not eliminate the respondent's remaining good-faith obligations under the rules.

## Build a commitment log that can survive buyout

For each scope, record the firm, current City certification and the certified work category, the notice date and response, quote and exclusions, proposed commitment amount and base-bid denominator. Identify the document proving the commitment and the person resolving differences between the bid and compliance plan. Certification must match the actual work, not merely the firm's name.

**Illustrative example:** A base bid is $1 million and a certified subcontractor's proposed eligible work is $100,000. The simple arithmetic is 10% of that base bid. This does not establish eligibility, responsiveness or achievement of any project goal; verify the firm's certification, eligible scope and actual calculation rules.

Keep the submitted plan and outreach evidence with the award record. After award, [review proposed substitutions and change orders](https://piper-ai.com/resources/austin-mbe-wbe-substitution-change-orders) before changing commitments.

For the broader method, see [the bid-solicitation guide](https://piper-ai.com/resources/construction-bid-solicitation-guide).