# Austin MBE/WBE substitutions: review the compliance-plan change before re-award

Before replacing a committed firm or moving its work, reconcile the proposed commercial change with the approved Austin MBE/WBE compliance plan. A scope letter or change directive can explain the work, but it does not by itself provide the separate City approval required for a plan change.

Section 11 of the [Austin MBE/WBE program rules](https://services.austintexas.gov/edims/document.cfm?id=420586) requires written prior approval for substitutions, additions and deletions to a compliance plan. The rules also address updated plans and goal calculations for scope-changing change orders. Read the issued contract and current City instructions before acting; the [City forms directory](https://www.austintexas.gov/small-minority-business/documents-smbr) includes change-request and reporting documents.

## Reconstruct the original commitment

Pull the approved plan, original certified scope, subcontract value, subsequent approved changes and payment reports. Separate a proposed adjustment within an existing authorized scope from a substitution or other plan change. Ask the City when classification is unclear. A cheaper replacement quote does not establish approval or erase a prior commitment.

Use this proposed change-control record for each affected scope:

| Field | Information to preserve | Responsible reviewer |
| --- | --- | --- |
| Baseline | Approved firm, certified scope, commitment and prior revisions | Compliance lead |
| Proposed change | Work deleted, added or moved, value and proposed firm | Project manager and estimator |
| Reason and evidence | Relevant correspondence, availability and alternatives | Procurement and compliance lead |
| Participation effect | Revised contract basis and goal calculation | Compliance lead |
| Authority | Request, City response and written approval date | Contract administrator |
| Execution and reporting | Revised subcontract, payments and closeout records | Project manager and accounting |

## Connect price, scope and authorization

**Illustrative example:** A committed certified electrical subcontractor was to provide raceway and terminations. A revised design moves raceway to a site package. The estimator should show the deleted electrical scope, added site scope and affected value, then have the compliance lead determine the plan and goal implications. Submit the required change request and obtain written approval before implementing a covered plan change. A separate contract change may also be necessary under the project agreement.

If the work must proceed urgently, escalate the schedule and approval question rather than treating urgency as automatic authorization. Track pending approval separately from an executed subcontract change, so the estimate does not assume an unapproved replacement has been awarded.

## Carry payment evidence through closeout

After approval, update the commitment register and communicate the approved scope to purchasing and field staff. Reconcile subcontract payments to the revised plan and preserve the City's approval with the change order. The rules continue subcontract-payment reporting after award; a final buyout spreadsheet alone cannot establish what was actually paid.