# Austin WUI construction: verify the zone before pricing the envelope

Check the property's wildland-urban interface (WUI) determination and project history before pricing the envelope. A map result is the beginning of the review: proximity, field conditions, application date and prior site-plan approval can affect which building and site measures the designer identifies.

[Austin Fire's WUI guidance](https://www.austintexas.gov/fire/wildland-urban-interface-code) says applications on or after July 10, 2025 use the locally amended 2024 International Wildland-Urban Interface Code. It describes zones A, B and C and field measurement following the map for A and B. Zone A is 50 feet or less from wildland; B is over 50 through 150 feet; C depends on wildland size and distance. Confirm the actual parcel, project and applicable transition treatment with the responsible designer and City. Do not assume every Austin property is in the WUI.

## Connect the map to a field and design record

Use the City map and applicable field checks to prepare a proposed register. The designer and authority determine the requirements; the estimator assigns their consequences to packages.

| Input | Evidence to obtain | Bid consequence to review |
| --- | --- | --- |
| Application and approval history | Filing dates and approved site-plan record | Confirm building and site transition treatment separately |
| Map and field measurement | Parcel, wildland area and measured proximity | Establish zone and unresolved boundary questions |
| Roof and envelope | Issued assemblies and product requirements | Assign roof, wall, openings and penetrations |
| Vents and ember exposure | Details and specified products | Coordinate roofing, mechanical and exterior trades |
| Site and access | Approved access, water and ember-ignition-zone requirements | Assign clearing, civil, landscape and water work |
| Product approval | Submittals and acceptance criteria | Carry procurement lead and substitution responsibility |

Existing approved site plans have specific transition treatment in the City guidance. An older approval does not automatically mean every site-related update is required, and it does not automatically settle the building requirements for a later application. Preserve the approval date and ask the design team to document each determination.

## Price the assembly, not just the material

**Illustrative example:** A site initially appears close to wildland on the map. Field measurement and designer review are pending when envelope bids are due. Ask roofers, exterior-wall and mechanical bidders to identify their assumed assemblies and vent details; obtain a separate price for a designer-defined alternative if available. Do not label a guessed assembly code-compliant. Include site access and vegetation questions in the civil and landscape packages rather than hiding them in roofing.

Before award, reconcile product submittals with the approved details and identify who supplies supporting evidence. If the zone or application basis changes, reopen affected envelope and site scope together.

For the broader method, see [the code-to-scope review](https://piper-ai.com/resources/construction-code-requirements-scope-review).