---
title: 'BE-Ex Geothermal Showcase 2026: questions before a Manhattan study becomes an installation allowance'
url: 'https://piper-ai.com/resources/be-ex-geothermal-showcase-2026-manhattan-feasibility-allowance'
description: 'Separate geothermal study, enabling work and installation scope before a Manhattan preconstruction allowance becomes a commitment.'
contentTypes: [guide]
publishedAt: '2026-11-23T15:06:36.473Z'
author: 'Ido Gedanken, CEO'
readingTime: 3
---

# BE-Ex Geothermal Showcase 2026: questions before a Manhattan study becomes an installation allowance

Before a Manhattan multifamily GC carries a geothermal installation, establish whether the owner is buying a study and testing, early enabling work, or a designed installation. Those are different packages with different evidence and risk. A feasibility allowance can fund an investigation without proving that a particular ground system is technically suitable, eligible for a program or ready to build.

[BE-Ex advertises a Geothermal Showcase](https://be-exchange.org/upcoming_event/geothermal-showcase/) for December 9, 2026, from 9:30 to 11 a.m., at Building Energy Exchange and online; doors open at 9 a.m. The planned program includes Con Edison geothermal program and funding discussion and an Alafia project presentation, with some participants still to be announced. [Alafia is in Brooklyn](https://hcr.ny.gov/news/governor-hochul-announces-completion-576-unit-affordable-housing-development-brooklyn), so its example is not a site design for a Manhattan property. Check the event listing and agenda before relying on them.

## Choose the package being priced

A **study or test phase** should state the investigation, deliverables, access assumptions and who interprets the results. An **enabling package** needs a defined scope and a reason it remains useful under the options being considered. An **installation package** needs an accepted design basis, trade boundaries and an agreed treatment of unresolved conditions. The estimator should label a provisional sum for an unknown installation as an allowance with explicit assumptions, not as a complete contractor commitment.

[Con Edison's geothermal information](https://www.coned.com/en/save-money/rebates-incentives-tax-credits/commercial-and-multifamily-geothermal) describes subsurface thermal conductivity testing before final design and installation of a large system. Ask the responsible designer what testing is appropriate to the proposed project and what decisions it will support. A program description does not establish that this building qualifies for funding.

## Work a hypothetical study-to-package handoff

Assume an occupied Manhattan apartment building is considering ground-source heating and cooling. The owner has requested a preliminary allowance but has not issued a final design. This register is a set of questions to the responsible parties, not a design or permit checklist.

| Handoff item | Evidence or decision requested | Party to resolve before firm scope |
| --- | --- | --- |
| Site and ground | Available site records, utilities, ground information, access and proposed investigation | Owner supplies records; designer defines investigation |
| Testing and design basis | Completed tests, interpretation, loads and selected design basis | Designer confirms adequacy and outstanding work |
| Building connections | Heating, cooling and domestic hot water boundaries, distribution and controls | Mechanical designer defines interfaces; trades price assigned work |
| Occupied operation | Access, shutdown windows, protection and temporary service assumptions | Owner sets operating constraints; design and GC plan the work |
| Program and utility | Eligibility process, account and application status, utility interfaces | Owner and utility or program partner confirm in writing |
| Scope and acceptance | Issued drawings, trade boundaries, testing and handover deliverables | Designer issues basis; owner approves procurement and GC levels quotes |

For each line, record the source and revision, a named owner, the date needed, and what the estimate currently carries. If ground access is unconfirmed, distinguish the price of the proposed investigation from any assumed installation price. If domestic hot water is excluded from the study, do not quietly include a building-wide conversion in the construction allowance.

## Separate program discussion from construction authorization

At the showcase, ask what information a program review needs, when eligibility is determined and whom the owner should contact. Ask the designer what investigation must precede a project-specific design and which conditions could change the selected approach. Ask the contractor bidders what their study or installation price includes, what is by others and which findings trigger a change.

No presentation or general program page substitutes for written eligibility confirmation, a design decision or an awarded scope. Carry the building-side responsibilities into the [MEP coordination review](https://piper-ai.com/resources/mep-coordination-preconstruction-scope), and [separate compliance aims from construction scope](https://piper-ai.com/resources/nyc-local-law-97-retrofit-construction-scope) before treating the allowance as an approved package.
