---
title: 'Beaver Creek Clean River: separate tunnel, screening and treatment scope'
url: 'https://piper-ai.com/resources/beaver-creek-clean-river-treatment-interface-case'
description: 'Trace Beaver Creek flows, treatment and the garden handoff without confusing the separate Phase 6 storage project.'
contentTypes: [guide]
publishedAt: '2026-11-18T08:03:09.009Z'
updatedAt: '2026-11-18T08:03:09.026Z'
author: 'Ido Gedanken, CEO'
readingTime: 2
---

# Beaver Creek Clean River: separate tunnel, screening and treatment scope

For an estimator reviewing a Beaver Creek Clean River package, the first distinction is the direction and purpose of each connection. The diversion tunnel brings flow to satellite treatment; the Third Avenue route carries screenings toward the South Plant. Treating both as a single tunnel allowance obscures different tie-ins and acceptance responsibilities.

This is a historical interface case, not a current procurement notice. The [Albany Water capital plan](https://www.albanyny.gov/DocumentCenter/View/14038/Albany-Capital-Improvement-Program---CIP---Five-Year-2026-2030-PDF), printed sections 3-4 through 3-7 (physical PDF pages 58–61), reports that the disinfection and floatables facility was operational on September 26, 2024. It describes the tunnel and South Plant improvements as completed. The plan separately projected the Lincoln Park Learning Garden for completion in 2026; that forecast does not establish completion.

## Trace the treatment route before assigning the packages

The plan identifies a diversion tunnel from upstream at Delaware Avenue to the satellite facility. The Third Avenue Tunnel carries screenings from the facility toward Third Avenue, and the Third Avenue improvements connect to the county interceptor carrying screenings to the South Plant. South Plant work includes screening upgrades and a throttling gate. The plan calls the satellite facility Clean River Phase 5. An older, distinct Beaver Creek Phase 6 converted prior combined-sewage detention to separated stormwater storage. Matching phase numbers without the project name can bring an unrelated scope into the estimate.

## Reconcile the interfaces, not just the phase labels

The table is estimating analysis, not a statement of current contract boundaries. Assign responsibility only after reading the issued package and accepted records.

| Interface | Evidence to reconcile | Estimate decision |
| --- | --- | --- |
| Diversion tunnel to satellite facility | Tie-in locations and approved facility connection details | Who carries the boundary work and any interruption constraints? |
| Facility screenings to Third Avenue and interceptor | Conveyance route, termination details and as-built revisions | Does a facility or conveyance price include each transition and handoff? |
| South Plant screening and gate | Equipment boundaries, controls and acceptance records | Which package owns installation, integration and demonstration at the plant? |
| Facility to Learning Garden | Site limits, access and handover conditions | Is restoration or garden work in this package, a separate phase or excluded? |
| Older storage Phase 6 | Project title, limits and record drawings | Remove unrelated storage work unless the current documents specifically bring it in. |

For example, if a tunnel quote stops at the facility wall while the treatment quote starts at installed equipment, mark the intervening penetration and connection as unassigned until the documents or a clarification resolve it. That is a review scenario, not a finding about the original contracts. Likewise, operational treatment does not by itself establish that a public garden was turned over.

## Request the records that fix the estimate boundary

Obtain the issued drawings and addenda for the actual package, a marked interface schedule, relevant record drawings, and acceptance or turnover records for affected existing work. Ask the owner to identify the governing revision where the process schematic and civil plan differ. List any unresolved shutdown, testing and site-restoration assumptions as qualifications rather than silently carrying them in two trades.

Use the [project-stage guide](https://piper-ai.com/resources/albany-public-project-stage-preconstruction-guide) to distinguish archived evidence from an issued opportunity, then [review bid scope and responsibility gaps](https://piper-ai.com/resources/construction-bid-coverage-guide) against the package actually received.
