title: 'Bisnow New York Construction, Development & Design 2026: a precon guide to the Dec. 3 morning'
url: 'https://piper-ai.com/resources/bisnow-new-york-construction-development-design-2026-guide'
description: 'Bisnow''s Dec. 3, 2026 New York construction event is an owner and developer room. What the panels cover, what it costs and how GC precon should use it.'
contentTypes: [guide]
publishedAt: '2026-11-23T12:00:00.000Z'
author: 'Ido Gedanken, CEO'
readingTime: 6
---

# Bisnow New York Construction, Development & Design 2026: a precon guide to the Dec. 3 morning

1. The event: Thursday, Dec. 3, 2026, 8:00 AM to 12:30 PM, Marriott Marquis, 1535 Broadway, New York
2. Tickets were $209, or $189 through Nov. 30, on the Bisnow event page when checked Nov. 23
3. The panels are mostly owners, developers, architects and attorneys talking about budgets, conversions and timelines
4. A precon team gets the most from it by listening for how owners set contingency and schedule before the GC is in the room

**Bisnow's New York Construction, Development & Design event runs on Thursday, Dec. 3, 2026, from 8:00 AM to 12:30 PM at the Marriott Marquis in Times Square.** It is a half-day panel program, and the people on stage are mostly owners, developers, architects and lawyers. For a general contractor's estimator or preconstruction manager, that is the reason to go: it is a morning of hearing how the people who write the budget think about cost, schedule and risk before a GC is asked to price anything.

It is not an estimating workshop. Nobody will teach you to level bids or build a GMP. If that is what you need, skip it. If you price New York work for developers and want to understand the assumptions they bring to a pre-development conversation, it is one of the cheaper mornings you can spend on that.

All event facts below come from the [Bisnow event page](https://www.bisnow.com/events/new-york/construction-development/new-york-construction-development-10168), checked on Nov. 23, 2026. Confirm anything time-sensitive there before you book.

## Logistics at a glance

| Item | Detail |
| --- | --- |
| Date | Thursday, Dec. 3, 2026 |
| Time | 8:00 AM breakfast and networking; panels 9:00 AM to 12:15 PM; networking to 12:30 PM |
| Venue | Marriott Marquis, 1535 Broadway, New York, NY 10036 |
| Room | 3rd floor ballrooms, Actors 1 and 2 plus Playwright |
| Tickets | $209 (listed as "Going Fast"); $189 Black Friday price through Nov. 30, 2026 |
| Format | Four moderated panels plus opening remarks |

Tickets are priced in tiers that rise as each sells out, so the price you see may be different from the one above.

## What is on the agenda, and what matters to precon

The program opens with remarks from Greg Shunick of G3 Architecture Interiors Planning, then runs four 45-minute panels.

### 9:00 AM: mapping costs and timelines in pre-development

"Pre-Development Strategies to Effectively Map out Costs & Project Timelines" is the session most directly about precon. Bisnow's description centers on cost forecasting and timeline risk. The panel includes John Mazzeo, VP of Preconstruction and Partner at The VOREA Group; Mayra Maisch, Head of U.S. Design & Construction at BGO; Louis Martinelli, Head of Freedom Source at Suffolk; Andreas Rotenberg of Pulley; and Chris Smith of The Baldwin Group. Brendan Schmitt of Herrick moderates.

The useful question to carry into this one: at what point in pre-development does the owner fix a number, and what contingency sits behind it? Owners who set a hard budget on schematic design and treat the GC's early estimate as confirmation, not discovery, create the gap that later shows up as a "bust." Hearing how owners in this room build that number tells you what you will be measured against. Our guide to [contingency and allowances in estimate review](https://piper-ai.com/resources/construction-contingency-allowances-estimate-review) covers how to keep those carries visible instead of buried.

### 9:45 AM: upgrades, capital improvements and conversions

The second panel covers retrofit, capital improvement and conversion work on existing buildings, with owners from Empire State Realty Trust and Rudin, Nucor Construction Corp's president, and design and engineering principals. Bisnow frames it around ROI and minimizing tenant disruption.

For precon, this is where scope risk lives. Existing-conditions work prices badly from drawings alone, and conversion scopes often cross trade boundaries that new construction never tests. If your firm bids occupied renovations, listen for how owners expect phasing and existing-conditions risk to be allocated. Our [tenant improvement scope review](https://piper-ai.com/resources/tenant-improvement-preconstruction-scope-review) and [Local Law 97 retrofit scope](https://piper-ai.com/resources/nyc-local-law-97-retrofit-construction-scope) guides go deeper on those boundaries.

### 10:45 AM: design, technology, materials and sustainability

The third panel, with Related Companies, Avdoo, Corcon, HLB Lighting Design and Tom Winter Architects, covers design trends, materials and sustainability, and Bisnow says it will address how technology and AI affect timelines and construction costs. Treat claims about cost reduction as positions to test, not findings. Ask any panelist who makes one which scope or which phase moved.

### 11:30 AM: macro factors and ground-up profitability

The closing panel, with L+M Development, Cord Meyer Development, BRP Companies and Lessard Design, covers interest rates, labor, material costs and financing. This is the market-outlook hour: useful context for escalation assumptions on work that will bid in 2027.

## Who attends

Bisnow's "Who's Attending" list on the event page is dominated by owners, developers and investors (AvalonBay Communities, Brookfield Properties, Related Companies, RXR, Silverstein Properties, Rudin and others), plus architects, NYCEDC and a smaller group of contractors including Suffolk, Shawmut Design and Construction, Rinaldi Group and Nucor Construction Corp.

That mix decides who from a GC should go. A chief estimator or precon director who already talks to developers will get more from it than a junior estimator, because the value is in conversations over coffee about upcoming work and how owners want early estimates delivered. A business development lead and a precon lead attending together is a reasonable pairing.

## What a precon team can take away

Three things are realistically on offer in a four-hour morning:

1. **Owner assumptions about early numbers.** How developers in this room set budgets, when they lock them and how much contingency they hold. Compare that with how your team presents a conceptual estimate.
2. **Conversion and retrofit risk allocation.** Which existing-conditions risks owners expect the GC to carry, which they keep, and how they phase occupied work.
3. **A market read for 2027 escalation.** The event page lists figures its speakers will work through, attributed to sources such as the New York Building Congress. Use them as context and go to the original sources before you put any of them in an estimate.

What you will not get: hands-on estimating method, CE credits (none are listed on the event page), or vendor product demos.

## Practical tips

- **Arrive at 8:00.** The breakfast hour is the main networking window. The last 15 minutes are networking too, but people leave fast.
- **Pick one question per panel.** For the pre-development panel: "When does your budget become fixed, and what drawings is it based on?" For the conversion panel: "Who carries unforeseen existing conditions on your current jobs?"
- **The event is cashless.** Bisnow's page says payment is by credit card only.
- **Registration questions** go to Bisnow at eventregistration@bisnow.com or 202-684-2034, per the event page.
- **Write down what owners say they want from an early estimate**, then check it against your last three conceptual estimates for those clients. That is the follow-through that makes the morning worth it.

## Where Piper fits after the conversation

Owners describing how they set budgets at schematic design are describing a real estimating problem: the scope behind an early number is incomplete, and what the GC assumed is easy to lose by the time drawings mature. That is where a precon system earns its place, not on the panel floor.

Piper is an AI operating system for preconstruction that keeps one evolving understanding of a project and applies it across workflows. On early-stage work it can [generate trade scopes](https://piper-ai.com/use-cases/scope-generation) from the documents available, so assumptions about incomplete design are written down rather than remembered, and run [surveys](https://piper-ai.com/use-cases/survey) that answer the company's own questions across the project documents. Later, it supports [bid leveling](https://piper-ai.com/use-cases/bid-leveling) against the intended scope and a [final bid review](https://piper-ai.com/use-cases/final-bid-review) before the number goes out. It also does [quantity takeoff](https://piper-ai.com/use-cases/takeoff) on drawings, and can help draft a [schedule](https://piper-ai.com/use-cases/scheduling) from the project documents. The estimator stays responsible for the number. If you want to see it on one of your own packages, the demo request is at the bottom of this page.

### When and where is Bisnow's New York Construction, Development & Design event in 2026?

Thursday, Dec. 3, 2026, 8:00 AM to 12:30 PM, at the Marriott Marquis, 1535 Broadway, New York, in the 3rd floor ballrooms, according to Bisnow's event page.

### How much does a ticket cost?

When checked on Nov. 23, 2026, the event page listed $209 per ticket and a $189 Black Friday price available through Nov. 30, 2026. Prices are tiered and rise as tiers sell out.

### Is it worth it for a GC estimator?

It is an owner and developer program, not an estimating workshop. It is most useful for precon leaders who price work for New York developers and want to hear how owners set early budgets, contingency and conversion risk.

### Does the event offer continuing education credits?

The Bisnow event page does not list any CE credits.