# Boston surface cleaning bids: connect APCC approval, lead evidence and discharge scope

A Boston facade-cleaning bid should identify the proposed method and the approval evidence it requires before the GC compares prices. The [Air Pollution Control Commission application](https://www.boston.gov/sites/default/files/file/2026/06/Abrasive%20Blasting%20Permit%20Application_0.pdf) asks for the method and materials, site encapsulation and effluent treatment. For removal of any paint it requests a certified-laboratory lead-level report; removal of lead paint must be performed by a licensed professional.

## Match each quote to the application

| Scope item | Evidence owner | Bid consequence |
| --- | --- | --- |
| Method and materials | Cleaning contractor's method and safety data sheets | Compare like methods and included preparation |
| Paint and lead | Owner and qualified professional arrange required report | Do not diagnose lead content from drawings |
| Containment and effluent | Contractor's proposed encapsulation and treatment plan | Assign setup, maintenance and removal |
| Discharge | BWSC and MWRA approval before sewer or storm discharge | Carry review and approved route separately |
| Historic scope | Owner and designer consult relevant commission if applicable | Keep cleaning method subject to historic review |
| Application | Complete submission at least seven days before work | Submission lead time is not a guaranteed approval date |

The form says incomplete applications are not processed and calls for submission at least seven days before work. Ask the contractor for its complete package and the actual approval before releasing the start. For an illustrative masonry cleaning alternate, a cheaper method may change containment or wastewater scope; level those costs and historic implications with the method, not as unrelated general conditions. [Assign specialist and shared protection scope](https://piper-ai.com/resources/construction-safety-scope-prebid-review) and [check independent Boston obligations](https://piper-ai.com/resources/boston-preconstruction-obligation-decision-guide).