title: 'Boston Article 85: carry completeness and significance review into demolition planning'
url: 'https://piper-ai.com/resources/boston-article-85-demolition-schedule-review'
description: 'Record the complete application date, staff determination and demolition authorization separately before committing to a Boston demolition start.'
contentTypes: [guide]
publishedAt: '2026-11-21T10:26:24.076Z'
updatedAt: '2026-11-21T10:26:24.090Z'
author: 'Ido Gedanken, CEO'
readingTime: 1
---

# Boston Article 85: carry completeness and significance review into demolition planning

For a Boston demolition estimate, carry the review path as a schedule dependency until the responsible team confirms the parcel and the actual decision. Application completeness starts a staff determination period; it is not itself permission to demolish.

Boston says Article 85 covers all buildings in Downtown or Harborpark, other buildings at least 50 years old, and buildings in a Neighborhood Design Overlay District. Designated landmarks follow a different process. The City describes a 10-calendar-day staff determination period after a complete application; a significant finding leads to a hearing and consideration of alternatives. See the [City's review process](https://www.boston.gov/departments/landmarks-commission/how-file-article-85-demolition-review).

## A demolition-gate register for the bid schedule

| Record | Evidence or decision | Estimate and schedule consequence |
| --- | --- | --- |
| Parcel and building | Address, age, district map and landmark status; owner and designer confirm route | Do not assume every structure follows the same path |
| Application | Filing and confirmed complete dates; applicant owns missing items | Put determination after completeness, not merely submission |
| Significance | Staff decision and any hearing or alternatives status | Keep mobilization conditional while the route remains open |
| Authorization | Actual demolition authorization and other prerequisites; permit owner records evidence | Release trade start only against the actual approvals |

For example, if a bid assumes demolition immediately after filing, the estimator should identify the gap between the filing date and confirmed completeness, then ask the applicant for a schedule covering a possible significant finding. That is a planning scenario, not a prediction of the City's decision. Carry the cost of a different start or resequencing explicitly if the contract allocates it to the GC.

Before commitment, have the owner and design team resolve district and designation evidence, name the applicant, and identify which approvals actually control the proposed start. Use the broader [Boston obligation decision guide](https://piper-ai.com/resources/boston-preconstruction-obligation-decision-guide) to check independent reviews, and [trace demolition and following-trade scope](https://piper-ai.com/resources/construction-scope-generation-guide) when a delayed release changes the sequence.