# Boston occupied-building fire-system work: price the impairment handoff

For phased work in an occupied building, a sprinkler alteration price is incomplete if nobody owns the impairment window and restoration handoff. Ask the owner and qualified fire team to establish the approved sequence and affected occupancy before the GC carries repeated work periods.

The [BFD water-based suppression instructions](https://documents.boston.gov/images_documents/BFD%20Fire%20Safety%20Requirements%20for%20Alteration%20and%20Impairment%20to%20Water%20Based%20Suppression%20Systems_tcm3-49400.pdf), dated 2015 and linked by the City, describe coordinated notification, responsible presence, testing and daily restoration. Have the fire professionals and BFD confirm the requirements for the current project. This is an estimating handoff, not a shutdown procedure.

## Price each proposed window

| Handoff | Evidence owner | Estimate question |
| --- | --- | --- |
| Occupancy and area | Owner and fire team | Which spaces remain occupied and when can work occur? |
| Notification and approval | Qualified fire team and owner | What evidence is required before each window? |
| Presence | GC and qualified team | Who attends throughout and what is included in the trade quote? |
| Testing and restoration | Fire contractor and owner | Are repeated restoration and tests priced for each work period? |
| Paid detail | Authorized contractor agent | Does BFD require a detail and what is the current quote? |

A contractor fire watch and a paid BFD detail are distinct. The [City's detail page](https://www.boston.gov/departments/fire-prevention/paid-fire-department-details) says a detail can be a permit condition or required for an occupied building with impaired protection. It specifies scheduling deadlines and a four-hour minimum; confirm current rates and conditions. Compare a single extended window with several approved shorter windows only after the owner and fire team establish what is permissible. [Price repeated handoffs](https://piper-ai.com/resources/preconstruction-phasing-estimate-review) and [triage other obligations](https://piper-ai.com/resources/boston-preconstruction-obligation-decision-guide).