# Boston landmark work: preserve the approved design basis before leveling substitutions

For a Boston landmark or local historic district project, level the approved product and a bidder's proposed alternative as different scope until the responsible designer confirms the review path. A lower price does not establish that a change falls within the existing approval.

The [Boston Landmarks Commission](https://www.boston.gov/departments/landmarks-commission/landmarks-commission-common-questions) distinguishes design review from Article 85 demolition review. Guidelines vary by district or landmark; administrative review still requires a decision, and zoning board approval does not replace Landmarks approval. Local designation should not be inferred solely from National Register recognition.

## Link each alternative to the approval record

| Register field | What the estimator needs | Decision owner |
| --- | --- | --- |
| Designation and guideline | Applicable landmark or district and current guidance | Owner and designer |
| Approved basis | Approval, drawing revision and specified product or detail | Designer |
| Bid alternative | Manufacturer, material, profile and installation difference | Trade bidder |
| Review decision | Whether the change needs a submission and actual decision | Designer and commission |
| Commercial effect | Price, lead time and schedule exposure pending decision | GC and owner |

For example, a window bidder may offer a different profile. Carry the specified basis and the alternate separately while the designer compares it with the approval and asks the Commission about any necessary review. Do not promise that administrative review means automatic acceptance.

Before buyout, obtain the actual decision and incorporate its conditions into the subcontract. [Review proposed substitutions and qualifications](https://piper-ai.com/resources/review-subcontractor-exclusions-and-qualifications) and use the [Boston decision guide](https://piper-ai.com/resources/boston-preconstruction-obligation-decision-guide) for independent approvals.