# Brookville and Kissena restroom bundle: separate site scope from shared approvals

## One bundle, two Queens site reviews

Brookville and Kissena belong to a five-site citywide design-build restroom bundle, not a Queens-only contract. The [DDC August 2025 presentation](https://www.nyc.gov/assets/ddc/downloads/presentations/MeetTheTeam_Queens_Presentation.pdf) also names East River Park, Murphy Brothers Playground and Van Cortlandt Park. It describes one-story buildings with women's and men's restrooms and mechanical rooms. That common program is a starting point for review, not proof of matching site conditions.

The presentation lists opportunities including piling, site and utility work, foundations, roofing and MEP trades. A bundle-wide list does not establish that each listed trade, quantity or foundation solution applies at each Queens park. A bidder needs the applicable site plans and specifications before allocating work.

## Separate approval evidence from site work

The dated presentation distinguishes design-builder Armand's prequalification from DDC's separate subcontractor approval process, including RFAS and supporting documentation. Those are two different review gates in that presentation. Package-specific references to PASSPort, the project labor agreement and labor documentation are not a general rule for every city project or evidence that a particular firm is approved.

| Level | Shared evidence or site question | Review action |
| --- | --- | --- |
| Bundle | Building program and common procurement instructions | Identify governing package and latest amendments |
| Bundle | Design-builder prequalification and DDC subcontractor approval | Track each gate and its current required evidence separately |
| Brookville | Foundation and utility connections | Obtain site plans, geotechnical basis and connection limits |
| Kissena | Foundation and utility connections | Repeat the site review without copying Brookville quantities |
| Each site | Roof, finishes, access and protection | Compare issued details and site-specific constraints |
| Each handover | Utilities and completed building | Identify testing, restoration and acceptance responsibilities |

A shared mechanical room description may support a common scope template. It does not resolve a utility route, excavation depth, roof detail or park-access restriction. List those as separate site rows, and invite each bidder to identify what it has priced at each location. The [bid-leveling documentation guide](https://piper-ai.com/resources/public-bid-leveling-documentation) explains how to keep package qualification and trade-scope evidence separate.

## Refresh the instructions before a pursuit

The 2025 slides describe a historical process and forecast, not live registration slots, final site designs or a current opportunity. Confirm the controlling package, amendments and approval instructions with the issuing parties before relying on any gate or submitting a price.