title: 'Second Avenue Subway Phase 2 Fit-Out: Contract C26204 Guide'
url: 'https://piper-ai.com/resources/c26204-systems-finishes-entrances-and-ancillary-buildings-for-second-avenue-subway-phase-2-contractor-guide'
description: 'Review Second Avenue Subway Phase 2 fit-out; review station, systems and prior-contract interfaces and verify current procurement documents before pricing.'
contentTypes: [guide]
publishedAt: '2026-11-20T00:24:45.256Z'
updatedAt: '2026-11-20T00:24:45.266Z'
author: 'Ido Gedanken, CEO'
readingTime: 2
---

# Second Avenue Subway Phase 2 Fit-Out: Contract C26204 Guide

The MTA overview describes the fourth and final Second Avenue Subway Phase 2 contract, with station and tunnel fit-out at 106th, 116th and 125th Streets, entrances and ancillary buildings, track, traction power, communications, signals and testing. The overview extends CBTC work across Phase 1 and Phase 2. The [official solicitation notice](https://www.mta.info/document/218841) is the source for this description.

Research checked November 15, 2026 using supplied agency snapshots. This is independent Piper analysis, not an agency notice or affiliation. Confirm current status before acting.

## Procurement stage and dates

Both listing and September 8 notice record November 10 for the first-stage solicitation, elapsed by the research date. The notice describes a two-step process in which only shortlisted respondents proceed to the RFP; it does not establish an award. The November 13 MTA listing snapshot records an estimated value of $100M+, a term of 52 months, and 2 addenda. These are snapshot fields, not a contract price or proof of current availability. Check the [agency source](https://www.mta.info/agency/construction-and-development/contracting/current-opportunities) and obtain the complete current solicitation and every addendum. Reconcile the deadline, eligibility and document baseline to the controlling material, rather than relying on an older notice or this guide.

## What the scope boundary means for the estimate

The project overview repeatedly uses C26204, but the notice narrative also says C26024. Confirm the identifier against the issued RFQ before pursuing. The package interface with earlier station and tunnel shell contracts is central to scope allocation.

Record each interface against its drawing or specification, the responsible trade and estimate line. Leave an unresolved boundary open until the issued documents or a clarification establish it.

## Project-specific documents and questions

Obtain the solicitation instructions, drawings, specifications, project overview, available existing-condition information and all revisions. Assign an owner to answer these questions against that baseline:

- What work and existing-condition information is handed over from the earlier shell contracts?
- Where do station fit-out, systems, track and commissioning responsibilities meet?
- What are the boundaries and acceptance interfaces for the CBTC work across both phases?

For each answer, record the controlling sheet or clause, responsible trade, estimate treatment and the owner of the remaining decision. Reissue affected inquiries when an addendum changes that basis.

## Keep the review tied to the issued package

Use the [NYC public bid review checklist](https://piper-ai.com/resources/nyc-public-construction-bid-review-checklist), [addenda management for estimators](https://piper-ai.com/resources/construction-addenda-management-for-gc-estimators), [rail and airport prebid access review](https://piper-ai.com/resources/nyc-rail-airport-prebid-access-review) to structure the review. The NYC public project guides provide a directory of related packages.

For an issued document set, [Piper scope generation](https://piper-ai.com/use-cases/scope-generation) can help prepare a scope for review; check the resulting references and trade assignments against the current package.