# Queensboro Plaza to 33rd Street Structural Repairs: C35310 Guide

The IFB overview calls for abrasive blasting and painting elevated structures, structural-member repair and replacement, wayside-building exterior painting and exterior component and fenestration repairs, and demolition of one signal tower. The [official solicitation notice](https://www.mta.info/document/221206) is the source for this description.

Research checked November 15, 2026 using supplied agency snapshots. This is independent Piper analysis, not an agency notice or affiliation. Confirm current status before acting.

## Procurement stage and dates

The November 13 listing records November 17 as the due date and shows the contract number as N/A; the September 18 notice identifies SSE C35310 and October 27. The notice calls it A + B bidding. The November 13 MTA listing snapshot records an estimated value of $50M - $100M, a term of 1,284 Calendar Days, and 5 addenda. These are snapshot fields, not a contract price or proof of current availability. Check the [agency source](https://www.mta.info/agency/construction-and-development/contracting/current-opportunities) and obtain the complete current solicitation and every addendum. Reconcile the deadline, eligibility and document baseline to the controlling material, rather than relying on an older notice or this guide.

## What the scope boundary means for the estimate

The painting package has structural, building-envelope and demolition boundaries. Ask for a breakdown that identifies each rather than treating the project as a single coating quantity.

Record each interface against its drawing or specification, the responsible trade and estimate line. Leave an unresolved boundary open until the issued documents or a clarification establish it.

## Project-specific documents and questions

Obtain the solicitation instructions, drawings, specifications, project overview, available existing-condition information and all revisions. Assign an owner to answer these questions against that baseline:

- Which structural members are designated for repair or replacement and what condition information supports the takeoff?
- What is included in wayside-building exterior repairs and fenestrations?
- How are the signal tower demolition and the painting-to-steel repair interfaces allocated?

For each answer, record the controlling sheet or clause, responsible trade, estimate treatment and the owner of the remaining decision. Reissue affected inquiries when an addendum changes that basis.

## Keep the review tied to the issued package

Use the [NYC public bid review checklist](https://piper-ai.com/resources/nyc-public-construction-bid-review-checklist), [addenda management for estimators](https://piper-ai.com/resources/construction-addenda-management-for-gc-estimators), [rail and airport prebid access review](https://piper-ai.com/resources/nyc-rail-airport-prebid-access-review) to structure the review. The NYC public project guides provide a directory of related packages.

For an issued document set, [Piper scope generation](https://piper-ai.com/use-cases/scope-generation) can help prepare a scope for review; check the resulting references and trade assignments against the current package.

Compare the repair limits and painting interfaces across the two elevated-structure packages; each has its own locations and issued scope. See the Manhattan elevated Broadway-Seventh Avenue repairs guide.