---
title: 'Campos Plaza II PACT: electric space heat still needs a hot-water scope'
url: 'https://piper-ai.com/resources/campos-plaza-ii-pact-steam-heat-pump-boundaries'
description: 'Separate window heat-pump installation from retained steam hot-water repairs, ventilation and occupied-apartment work at Campos Plaza II.'
contentTypes: [guide]
publishedAt: '2026-11-25T12:13:30.771Z'
author: 'Ido Gedanken, CEO'
readingTime: 2
---

# Campos Plaza II PACT: electric space heat still needs a hot-water scope

At Campos Plaza II, do not treat conversion to electric space heat as removal of every steam obligation. The announced plan uses window heat pumps for heating and cooling while repairing existing steam systems to maintain domestic hot water. A GC estimator should separate the new apartment equipment from the retained service and test the shutdown, power, window and ventilation interfaces in each trade proposal.

## A financing milestone and two building scopes

[NYCHA's February 5, 2026 announcement](https://www.nyc.gov/site/nycha/about/press/pr-2026/pr-20260205.page) reports a $92.5 million financing close for 224 apartments in two East Village buildings. It identifies L+M Development Partners and Type A Projects as the PACT partners. The announcement describes apartment renovations, facade, roof, window, elevator and ventilation work. Its approximately three-year construction duration was an expectation, not evidence of current progress or completion.

NYCHA also describes renovation of the existing community center and a new Active Resident Center. Each needs a defined boundary and service connection; the residential apartment program should not be assumed to cover either automatically.

## Review the system boundaries

This table is estimator analysis, not an allocation of the actual contract.

| Scope | Question to resolve | Evidence for the carry |
| --- | --- | --- |
| Electric space heating and cooling | Who supplies, installs, powers and tests each window heat pump? | Equipment schedule, electrical design, window interface and startup scope |
| Retained steam for hot water | Which existing equipment and piping are repaired and who maintains hot-water service during work? | Survey, repair limits, shutdown plan and test responsibility |
| Windows and envelope | Who measures, supports and seals the unit at the replacement window? | Approved details, field dimensions and finish responsibilities |
| Ventilation | How do ventilation upgrades coordinate with the apartment sequence? | Design and testing requirements, access and restoration limits |
| Community spaces | Which work belongs to the existing center and which to the new resident center? | Separate plans, system connections and access arrangements |

A quote that excludes steam may be reasonable for the heat-pump installer, but the estimate must find the retained steam repair in another package. Conversely, a steam repair price should not be presumed to include the new electric circuits and window sealing. Follow each exclusion into an identified scope and record any unanswered responsibility.

## Illustrative apartment release

Before returning an apartment to use, a sample checklist would confirm the resident access arrangement, window and weather seal, electrical connection, heat-pump functional test, ventilation work, finishes and hot-water service. Coordinate a steam shutdown with the building-wide sequence rather than treating it as an isolated apartment task. This is a proposed estimating check; the approved resident and construction plans determine the actual process.

The [MEP coordination review](https://piper-ai.com/resources/mep-coordination-preconstruction-scope) helps assign the crossings between systems. Use the [subcontractor exclusions review](https://piper-ai.com/resources/review-subcontractor-exclusions-and-qualifications) to check that the retained steam and new equipment work both have an owner. The financial close is not a claim of an open trade solicitation.
