# Catch the gaps between tools: final bid review across the estimate, quotes and addenda

On bid day the estimate, the sub quotes, the drawings and addenda, and the scope sheets usually sit in different files. Each one can be right on its own while the bid is still wrong, because the errors live in the transfer between them.

## Every file can be right and the bid still wrong

The estimate sits in a spreadsheet. The sub quotes arrived by email and bid platform in the last hours. The drawings and addenda are in a PDF viewer, and the scope sheets in another file.

A plug left in after a sub covered the item. An addendum acknowledged on the bid form but priced by nobody. A carried number that no longer matches the quote. None of these shows up when you check one file at a time, and on public work a judgment mistake usually cannot be fixed after bid opening.

## Worked example: three gaps in an estimate that checks out line by line

Hypothetical: a four-story medical office building, private hard bid due Thursday at 2:00 pm. The estimate has been reviewed once and every cell is defensible on its own.

| Where | What it says | If nobody connects it |
| --- | --- | --- |
| Estimate, Division 07 | A $38,000 firestopping allowance carried early in the week, before any firestopping quote came in. | The drywall quote now carried lists “firestopping of penetrations through rated partitions” as included. Part of the $38,000 is now carried twice, and nobody has checked which part. |
| Addendum 3, issued Tuesday | Adds an emergency generator transfer switch and changes roof insulation from R-25 to R-30. The bid form acknowledges Addenda 1 to 3. | The carried electrical quote is “per Addendum 1”, the roofing quote “per Addenda 1 and 2”. The bid owns Addendum 3 and nothing prices it. |
| General conditions and Division 01 | General conditions are priced on 14 months. The Division 01 schedule says 480 calendar days, about 16 months. | The winter protection line still uses an older 12-month schedule. One project, three durations. |
| Bid form | Filled in correctly: addenda acknowledged, alternates entered, math checks. | The form passes every check because the gaps are between the files behind it. |

None of the three is visible inside one file. Each needs the estimate next to the quote, the addendum log or the Division 01 schedule. That is what final bid review is for.

> **Have a bid going out soon?** Bring a current or recent estimate and the sub quotes you are carrying. We will review them against the drawings, scopes and addenda together on a call, on your project. [Book a project demo](https://piper-ai.com/demo)

## Final bid review: twelve checks between the files

Run these after the estimate is done and before the form is signed. Math is the last check, not the first.

1. **Addenda in the form and in every quote.** Each carried sub quote names the latest addendum. List any that reference an older one.
2. **Plugs against carried quotes.** Every plug or allowance is checked against the quote now carried for the same scope.
3. **Carried numbers match their source.** Summary, leveling sheet and quote agree, including alternates and deducts.
4. **No silent exclusions.** Every exclusion in a carried quote is priced elsewhere, qualified on purpose, or accepted as risk.
5. **One duration everywhere.** General conditions, escalation, winter work and insurance use the same schedule.
6. **Bond and insurance on the right base.** Rates and the base they apply to match the bid documents.
7. **Bid form arithmetic and blanks.** Unit-price extensions, alternates in the right blanks, signatures.
8. **Required attachments.** Bid bond form, sub list, M/WBE or SDVOB forms, non-collusion, registrations.
9. **Sealed sub list matches the carry.** On public work that requires one, the listed subs and amounts match what you carried.
10. **No qualification that modifies the invitation.** A condition that changes the owner’s requirements can make a bid nonresponsive.
11. **Owner items, allowances and contingency appear once.** Not in a sub quote and again in your own lines.
12. **Clean, dated working papers.** On NY and PA public work they are the evidence if you ever need to show a clerical mistake.

## Why the review happens before the bid, not after

- On New York municipal work, a bid with a mistake can be withdrawn only for a clerical error proven from the original working papers, within three days of opening. Amending the bid is prohibited. Source: [NY General Municipal Law §103(11)](https://newyork.public.law/laws/n.y._general_municipal_law_section_103).
- In Pennsylvania, a bidder seeking to withdraw a bid for a clerical mistake must give written notice within two business days of opening. If the owner rebids, that bidder pays the rebid costs and may not work on the project as a sub or supplier without written approval. Commonwealth agencies under the Procurement Code follow their own rules. Source: [PA Act 4 of 1974](https://www.palegis.us/statutes/unconsolidated/law-information?SessYr=1974&SessInd=0&ActNum=4).
- On New York public work where a sealed sub list is required, bidders name their plumbing, HVAC and electrical subs and the amount for each. Changes after the low bid need the owner’s approval. Source: [NY General Municipal Law §101](https://newyork.public.law/laws/n.y._general_municipal_law_section_101).
- On federal sealed bids, a bid is rejected when the bidder imposes conditions that modify the requirements of the invitation. Source: [FAR 14.404-2](https://www.acquisition.gov/far/14.404-2).

## Related guides

- [Case study: final review of a finished bid](https://piper-ai.com/resources/final-bid-review-case-study-finished-bid): 38 findings on a bid already signed off, about one in three critical, none of them arithmetic.
- [Final bid review QA/QC for general contractors](https://piper-ai.com/resources/final-bid-review-qa-qc-general-contractors): the full playbook and pre-submission checklist.
- [A finished estimate can still be stale](https://piper-ai.com/resources/a-finished-estimate-can-still-be-stale): the addendum and revised-quote failure from the example.
- [How to defend the number you carry](https://piper-ai.com/resources/carry-number-methodology-construction-bids): plug versus sub number, and the basis behind a carry.
- [Contingency and allowances in estimate review](https://piper-ai.com/resources/construction-contingency-allowances-estimate-review): making sure each one appears exactly once.
- [NYC public construction bid review checklist](https://piper-ai.com/resources/nyc-public-construction-bid-review-checklist): attachments and requirements for New York public work.

## Where Piper fits

- Piper reads the estimate next to the drawings, specs, addenda, trade scopes and the sub bids in the same project.
- It flags scope with no cost, duplicated scope, stale carries and quotes on an old addendum.
- Every finding links to the sheet, spec section, quote page or estimate line it came from.
- Your company’s review questions can become checks on every bid.
- Piper does not change the estimate. It points your senior reviewer at what to look at.