# CCNY student accessibility: separate the testing office from the assistive-technology lab

At CCNY, keep the existing disability services and testing office separate from the assistive-technology lab in the room-by-room estimate. Then reconcile the shared abatement, partitions, electrical, IT, HVAC and life-safety responsibilities so that the two areas do not leave an unpriced boundary.

The [May 2026 CUNY record](https://data.cityofnewyork.us/resource/fb86-vt7u.json?$where=reporting_period%3D%27202605%27%20AND%20managing_agency%3D%27CUNY%27%20AND%20fms_id%3D%27CC001-022%27) describes an existing 2,630-square-foot office and testing center, Area A, and a 1,750-square-foot assistive-technology lab, Area B. It identifies 50 computers among the lab equipment and lists hazardous-material inspection, removal and abatement alongside interior and building-system work. The May 28 agency data lists construction procurement; it does not verify a current tender or issued package.

## Separate the two functions before assigning trades

This is estimator analysis of a source-dated narrative, not a room schedule.

| Area or interface | Review question | Document needed |
| --- | --- | --- |
| Area A: office and testing | Which existing rooms are retained or reconfigured? | Current plan, finish and door schedules |
| Area B: lab | Which furniture and technology are owner supplied and who installs them? | Equipment schedule and responsibility matrix |
| Hazardous materials | Who inspects, abates, clears and releases each area? | Survey, abatement design and phasing plan |
| Electrical and IT | Who supplies outlets, cabling, devices and final connections? | Load schedule, IT design and equipment list |
| HVAC and life safety | Where do base-building systems end and fit-out distribution begin? | Mechanical and fire alarm plans and test requirements |

The lab is described as serving several learning and testing functions. Do not convert the stated computer count into a presumed outlet count or infer a layout. Obtain the current plan and equipment responsibility schedule, then compare each electrical and IT proposal against it.

## Release the space in sequence

For an illustrative carry, separate investigation and abatement from construction. Identify the clearance needed before partitions and above-ceiling work, then show when power, cabling, furniture and equipment can be installed and tested. If Area A must operate during work, verify a temporary location and schedule with the owner rather than assuming one.

The agency narrative describes full accessibility and compliance with current codes. The applicable requirements and design must be verified against the actual filing and issued plans; the narrative alone does not define an accessible route or acceptance procedure.

For the broader package review, use the [trade scope generation](https://piper-ai.com/resources/construction-scope-generation-guide) and the [MEP coordination review](https://piper-ai.com/resources/mep-coordination-preconstruction-scope).