# Citywide Indoor Pool Filter Plant Reconstruction: project status and contractor scope review

NYC Parks describes pool filter plant reconstruction across the listed locations at East 54th Street between 1st and 2nd Avenues and 261 Bedford Avenue, Manhattan and Brooklyn. Tracker ID 10319, FMS 846 P-2MTFLTR, was in **procurement** in the record last updated November 13, 2026. For a GC, the pursuit decision depends on the actual issued scope and whether a solicitation is available, not the tracker phase alone. [NYC Parks tracker record](https://data.cityofnewyork.us/resource/4hcv-tc5r.json?trackerid=10319).

## Recorded project status

The record reports design 100% complete, procurement 85% complete and construction 0% complete. These are separate phase measures. Project funding is recorded as between $3 million and $5 million; that is a funding band, not a bid price or contract award. Design actually completed August 1, 2023; the original design projection was June 1, 2023. Procurement began September 1, 2025 and its recorded projected completion was September 1, 2026. That forecast had passed by the research date; the current schedule is unknown and the record does not establish completion. The construction start field is January 1, 2027 and projected construction completion is January 1, 2028; the start field alone does not establish that work began. [Source: NYC Parks tracker](https://data.cityofnewyork.us/resource/4hcv-tc5r.json?trackerid=10319); see also the [dataset and data dictionary](https://data.cityofnewyork.us/Recreation/Capital-Project-Tracker/4hcv-tc5r).

## Two pool plant locations

Make a location-by-location scope matrix before requesting prices. The two tracker rows identify East 54th Street and 261 Bedford Avenue, but do not say which equipment is included at each plant. Check the issued equipment schedules and drawings for each location, and reconcile any differences in removal and replacement scope. Do not assume identical plant packages or count the repeated funding twice.

This is an estimating review question, not a statement that any particular item is required. Obtain the drawings, specifications and addenda before assigning scope or settling a bid/no-bid decision. Use the [NYC public bid review](https://piper-ai.com/resources/nyc-public-construction-bid-review-checklist) to record unanswered questions and the responsible reviewer.

## Check the current procurement documents

Search the City's [Procurement Navigator](https://www.nyc.gov/site/mocs/passport/articles/find-opportunities.page) using the project name and identifiers, and confirm any match with the issuing agency. The City says public opportunities can be searched without a PASSPort account. Check the current solicitation, status, due date and all addenda directly; the tracker snapshot does not establish an open bid. The NYC public project directory provides context for other named packages.

## Compare the plant scopes

Once the team has the project documents, [Piper's scope-generation workflow](https://piper-ai.com/use-cases/scope-generation) can support a document-based scope review. Compare the resulting scope with the issued documents and subcontractor qualifications; resolve open boundaries before carrying a price. See the [construction scope review guide](https://piper-ai.com/resources/construction-scope-generation-guide).

*Research checked November 15, 2026. This is independent Piper analysis, not an NYC Parks notice or agency affiliation.*