---
title: 'The Clemente renovation: an elevator tower changes more than vertical transport'
url: 'https://piper-ai.com/resources/clemente-soto-velez-elevator-tower-accessibility'
description: 'Treat the elevator tower as a circulation project with a vertical transport package inside it. A landing can be priced only when the adjoining route, building work and services are assigned.'
contentTypes: [guide]
publishedAt: '2026-11-26T15:02:58.350Z'
author: 'Ido Gedanken, CEO'
readingTime: 2
---

# The Clemente renovation: an elevator tower changes more than vertical transport

Treat the elevator tower as a circulation project with a vertical transport package inside it. A landing can be priced only when the adjoining route, building work and services are assigned.

## A new rear entry reaches every floor

The agency describes an accessibility renovation with a new rear entry and elevator tower, fire alarm upgrades and resulting changes to circulation, stairs, restrooms, elevator lobbies, electrical work and service wires. The [NYC Capital Projects Dashboard May2026 agency record: PV234CSV1](https://data.cityofnewyork.us/resource/fb86-vt7u.json?$where=reporting_period%3D%27202605%27%20AND%20managing_agency%3D%27DDC%27%20AND%20fms_id%3D%27PV234CSV1%27) lists the phase as Construction in its May 2026 reporting period. Its agency data date is 2026-06-23. This is a source-dated narrative, not evidence of a live tender, an award or observed physical progress.

## Assign the interfaces before carrying the price

| Interface | Scope or question | Estimator review |
| --- | --- | --- |
| Rear entry | Connect new entry and tower to the existing route. | Confirm limits, doors and exterior reinstatement. |
| Each floor landing | Reconfigure elevator lobby and circulation. | Mark demolition, finishes and adjacent access on each floor. |
| Stairs and restrooms | Resolve residual impacts in the design. | Identify affected rooms and temporary routes. |
| Building services | Coordinate electrical work, service wires and fire alarm upgrades. | Assign disconnect, rerouting and testing to named packages. |

The table is estimator analysis, not an owner scope assignment. Compare the issued drawings and specifications with each bidder’s qualifications. Record the drawing revision and the package that accepts each connection, restoration and test.

## A landing-by-landing scope register

Illustrative estimator analysis: list each floor separately, then record the existing arrival point, proposed lobby boundary, adjacent room changes, affected wiring, temporary route and the drawing revision establishing each item. A tower price that ends at the hoistway opening can leave lobby demolition and finish restoration unowned; a lobby allowance that assumes the elevator trade includes them can double count.

The agency description is not an accessibility design approval. Ask the responsible design professional to identify the governing requirements, approved route and final fire alarm scope before setting a bid basis.

For the next review, use the [code requirements review](https://piper-ai.com/resources/construction-code-requirements-scope-review) and [MEP coordination review](https://piper-ai.com/resources/mep-coordination-preconstruction-scope) to carry the selected assumptions into trade scope.
