---
title: 'AIA, EJCDC and ConsensusDocs: verify the issued contract family before pricing'
url: 'https://piper-ai.com/resources/construction-contract-document-family-review'
description: 'Compare the structure of AIA, EJCDC and ConsensusDocs, then verify the actual agreement, conditions and amendments that define pricing obligations.'
contentTypes: [guide]
publishedAt: '2026-11-25T16:13:43.603Z'
author: 'Ido Gedanken, CEO'
readingTime: 3
---

# AIA, EJCDC and ConsensusDocs: verify the issued contract family before pricing

Before pricing contract obligations, identify who contracts with whom and obtain the actual agreement, incorporated conditions and amendments. A form number is a starting point, not proof that an unmodified blank describes the proposed risk. Have counsel review the issued set and resolve missing documents with the owner before commitment.

[AIA's family overview](https://learn.aiacontracts.com/articles/contract-document-families/) distinguishes conventional, construction manager as adviser, construction manager as constructor and design-build families. Each reflects a different relationship among owner, designer and construction participants. The [delivery-method comparison](https://piper-ai.com/resources/hard-bid-vs-cmar-vs-design-build-estimating-workflows) addresses selection of a workflow; here the question is what the issued documents actually require.

## Compare the relationships first

| Structure | Starting relationship | Document review question |
| --- | --- | --- |
| Conventional | Owner separately engages architect and contractor | Which owner-contractor agreement and general conditions are incorporated? |
| CM adviser | CM advises while owner holds multiple trade contracts | Which coordination and estimating obligations belong to the adviser and which to each contractor? |
| CM constructor | CM acts as constructor and may provide a GMP | What preconstruction, construction and GMP exhibits are actually included? |
| Design-build | Owner contracts for combined design and construction responsibility | How are design obligations and downstream designer interfaces allocated? |

AIA lists A132 and A232 in its adviser family, and A133 or A134 with A201 among constructor documents. Conventional documents include A101 and A201. These identifiers do not establish the edition or amendments on a particular project, nor do they make different forms interchangeable.

## Compare document structures without assuming equivalent terms

The publisher changes where the team must look for obligations. [EJCDC’s first-party guidance](https://ejcdc.org/faqs/) describes its coordinated document families and identifies C-700 general conditions as a foundation of its Construction Series, which assumes the design engineer participates during construction. It recommends legal review when documents change because a revision can affect other documents. That identifies a review path; it does not establish what an amended issued agreement says.

[ConsensusDocs describes its 200 agreement](https://www.consensusdocs.org/contract/) as integrating the owner-constructor agreement and general terms and conditions into one document. An estimator who expects a separate A201-style attachment should check the actual package rather than assume the general conditions are absent. Conversely, an integrated document does not establish that every exhibit or project amendment is present.

| Publisher example | Starting document structure | Verification before pricing |
| --- | --- | --- |
| AIA conventional family | Owner-contractor agreement with incorporated general conditions | Obtain the exact agreement, conditions and supplementary amendments |
| EJCDC Construction Series | Coordinated documents with C-700 general conditions | Confirm the issued agreement, conditions, engineer role and related revisions |
| ConsensusDocs 200 | Agreement and general terms integrated | Read the complete issued document and referenced exhibits or modifications |

This comparison concerns document structure, not a claim that one publisher’s risk allocation is better or that equivalent clause numbers carry equivalent terms. Read the actual provisions, effective editions and negotiated changes with counsel.

## Build the issued-document register

A hypothetical bidder receives an A133 agreement referencing A201, a GMP exhibit and supplementary conditions. The bid folder contains the agreement and an older general conditions file, but no exhibit. The estimator should not assume the missing exhibit is standard or price only from the title. Record the issue date and version of every item, the incorporation reference and whether the document is actually present. Request the referenced exhibit and confirm whether the older conditions are intended before fixing the estimate basis.

For each agreement, general and supplementary condition, exhibit, addendum and amendment, record the responsible reviewer, precedence or conflict question for counsel, and any estimate consequence. Extract insurance, bonds, allowances, schedule, payment, changes and preconstruction deliverables into the appropriate cost or qualification owner. Identify subcontract flow-down separately; an owner-GC term does not automatically describe the proposed subcontract.

The agreement and its conditions do different jobs, and a supplementary condition may amend a general provision. The [general conditions and general requirements guide](https://piper-ai.com/resources/general-conditions-vs-general-requirements-construction) helps distinguish contractual risk from project execution requirements. Do not use a downloaded blank as a substitute for the issued, amended set.
