# Equipment insurance in the bid: distinguish owned, rented and borrowed plant

An equipment rate does not answer who bears a loss while the machine is in transit, on site or in another contractor's custody. Before carrying owned, rented or borrowed plant, compare the actual rental or loan terms with the company's equipment policy and identify the cost of any retained obligation.

[Travelers' equipment guidance](https://www.travelers.com/resources/business-industries/construction/contractors-equipment) notes that treatment of owned, rented and borrowed equipment can differ and that rental protection and reporting terms need review. That provider's discussion is not a coverage determination. The issued policy, endorsements and agreement control the actual question.

## Review the plant exposure alongside the rate

| Question | Record for the equipment schedule |
| --- | --- |
| Ownership and custody | Owner, contracting entity, operator and period of possession |
| Use and location | Intended work, site, storage and any restrictions |
| Movement | Who arranges loading, transport and return, and whose terms apply |
| Valuation | Rental agreement loss valuation compared with the policy basis and limit |
| Reporting | Schedule, newly acquired property and reporting requirements to confirm |
| Rental protection | Fee, terms, limitations and remaining contractual responsibility |
| Deductible and reviewer | Retained cost, coverage questions and risk-manager or broker response |

In a fictional excavation, a subcontractor borrows a pump and charges only for operation. The absence of a rental charge does not establish insurance. Ask who owns it, who is responsible for damage during transport and use, whether the relevant policy addresses borrowed equipment, and what value the loan agreement assigns. Carry any confirmed fee or retained exposure separately and identify an unresolved item before award.

Coordinate the schedule with [equipment logistics](https://piper-ai.com/resources/construction-logistics-plan-estimate-review), because location and movement affect the facts the adviser must review. The broader [project insurance review](https://piper-ai.com/resources/construction-insurance-builders-risk-liability) should not be treated as proof that this individual item is covered. Retain the agreement, policy response, values, deductible and person responsible for reporting changes. Ask the adviser to resolve coverage questions; do not infer a claim outcome from a certificate.