# Construction insurance: separate builders risk from liability before pricing

Builders risk generally addresses covered physical loss to a project under construction. Liability coverage addresses different exposures arising from claims against an insured business. For a commercial GC preparing a bid, the useful question is which policies the contract requires, who must obtain them, and what evidence confirms that the proposed arrangement fits the work.

Do not treat an insurance allowance in the estimate as proof of coverage. The policy, endorsements, contract requirements and a qualified insurance adviser determine the actual position.

## Read the project requirement before requesting a price

Start with the issued insurance provisions, not the coverage carried on the previous project. Record the named responsible party, covered period, limits, deductibles and requested endorsements. Identify whether an owner-controlled or contractor-controlled program is proposed and which exposures still require separate treatment.

[Travelers' builders-risk overview](https://www.travelers.com/business-insurance/inland-marine/construction/builders-risk) describes coverage for projects under construction. Its product description is not evidence that any particular contractor's policy covers a given loss. Ask the broker or insurer to reconcile the actual forms with this contract and project.

## Keep policy questions separate from scope ownership

A renovation may involve existing property, stored materials, completed portions and occupied operations. List those conditions for the adviser rather than assuming the phrase “builders risk” settles them. Ask who is responsible for purchasing the policy and providing the required evidence, and when the responsibility begins and ends.

An illustrative coordination issue is owner-provided coverage with a contractor-carried deductible. The estimate may need an explicit treatment for that exposure even though the GC is not purchasing the entire policy. The correct treatment depends on the agreement and confirmed coverage arrangement.

## Review subcontractor proposals against the same requirements

Check whether each bidder has included the applicable insurance obligations or qualified them. A proposal saying “standard insurance included” may not identify the same limits or endorsements the prime contract requires.

Keep the requirement, bidder response and unresolved adviser question together. A certificate should be reviewed through the company's insurance process; do not assume it changes policy terms. The [prebid-questionnaire guide](https://piper-ai.com/resources/survey-pre-bid-questionnaire) explains how standing company questions become project-specific checks.

## Preserve the cost basis and the decision owner

Show the reviewer what the allowance or quoted cost covers, who supplied the basis, and which qualifications remain open. Separate the cost of confirmed coverage from an unresolved contractual exposure. If the project duration, value, delivery arrangement or scope changes, ask whether the previous insurance basis remains suitable.

Keep [performance and payment bonds](https://piper-ai.com/resources/construction-performance-payment-bonds-bid-review) in a separate review lane. A bond and an insurance policy serve different functions; one does not establish the other.

## Put the company's contract questions in the review file

Piper's [Survey workflow](https://piper-ai.com/use-cases/survey) applies company questions to provided project documents and flags answers that need human follow-up. That can help the team identify the contract provisions to review and keep the findings with the project's later scope and estimate work.

Coverage selection, insurance verification and acceptance of contractual risk remain decisions for the contractor and its qualified advisers. The [final-review checklist](https://piper-ai.com/resources/final-bid-review-qa-qc-general-contractors) should preserve those approvals alongside the number.