---
title: 'Long-lead procurement: distinguish a delivery date from authority to place the order'
url: 'https://piper-ai.com/resources/construction-long-lead-purchase-commitment-review'
description: 'A practical commitment card helps a GC separate supplier lead time, purchase authority and financial exposure before placing a long-lead order.'
contentTypes: [guide]
publishedAt: '2026-11-23T05:48:54.843Z'
author: 'Ido Gedanken, CEO'
readingTime: 3
---

# Long-lead procurement: distinguish a delivery date from authority to place the order

A supplier's delivery forecast does not authorize a GC to place an order. Before a commercial GC commits to a long-lead item during an unsettled design or prime contract, identify exactly what the supplier needs, who can approve it, and what the project would owe if the design or deal changes. Carry the resulting decision into both the schedule and estimate.

A production reservation, deposit, purchase order and release for fabrication may be different events. Ask the supplier which one starts its quoted lead time and whether a slot is actually held. A date without that starting event can make the schedule appear more certain than the commercial commitment warrants.

## Use a commitment card before release

Consider this fictional mechanical package: a supplier offers a production slot for an air-handling unit if the GC pays a deposit, but the owner agreement and equipment design remain open. The GC should circulate a card like this for a decision, not treat the supplier's date as approval.

| Question | Illustrative card entry or decision needed |
| --- | --- |
| Item and design | Air-handling unit, equipment schedule revision B; capacity and controls interface still under review |
| Lead-time start | Supplier to confirm in writing whether deposit, approved submittal or fabrication release starts the clock; record validity and delivery assumptions |
| Authority | Identify the person authorized under the actual agreements to commit and the written owner direction, if needed; approval pending |
| Limit | Record the maximum authorized exposure and whether freight, tax and subsequent changes are included; no limit approved yet |
| Deposit and exit | Obtain payment milestones, cancellation and change terms, including amounts at risk at each stage |
| Custody and risk | Ask where equipment will be stored, who bears storage cost, when title and risk transfer, and whose insurance applies |
| Assignment and receipt | Ask whether and how the order could be assigned, who accepts delivery and what happens if the project or receiving site is not ready |
| Decision | Hold pending design and authority review; name a decision owner and deadline |

This is a review aid, not a substitute for the actual contract or supplier terms. A letter of intent, if proposed, needs its own review of scope and consequences; its title does not establish a particular legal effect. Ask counsel and the commercial team to resolve disputed terms before any signature or payment.

## Separate design maturity from purchase authority

The design team can identify a suitable basis for an equipment selection while commercial approval is still pending. Conversely, a spending authorization does not settle a missing controls interface. List both dependencies and show which party owns each response. Request a written supplier quote against a named revision, including assumptions that could change price or delivery.

The AIA's [2007 integrated project delivery guide](https://www.aia.org/sites/default/files/2023-11/ipd_guide.pdf) describes early supplier input and commitments for long-lead or custom items as design develops. It is an example of an IPD approach, not an obligation in every delivery method or evidence of a current lead time.

A delegated-design component also needs a separate permit, coordination and installation-release review. Purchase authority does not establish those approvals.

## Review payment, title and responsibility separately

A deposit can expose cash before equipment arrives. Compare the proposed payment and cancellation schedule with the authorization limit, and ask what documentation would support any reimbursement. For a labeled federal example, [FAR 52.232-5](https://www.acquisition.gov/far/52.232-5) addresses payment for certain offsite materials only under specified contract and evidentiary conditions; it also addresses title and continuing contractor responsibility. Those provisions do not establish the terms of a private project. Review the executed agreements and insurance arrangements for this order.

If the team cannot establish a defensible limit or decision authority, record the threatened slot as an unresolved risk rather than entering a fictitious order date. Escalate the choice between waiting, changing the design, or seeking a defined early authorization, with each option's stated assumptions.

## Carry the approved decision forward

Once approved, give the scheduler the actual trigger, decision date, fabrication and delivery assumptions, and receiving constraint. Give the estimator and cost team the approved amount, deposit treatment, remaining exposure, cost owner and revision. Record any unapproved balance separately; avoid counting a deposit again as an additional cost if it is part of the purchase price.

Revisit the card when the design, supplier terms or prime agreement changes. Use it to [define the preconstruction handoff](https://piper-ai.com/resources/preconstruction-services-deliverables-gc) and [reconcile estimate and cost records](https://piper-ai.com/resources/general-contractor-accounting-estimate-handoff) at buyout.

A delegated-design component also needs a separate [permit, coordination and installation-release review](https://piper-ai.com/resources/construction-deferred-submittal-approval-handoff). Purchase authority does not establish those approvals.
