title: 'CUNY Baruch College Field Building Renovation with Asbestos and HAZMAT Abatement: scope and procurement guide'
url: 'https://piper-ai.com/resources/cuny-baruch-college-field-building-renovation-with-asbestos-and-hazmat-abatement-contractor-guide'
description: 'Baruch College Field Building renovation: review DASNY’s qualification stage, Student Life fit-out, cooling upgrades and preliminary sequencing assumptions.'
contentTypes: [guide]
publishedAt: '2026-11-17T23:23:58.376Z'
updatedAt: '2026-11-17T23:23:58.395Z'
author: 'Ido Gedanken, CEO'
readingTime: 2
---

# CUNY Baruch College Field Building Renovation with Asbestos and HAZMAT Abatement: scope and procurement guide

DASNY project 389050 at Baruch College, 17 Lexington Avenue, New York, combines sixth- and seventh-floor shell fit-out for Student Life with cellar and rooftop cooling plant upgrades. The solicitation title also identifies asbestos and hazardous-material abatement. For preconstruction, the key issue is how abatement, fit-out and the two plant locations sequence together. [DASNY official opportunity: CUNY Baruch College Field Building Renovation with Asbestos and HAZMAT Abatement](https://www.dasny.org/opportunities/rfps-bids/2026/cuny-baruch-college-field-building-renovation-asbestos-and-hazmat)

This is independent Piper analysis, not an agency notice. Source information was checked November 15, 2026; verify the current agency documents before acting.

## Baruch Field Building EOI and design status

The November 3, 2026 notice is an EOI, not a priced bid; it listed responses due December 1 at 2 p.m. It describes design development at 60%, issued September 18, and bid drawings scheduled for November 20. DASNY expressly says its posted drawings and specifications are reference material, not 100% construction or bid documents. Qualified firms are to receive final documents and invitations to bid.

Sources for this project: [DASNY official opportunity: CUNY Baruch College Field Building Renovation with Asbestos and HAZMAT Abatement](https://www.dasny.org/opportunities/rfps-bids/2026/cuny-baruch-college-field-building-renovation-asbestos-and-hazmat).

## Cooling plant rigging and fit-out sequence

The notice reports a $16.5 million to $20 million construction estimate and assumes ten months of straight construction, contingent on actual sequencing and lead times. These are planning assumptions, not an award price or guaranteed duration. The design team assumes a crane for rooftop elements and fit-out HVAC units and cellar rigging through the areaway between the three Baruch buildings. Verify crane access, rigging openings, equipment dimensions and responsibility for restoration against the final package.

## Qualification requirements and bid documents

For the EOI, assemble five years of similar experience, five relevant projects from the last ten years and three sample schedules, plus the remaining requested safety, staffing, subcontractor, workload, insurance, bonding and vendor responsibility materials. The project PLA applies as described in the notice. Anticipated EEO and M/WBE goals are subject to the owner’s final determination. Ask how abatement release, roof work and plant outages govern access to the fit-out floors before using the ten-month assumption in a pursuit schedule.

## Turn the issued scope into a trade review

Once the team has the issued documents, use the [construction scope review guide](https://piper-ai.com/resources/construction-scope-generation-guide) to assign inclusions, exclusions and unresolved interfaces. The [NYC public bid review checklist](https://piper-ai.com/resources/nyc-public-construction-bid-review-checklist) helps check notice obligations separately. Compare the named package with the NYC public project directory before reusing assumptions from another job.