# Queens College hot water tank replacement and asbestos abatement: contractor guide

DASNY project **384530** is a sealed construction bid at Queens College, 65-30 Kissena Boulevard, Flushing, to replace domestic hot water storage systems in Rathaus and Kiely halls with instantaneous steam-fired heat exchanger heaters. The [DASNY notice](https://www.dasny.org/opportunities/rfps-bids/2026/cuny-queens-college-hot-water-storage-tank-replacement-and-asbestos) limits this solicitation to qualifying minority, women and small business enterprises. A GC should establish eligibility and the survey-to-removal scope before spending heavily on a price: this is a priced bid, and the public summary leaves important interfaces for the issued documents.

**Research checked November 15, 2026.** This guide is an independent snapshot, not a live procurement feed or an award notice. Verify current status and addenda before acting.

## What the two-building package includes

DASNY describes removal of the existing heaters, supports, piping and valves. The new heaters are to include expansion tanks, circulation pumps, piping, valves and required control components. The notice also describes an asbestos survey and identification for proper tank removal, plus drawings and specifications for any asbestos-containing material identified. It estimates the project at **$1 million to $1.2 million**. These are notice-level facts; quantities, equipment schedules and allocation of duties must be checked in the actual contract documents. [Source: DASNY](https://www.dasny.org/opportunities/rfps-bids/2026/cuny-queens-college-hot-water-storage-tank-replacement-and-asbestos).

The survey and subsequent drawings are a particularly important boundary. Do not assume the notice establishes that material is present, its quantity, or which party performs each task. Read the specifications and any survey information to determine who carries investigation, design, abatement, disposal and reinstatement, and how unidentified conditions are addressed.

## Bid eligibility and document baseline

The notice was issued October 9, 2026. It lists bids due **November 17, 2026 at 2:00 p.m. local time**, while warning the date may change if contract documents are unavailable when requested. Check the current deadline and addenda through the designated procurement channel. The notice says only bids from minority, women and small business enterprises meeting its stated criteria will be considered. It specifies Empire State Development certification for minority and women business enterprises and describes the small-business criteria in the notice. Check the exact solicitation requirements and your firm's evidence of eligibility rather than treating these conditions as rules for every DASNY project. [Source: DASNY](https://www.dasny.org/opportunities/rfps-bids/2026/cuny-queens-college-hot-water-storage-tank-replacement-and-asbestos).

The public page says contract documents are available through the Camelot planroom and that the stated process identifies an official plan holder of record. DASNY cautions that other copies may be incomplete or lack addenda and calls attention to the February 4, 2026 General Conditions for Construction. The notice is not a complete pricing set: establish a register of drawings, specifications and addenda before distributing scope to trades. [Source: DASNY](https://www.dasny.org/opportunities/rfps-bids/2026/cuny-queens-college-hot-water-storage-tank-replacement-and-asbestos).

The notice lists goals of 18% minority-owned, 12% women-owned, 6% service-disabled veteran-owned and 45% equal employment opportunity. These are distinct from the prime bidder set-aside. Review the solicitation's participation and documentation provisions and do not assume that a subcontractor's status alone establishes the bidder's eligibility. [Source: DASNY](https://www.dasny.org/opportunities/rfps-bids/2026/cuny-queens-college-hot-water-storage-tank-replacement-and-asbestos).

## Price the replacement as a connected system

A practical package review starts with the two halls separately, then reconciles their shared responsibilities. Use the following as questions for the issued documents, not assertions that each item is required:

1. **Remove and replace.** Identify heater sizes, quantities, existing supports and removal limits for each hall. Check the mechanical quote against the notice's inclusion of piping and valves, and assign any specified demolition and restoration.
2. **Steam and domestic water connections.** Trace supply, return and domestic-water tie-ins, isolation and required controls on the drawings. Ask which trade carries each connection and any specified electrical or controls integration.
3. **Survey through abatement.** Identify the specified survey, sampling, drawings and specifications, removal, testing and disposal responsibilities. Request separate scope and exclusions from the relevant firms, then reconcile them with the tank-removal quote.
4. **Changeover and acceptance.** Find the actual shutdown, temporary hot-water, flushing, testing and commissioning requirements, if any. Price only the obligations in the documents or a clearly identified assumption; the notice itself does not establish an outage window.
5. **Equipment and access.** Check schedules, dimensions, rigging routes and site information for each hall. Raise a question if access or removal assumptions cannot be verified; do not invent a restriction.

For example, an abatement quote might include removal of identified material but exclude survey or preparation of drawings. Compare that exclusion to the issued contract before carrying the price. The example is a leveling exercise, not a statement that this project's quotes or site conditions have those exclusions.

## Qualification and bid-day questions

The ad notice calls for the bidder or its principals to have at least five years of similar experience and to list five similarly sized, scoped and complex contracts completed or substantially completed within the last ten years; additional experience may be required for complex technical specifications. It refers bidders to the contract documents for security, insurance and vendor responsibility details. Review the actual forms and applicable conditions before relying on a qualification. [Source: DASNY](https://www.dasny.org/opportunities/rfps-bids/2026/cuny-queens-college-hot-water-storage-tank-replacement-and-asbestos).

Before submitting, resolve: Does the prime meet the notice's set-aside and minimum qualifications? Which addenda and bid date control? Who performs the asbestos survey and any resulting design? What are the removal and restoration limits at each hall? What temporary service and acceptance tests are specified? Log each answer with the document reference and affected quote. The [NYC public bid review](https://piper-ai.com/resources/nyc-public-construction-bid-review-checklist) provides a broader bid-document checklist, and the NYC public project directory helps locate other packages.

## Organize the tank replacement scope review

After obtaining the issued project documents, a contractor can use Piper's [scope-generation workflow](https://piper-ai.com/use-cases/scope-generation) with documents it supplies. The estimator still needs to reconcile the generated review against the documents, addenda and trade quotes. See [construction scope review](https://piper-ai.com/resources/construction-scope-generation-guide) for a broader approach to package boundaries.