# Build a custom demolition scope and gap register in Piper

1. Separate permission to remove an item from the package responsible for removing it.
2. Track removal, make-safe work, protection and disposition as connected obligations.
3. An addendum review should reopen affected decisions, not silently approve revised scope.
4. Test the register on one difficult interface before making it a company template.

A demolition register should answer two questions separately: **who carries the work, and what must happen before that work can proceed?** For a GC pricing selective demolition in an occupied commercial renovation, a row marked “remove existing equipment” answers neither question completely.

Build the tool around linked obligations: removal limits, make-safe work, protection of retained construction, material disposition, source citations and unresolved bidder answers. Then use Piper to build the register and an addendum-review workflow from a plain-language request. Review the result like any other workspace file before relying on it.

The design choice matters more than the dashboard. A tool that gives every item a trade owner but hides its release conditions can make an incomplete package look ready to issue. The useful register exposes the decision still blocking the scope, even when the removal quantity is settled.

## Give each removal item a boundary and a release condition

Start with one work area, not every demolition obligation on the project. A second-floor mechanical room is a useful pilot because equipment removal can intersect with retained utilities, refrigerant recovery, haul routes and salvage instructions.

Use the demolition scope-of-work guide for the package-writing process; this article concerns the tool that maintains the evidence and decisions behind that package.

For each removal item, request these fields. These are a proposed register design, not names of existing Piper controls:

- **Item and location:** identifiable equipment, assembly or removal limit, with area and phase.
- **Source basis:** drawing sheet, detail or note, specification paragraph and applicable addendum revision.
- **Scope statement:** what comes out, what stays, and where the work stops.
- **Boundary assignments:** who disconnects, removes, protects, stores, transports and disposes.
- **Release condition:** the prerequisite that must be resolved before removal, with its source and responsible party.
- **Open question:** the missing information, the party asked, and the decision it prevents.
- **Bidder treatment:** inclusion, exclusion, qualification, silence or clarification, linked to the proposal or response.
- **Estimate treatment:** included carry, separate package, provisional allowance or unresolved exposure, with a pricing basis.
- **Change record:** the previous basis, changed source, affected linked items and review decision.

Do not let “assigned to mechanical” close the entire row. Assignment to a package is not evidence that the bidder included the work, and a priced inclusion is not evidence that the prerequisite has occurred.

For example, OSHA's current posted demolition standard requires an engineering survey by a competent person before employees start demolition, with written evidence that it was performed. It separately requires service lines to be shut off, capped or otherwise controlled before demolition starts, and retained utilities to be relocated as necessary and protected. These are requirements under [29 CFR 1926.850(a), (c) and (d)](https://www.osha.gov/laws-regs/regulations/standardnumber/1926/1926.850), not instructions assigning the cost to a particular subcontractor.

**The register should distinguish “survey cost assigned” from “survey performed.”** During precon, the first can support a scope decision. The second needs actual evidence later. Never infer completion from an anticipated inspection date or a bidder's promise.

## Use regulatory checks without turning the register into an approval system

The examples here use U.S. federal requirements and an official federal guide specification. Confirm the rules and edited contract documents applicable to the actual project. The register does not determine regulatory applicability or authorize demolition.

Four source interactions are worth building into the pilot.

### Utility control is not the same as removal ownership

OSHA establishes the pre-demolition utility-control requirement. The current public [UFGS 02 41 00 demolition guide](https://www.wbdg.org/FFC/DOD/UFGS/UFGS%2002%2041%2000.pdf), section 1.3.4, contains alternative provisions for government, utility-provider and contractor participation in disconnecting and sealing utilities. The fetched guide is dated August 2022, with references aligned to the October 2026 UMRL. It is a guide requiring project-specific editing, not a universal commercial subcontract requirement.

Read those sources together and the useful decision is clear: the tool needs **both a prerequisite owner and a removal owner**. A demolition bidder can legitimately price physical removal after another party makes the system safe. The gap is not necessarily in that bidder's price. It may be in an unassigned upstream package.

For the pilot, require a separate answer for shutoff, disconnection, cap or seal, retained-service protection and physical removal. Flag contradictory assignments rather than collapsing them into “MEP by others.”

### An abatement exclusion does not resolve the inspection basis

EPA's [Asbestos NESHAP overview](https://www.epa.gov/asbestos/overview-asbestos-national-emission-standards-hazardous-air-pollutants-neshap) explains that institutional, commercial and industrial demolition or renovation operations require a thorough asbestos inspection. Notification requirements differ between demolition and renovation; do not treat every drawing titled “demolition plan” as establishing the regulatory classification.

The tool should hold the inspection report's coverage separately from the demolition bidder's abatement exclusion. If an addendum expands removal into a previously unaddressed room, an unchanged exclusion does not establish that the new work has been inspected or assigned to the abatement package.

Make that a review question: “Does the available inspection cover this revised disturbance area, and what information is still needed?” Do not ask the tool to declare the material asbestos-free from a plan note or photograph. Keep the inspection basis, specialist interpretation and package treatment visible as separate records.

### Equipment disposition changes the upstream obligation

EPA distinguishes equipment typically dismantled on site from equipment entering the waste stream with its refrigerant charge intact. Equipment dismantled on site, including chillers, must have refrigerant recovered under the servicing requirements before disposal. The small-appliance disposal route has different final-disposer verification provisions. See EPA's [stationary refrigeration safe disposal requirements](https://www.epa.gov/section608/stationary-refrigeration-safe-disposal-requirements), updated March 23, 2026.

Consequently, “disconnect and scrap” is not an adequate register design for every piece of refrigeration equipment. Include equipment type, intended disposition, recovery responsibility and the evidence required for that route. Do not apply the small-appliance disposal process indiscriminately to equipment dismantled on site.

This check combines the equipment schedule, the disposal instruction and the regulatory route. Its pricing consequence is a potentially separate recovery obligation, not merely another truckload of metal.

### Salvage creates a receiving obligation, not just a removal note

UFGS 02 41 00, section 1.2.2, calls for coordinating the demolition or deconstruction plan with waste management and tracking removed materials by type, quantity, condition, destination and end use. Its provisions apply through the edited project specification.

Use that interaction to design a disposition chain: detach carefully, prepare for transport, move to storage, protect while stored and hand over to a named receiver. If the project only says “salvage for owner,” the register should expose the missing destination or custody decision. An owner-retained item should not simultaneously remain in the disposal quantity and generate an assumed scrap credit.

These are targeted checks for the tool; the broader demolition scope-gap guide addresses the trade interfaces beyond this pilot.

## Choose between a maintained scope sheet and a project-connected tool

A spreadsheet can hold citations, revisions, decision history and responsibility assignments. The issue is not whether it can contain the fields. It is how the team keeps those fields connected when the project changes.

| Decision | Spreadsheet scope sheet | Custom tool on Piper project data |
| --- | --- | --- |
| Source basis | Team maintains source references and revision links | Built work reads the same drawings, specifications, addenda, scopes and decisions as Piper |
| Trade boundaries | Team records and reconciles separate package assignments | Request linked boundary records and review questions on that project data |
| Bidder clarification | Team connects answers to scope rows and pricing treatment | Request a register connecting proposal treatment, clarification and affected scope |
| New addendum | Team identifies affected rows and initiates review | Configure an automation to review the addendum against affected scope items |
| Approval | Team decides the issued scope and carry | Team still decides the issued scope and carry |
| Reusable structure | Team maintains a workbook template | Add the tested tool and workflow to company project templates |

Piper's public [Build with Piper description](https://www.piper-ai.com/use-cases/construction-app-builder) supports plain-language creation of registers, trackers and change-triggered workflows on shared project data. The demolition-specific fields above are the design to request and test, not a claim that a finished demolition app already exists out of the box.

Build only if the repeated decision warrants it. For a small, stable removal package with one reviewer, a well-maintained sheet may be enough. For phased work with retained services and repeated addenda, test whether connecting the review to the source changes gives the team a more defensible package basis.

## Request the smallest useful demolition register

Use a request that names the decision and constrains the tool's authority. For example:

> Build a selective-demolition scope and gap register for the second-floor mechanical room. Read the current drawings, specifications, addenda, existing-condition reports, demolition and mechanical scopes, subcontractor proposals and clarification responses available in this project. Give each removal item a location, source citations, removal limits, retained-work protection, boundary assignments, prerequisite, disposition and pricing treatment. Separate proposed trade ownership from confirmed bidder inclusion. Keep inspection coverage and make-safe prerequisites separate from scope approval. Where evidence or ownership is unclear, ask rather than guess. When an addendum arrives, review affected items and their linked prerequisites, retained utilities, salvage obligations and bidder clarifications. Present proposed changes and unresolved questions for estimator review. Do not treat proposed scope or a scheduled prerequisite as approved or completed.

This request uses supported Build with Piper capabilities: describe the work in plain language, build registers and trackers, read shared project information, and run work when something changes. Piper asks where a request is unclear; no coding is needed, and the resulting work is reviewed like any other workspace file.

The app can read the same project Piper reads, including bid packages, drawings, specifications, revisions and addenda, quantities from takeoff, scopes, bids and decisions. It does not need a separate export-and-copy process to access that shared information. Do not assume it has a report or clarification that has not been provided.

If a draft trade scope is needed as an input, [Scope Generation](https://www.piper-ai.com/use-cases/scope-generation) organizes project requirements into trade-specific scopes with source references and surfaces unclear responsibilities for review. The separate demolition scope-generation process covers preparing that input.

## Test one addendum through the scope and the number

**Illustrative test fixture, not a customer result or a completed Piper demonstration:** the initial scope calls for removing and disposing of six existing fan-coil units. A later addendum retains two in service and requires two others to be salvaged for owner storage. Only two remain for disposal.

Assume these illustrative pricing inputs:

- Original removal and disposal: six units at $800 each, or $4,800.
- Revised disposal scope: two units at $800 each, or $1,600.
- Careful removal, packing and delivery of two salvage units: two at $1,100 each, or $2,200.
- Temporary protection and service-continuity work for the retained pair: a separately quoted $1,500.

The revised connected scope totals **$1,600 + $2,200 + $1,500 = $5,300**, an increase of $500 from the original $4,800.

A count-only update could reduce the scope to four removals at $800, or $3,200. That misses $600 of additional salvage treatment and all $1,500 of retained-service work: **$2,100 of uncovered scope** relative to the illustrative revised basis.

The lesson is not the arithmetic. The removal count fell, but the connected cost rose because the addendum changed disposition and continuity obligations. Those costs might land in different packages; the register must keep them connected without duplicating them.

Use this fixture to inspect the requested automation. Did the addendum review identify the retained pair as well as the removed pair? Did it challenge the old disposal instruction, the mechanical bidder's clarification and the protection allowance? Did it preserve the earlier basis so the reviewer can explain the movement?

There is a legitimate judgment call over who carries the $1,500 continuity work. Competent estimators might place it in mechanical, temporary services or a GC-managed package. Decide from the actual contract obligations, bidder coverage and control of the temporary system, not from the original demolition row's trade label. One priced owner should carry the work; the other affected packages should retain coordination references.

Do not present these test amounts as market rates or ask the tool to invent missing prices. Replace them with actual quotations or an explicitly identified estimating basis before carry.

## Approve the logic before saving the company template

Review the built result like a workspace file. Trace one ordinary row, one disputed boundary and one changed item back to their sources. Check that the tool distinguishes what the documents require, what the bidder says and what the estimator has decided.

For the pilot, accept the register only if it passes four checks:

1. **Evidence:** every material scope statement has a usable source, or is visibly identified as a proposed assumption.
2. **Coverage:** an exclusion creates a question or a separate priced assignment, not a false closure.
3. **Change:** revised scope reopens affected decisions without treating them as approved.
4. **Carry:** the same obligation is not priced in both the demolition row and its linked mechanical or protection row.

Reviewing generated scope has its own failure modes; use the demolition AI scope-generation pitfalls guide for that separate check.

Piper supports adding working tools and automations to company templates. Save the field structure, review questions and change logic after the pilot works. Do not promote this project's inspection conclusions, salvage destination or subcontractor allocation into defaults for the next job.

The wider custom scope-tool guide covers reusable structure across trades. For demolition, the standard worth preserving is narrower: no removal item should look closed while its prerequisite, disposition or package coverage remains unanswered.

## Questions before building the demolition tool

### Can Piper decide which subcontractor owns a demolition boundary?

Piper can organize clear requirements and surface ambiguous boundaries for review, but the consequential scope decision stays with the team. Request separate proposed ownership, bidder coverage and estimator-decision fields so an inferred assignment is not mistaken for an agreed inclusion.

### Should an addendum automatically revise the issued scope?

Configure the workflow to review affected scope and propose changes, not to treat the revised package as approved. A retained-service or salvage change can affect multiple packages even when the removal count decreases. The estimator should resolve coverage and pricing before approving the new basis.

### Does the register replace the demolition engineering survey or asbestos inspection?

No. It records the evidence, responsible party and unresolved prerequisites; it does not perform or approve those activities. Applicable OSHA and EPA obligations still need their required competent-person or specialist work. A planned date or scope inclusion does not establish that an inspection occurred.

### Do we need code or a separate copy of the project data?

No coding is needed under Build with Piper's public description. Teams describe the register in plain language and review the result like a workspace file. Built work reads the same project information as Piper, and tested tools can become company templates with the workspace's permissions and history.