---
title: 'Build a custom site concrete bid leveling tool in Piper'
url: 'https://piper-ai.com/resources/custom-site-concrete-bid-leveling-app-piper'
description: 'Build a site concrete leveling tool that separates thickness, ramp coverage and trade ownership, then connects adjustments to current project sources.'
contentTypes: [guide]
publishedAt: '2026-11-29T17:48:04.017Z'
author: 'Ido Gedanken, CEO'
readingTime: 11
---

# Build a custom site concrete bid leveling tool in Piper

1. Normalize sidewalk areas by thickness and curb lengths by cross section, not by one blended concrete rate.
2. Keep ramp geometry, ramp pricing and detectable warning coverage as separate questions.
3. An exclusion needs an owner and a treatment before it needs a plug.
4. Automate the comparison draft when bids change, but keep adjustments and carry decisions under estimator review.

For a GC estimator leveling curbs, sidewalks and pads on a hard-bid commercial project, the custom tool should answer three questions before ranking bidders: **Are they pricing the same geometry, the same assembly and the same trade responsibility?** A square-foot conversion alone answers none of them.

Build the calculations and review rules first. Then ask Piper to turn that structure into a project-connected workbook or register. Piper supports plain-language construction app building and bid comparisons against project scope; the proposed site concrete structure below is a tool specification to request and test, not a claim that every rule is already configured. See the public descriptions of [Build with Piper](https://piper-ai.com/use-cases/construction-app-builder) and [Bid Leveling](https://piper-ai.com/use-cases/bid-leveling).

The position this guide takes: **a site concrete leveling tool should reconcile coverage before calculating a comparable number.** Otherwise, a polished total can conceal duplicate ramp concrete, omitted base or pole foundations carried in neither package.

## Define the rows by geometry and assembly, not just material

Start with the issued package scope, civil plans, sections and details. Use the [construction bid leveling guide](https://piper-ai.com/resources/construction-bid-leveling-guide) for the basic process. The custom work here is defining what makes two site concrete prices comparable.

The current public UFGS 32 16 19 PDF carries a May 2018 section date and October 2026 reference reconciliation. Its unit-price provisions separate sidewalks by depth and curbs by cross section. Sidewalk payment is by square yard or square meter; curb measurement follows the face at the gutter line. Those are useful row-design conventions, not universal subcontract payment rules. The guide also says to delete its unit-price provisions for lump-sum work. [Source: UFGS 32 16 19, paragraphs 1.1 through 1.1.2](https://www.wbdg.org/FFC/DOD/UFGS/UFGS%2032%2016%2019.pdf).

Specify these proposed row families:

- **Sidewalk zones:** location, thickness, finish, reinforcement, base requirement and measured area.
- **Curbs and gutters:** profile/detail reference, separate versus combined construction, measurement path and length.
- **Ramps and landings:** location identifier, concrete area, thickness, geometry included in the sidewalk quantity and bidder's pricing basis.
- **Detectable warnings:** location, required footprint, product basis, furnish/install responsibility and whether the ramp price includes them.
- **Pads:** use and detail reference, thickness, reinforcement, thickened edges, embedded items and area.
- **Interface items:** pole foundations, enclosure footings, site walls, base, joints and testing, with package ownership recorded separately.

Do not let “concrete curb” match every curb detail. UFGS 32 16 19 expressly excludes integral or monolithic curbs of concrete pavement from its scope. That distinction gives the tool a useful stop condition: if the project detail shows an integral curb, review the paving assembly before treating its length as a separate addback. [Source: section scope note](https://www.wbdg.org/FFC/DOD/UFGS/UFGS%2032%2016%2019.pdf).

For each row, retain four different facts: project requirement, GC takeoff quantity, bidder quantity and bidder coverage statement. A quantity match is not evidence that reinforcing or base is included. For other errors in the trade comparison, use site concrete bid leveling mistakes.

## Compute a comparable basis without inventing a rate

The tool needs both a raw-bid view and a proposed normalized view. Never overwrite the proposal total with a calculated replacement.

Use these normalization rules as review requirements:

**Convert compatible units, but preserve their meaning.** A price of $90 per square yard equals $10 per square foot. That conversion does not turn a four-inch sidewalk assembly into a six-inch reinforced pad assembly. Keep the original unit, converted unit and assembly description together.

**Split thickness zones before applying rates.** If the bidder gives one blended rate, ask which zones it covers. Do not distribute a lump sum across thicknesses and then treat the resulting allocations as bidder-supported change rates.

**Reconcile ramp area before adding ramp prices.** A ramp may be inside the measured sidewalk polygon while the bidder prices it separately. Record whether the separate price is a complete ramp assembly or only the premium over ordinary sidewalk concrete. An “EA ramp” line without that distinction is unresolved.

**Use rates only within their stated scope.** A sidewalk rate may exclude aggregate base, reinforcing or mobilization. Request confirmation before applying it to additional work.

**Keep accepted alternates outside the base comparison until instructed otherwise.** An alternate changes the selected basis; it is not a deduction simply because it appears on the proposal.

For this article's illustrative comparison, define the proposed comparable amount as:

**Raw bid + reviewed quantity adjustments + reviewed scope addbacks − confirmed deductions.**

Open questions remain visible beside that amount. A zero-dollar entry means “included” only when the proposal or a clarification supports it. Silence should remain “unresolved,” not become a hidden zero.

## Test ramp coverage with both dimensions and pricing language

Ramp counts are useful identifiers, but a count alone is a poor normalization basis for warning panels.

The Access Board's final 2023 public right-of-way guidelines specify a detectable warning depth of at least 24 inches in the direction of travel and, at curb ramps, the full ramp-run width excluding flared sides. Use this as a dimension check where that basis applies, not as a universal requirement for every private commercial sidewalk. The Board's current background page identifies separate adoption actions, including DOT's December 2024 rule for transit stops in the public right-of-way. Confirm the project's applicable standards and contract details before assigning required quantities. [Sources: PROWAG R305.1.4](https://www.access-board.gov/prowag/technical.html) and [adoption background](https://www.access-board.gov/prowag/).

**Illustrative dimension check:** six ramps have five-foot-wide runs and a two-foot warning depth specified in the project details. Warning coverage is 6 × 5 × 2 = **60 SF**. A quote listing “six panels” is still unresolved until the panel dimensions and installation coverage are confirmed.

The useful interaction is between geometry and proposal language. If the bidder includes six ramp assemblies but excludes warning panels, the tool should draft a warning-coverage question, not add six complete ramps. If another bidder includes panels but only supplies them, the open issue is installation ownership, not panel count.

This is the check sequence to request:

1. Identify each ramp and the applicable detail.
2. Determine whether ramp concrete is already in the sidewalk takeoff.
3. Confirm whether the ramp price replaces that area or supplements it.
4. Calculate warning footprint from the applicable dimensions.
5. Check supply and installation separately.

That sequence prevents two different errors from canceling in the total: duplicate concrete and missing warnings.

## Make the exclusion library route decisions, not assign penalties

The exclusion library should be a set of questions and treatment rules. It should not automatically add money whenever it sees “by others.”

For each exclusion, request these fields: exact proposal wording, affected location/row, requirement source, proposed responsible package, coverage evidence in that package, clarification needed, pricing basis, adjustment status and reviewer decision.

Seed it with trade-specific checks:

- **Base course:** distinguish supply, placement, compaction, final trimming and maintenance until placement.
- **Reinforcing:** distinguish material, fabrication, installation and supports for the applicable details.
- **Joint work:** distinguish formed or sawcut joints, filler and sealant.
- **Detectable warnings:** distinguish supply from installation and verify footprint.
- **Pole bases:** distinguish excavation, concrete, reinforcing, anchor bolts/templates, conduits and grounding interfaces.
- **Testing:** distinguish concrete testing from base/subgrade testing and identify the contractual provider.
- **Walls and enclosures:** separate slabs, footings, walls and embedded items rather than matching “dumpster enclosure” to one undifferentiated row.

Two source interactions deserve explicit rules.

First, UFGS 32 16 19 links curb subgrade preparation to other sections, including aggregate base. UFGS 32 11 23, May 2022 with October 2026 reference reconciliation, describes aggregate base measurement by area or in-place volume and includes compaction and field testing. Its guide scope is flexible paving, so do not apply it wholesale under every sidewalk. Read the actual project cross-reference and detail. [Sources: UFGS 32 16 19, paragraph 3.1](https://www.wbdg.org/FFC/DOD/UFGS/UFGS%2032%2016%2019.pdf) and [UFGS 32 11 23, paragraphs 1.1, 3.8 and 3.13](https://www.wbdg.org/FFC/DOD/UFGS/UFGS%2032%2011%2023.pdf).

The resulting tool rule: **a base exclusion is unresolved until both the required assembly and the receiving package's coverage are checked.** “Sitework includes base” is insufficient if its quantity covers only asphalt paving.

Second, exterior-lighting requirements can point outside Division 32. UFGS 26 56 00, August 2021 with October 2026 reference reconciliation, addresses pole foundations and references cast-in-place concrete and underground electrical distribution for concrete requirements. [Source: paragraph 2.6.7](https://www.wbdg.org/FFC/DOD/UFGS/UFGS%2026%2056%2000.pdf).

The resulting tool rule: a pole-base exclusion should open an interface review across electrical and concrete documents. Neither the concrete material nor the electrical section number settles who carries the complete foundation.

For the general treatment process, link the library to [reviewing subcontractor exclusions and qualifications](https://piper-ai.com/resources/review-subcontractor-exclusions-and-qualifications).

## Prove the plug logic with an illustrative comparison

Use a small synthetic fixture before trusting a real package. These quantities, prices and responses are **illustrative**, not market rates or customer results.

The fixture has 10,000 SF of four-inch sidewalk, including 600 SF occupied by six ramp assemblies; 2,000 SF of six-inch pads; and 800 LF of one curb profile. Base is intentionally carried in a verified sitework package. The project details require 60 SF of warnings and 500 LF of joint sealant.

Bidder A submits:

- 10,000 SF sidewalk × $8 = $80,000.
- 2,000 SF pads × $12 = $24,000.
- 800 LF curb × $30 = $24,000.
- Six ramps × $2,000 = $12,000.

The raw bid is **$140,000**. A written clarification confirms that the ramp line is the complete assembly replacing the ordinary sidewalk price for those 600 SF. A also confirms a $4,800 deduction for that duplicated area: 600 × $8.

Warnings are excluded. The estimator reviews a separate supply-and-install quote of 60 SF × $45 = **$2,700**. Required sealant is excluded; the reviewed basis is 500 LF × $6 = **$3,000**.

A's proposed comparable amount becomes:

**$140,000 − $4,800 + $2,700 + $3,000 = $140,900.**

Bidder B submits a $143,500 lump sum and confirms the same geometry, ramps, warnings and sealant, with the same base exclusion. B's proposed comparable amount remains **$143,500**. A is lower by **$2,600**, subject to review of the remaining conditions.

The arithmetic verifies the fixture, but the important decision is the ramp treatment. If A instead confirms that its ramp line is only a premium, the $4,800 deduction disappears. A becomes **$145,700**, or $2,200 above B. The same takeoff and raw proposal can produce a different ranking because pricing intent changed.

Competent estimators may disagree about holding a provisional deduction while awaiting that response. On a hard bid, this guide's recommendation is to show both scenarios and leave the treatment open until confirmed. Do not present an unsupported credit as settled savings.

## Choose the tool's relationship to the project data

A well-maintained spreadsheet can retain formulas, source links and history. The issue is who reconnects those records when a source changes, not whether spreadsheets can do arithmetic.

| Review concern | Spreadsheet maintained on the side | Custom tool on project data |
| --- | --- | --- |
| Quantity basis | Reviewer copies quantities and records their revision | Request use of project takeoff quantities with source and revision context |
| Scope evidence | Reviewer maintains links and coverage notes | Request proposal statements beside the relevant project requirements |
| Adjustment treatment | Formulas calculate approved inputs | Request calculations with unresolved inputs held for review |
| Revised quote | Reviewer reconciles changes and retires obsolete plugs | Request a change-triggered draft comparison and adjustment review |
| Reuse | Workbook becomes a starting template | Reviewed tool can become part of company project templates |
| Carry authority | Estimator chooses the carry | Estimator chooses the carry |

The right choice may still include a workbook. Piper's public app-builder description supports Excel workbooks, registers and change-triggered automations on shared project information. The site concrete rules remain specifications your team must review and test. [Source: Build with Piper](https://piper-ai.com/use-cases/construction-app-builder).

## Request, test and reuse the site concrete tool in Piper

Piper lets teams describe what they need in plain language, then review the resulting file in the workspace. What they build reads the same project information, including drawings, specifications, revisions, addenda, takeoff quantities, scopes, bids and decisions. Reviewed tools can be added to company templates. [Source: Build with Piper](https://piper-ai.com/use-cases/construction-app-builder).

Start with a bounded request:

> Build a site concrete bid leveling workbook and clarification register for this package. Read the subcontractor proposals, issued scope, civil drawings and details, relevant specifications, addenda and takeoff quantities. Separate sidewalks by thickness, curbs by profile, pads by assembly, ramps by location and warnings by footprint. Preserve original bidder units and raw totals. Show project quantity, bidder quantity, coverage evidence, exclusions, proposed adjustments and unresolved questions together. Check whether ramp area is already in sidewalk quantities before proposing an adjustment. Route base, testing and pole-foundation exclusions to a package-ownership review. Keep estimator-approved adjustments separate from drafts. Do not select a bidder or change the carry.

Ask Piper to clarify any ambiguous part of the request rather than accepting a guessed interpretation. Its public description says it asks where a request is unclear. If the generated structure does not implement a requested distinction, revise the request and test again.

Then request a bounded automation:

> When a new or revised site concrete proposal arrives, draft its comparison against the current package basis. For a revision, identify changed price, quantities, inclusions, exclusions and addenda acknowledgments. Recheck affected clarifications and proposed adjustments. Flag a plug for review if the revised proposal now includes the work it was meant to cover. Preserve the prior reasoning for comparison. Leave revised adjustments and the carry for estimator approval.

Piper publicly describes automations triggered by a sub bid or addendum, with one step handing off to the next. Bid Leveling extracts proposal terms, surfaces source-backed gaps and supports adjustments while leaving consequential assumptions and carry decisions to the team. This request uses those capabilities; it is not evidence that the fixture has been run. [Sources: app builder](https://piper-ai.com/use-cases/construction-app-builder) and [bid leveling](https://piper-ai.com/use-cases/bid-leveling).

Review the result like any workspace file. Run the ramp fixture above, then revise A to include warnings. The expected response is a proposed retirement of the $2,700 warning addback, not an extra deduction on top of retiring it. Also test a missing pole-base owner and an addendum changing only one thickness zone. A successful test keeps those issues visible without inventing a complete price.

After review, add the reusable row structure, questions and calculation rules to company templates. Do not copy this project's rates, accepted plugs or ownership decisions as universal defaults. Use the custom bid leveling tool guide for the broader build pattern and the site concrete AI leveling walkthrough for the package review sequence.

## Questions before rolling out the template

### Do we need to write code to build this tool in Piper?

No. Piper supports plain-language requests to build and change workbooks, registers and workflow automations. Define the site concrete rows, calculation rules and review boundaries in the request, then check the result like another workspace file. A clear request is still necessary even though coding is not.

### Should the tool automatically plug every exclusion?

No. First verify that the work is required and not already covered in another package. Then obtain or review a pricing basis. Base course and pole foundations need ownership checks before addbacks; unclear coverage should remain an open question rather than becoming an invented amount.

### Can we normalize every concrete price to square feet?

No. Convert compatible area units, but retain thickness, assembly and coverage. Keep curb prices tied to the applicable cross section and length basis. A calculated allocation of a lump sum is not a bidder-confirmed unit rate and should not be used as one without clarification.

### What should happen when a revised bid includes a previously plugged item?

Request review of the old plug alongside the revised inclusion. If the estimator confirms that the revised price covers the same requirement, retire the plug once. Preserve the earlier basis and decision so the team can explain why the comparable amount changed. The automation should draft that reconciliation, not approve the carry.
