# Dag Hammarskjold Plaza Reconstruction Phase 2: project status and contractor scope review

NYC Parks describes phase 2 reconstruction at Dag Hammarskjold Plaza at East 47th Street between 1st and 2nd Avenues, Manhattan. Tracker ID 10600, FMS 846 P-306DAGP, was in **procurement** in the record last updated November 13, 2026. For a GC, the pursuit decision depends on the actual issued scope and whether a solicitation is available, not the tracker phase alone. [NYC Parks tracker record](https://data.cityofnewyork.us/resource/4hcv-tc5r.json?trackerid=10600).

## Recorded project status

The record reports design 100% complete, procurement 60% complete and construction 0% complete. These are separate phase measures. Project funding is recorded as between $3 million and $5 million; that is a funding band, not a bid price or contract award. Design actually completed October 1, 2024; the original design projection was October 1, 2024. Procurement began April 1, 2026 and its recorded projected completion was April 1, 2027. [Source: NYC Parks tracker](https://data.cityofnewyork.us/resource/4hcv-tc5r.json?trackerid=10600); see also the [dataset and data dictionary](https://data.cityofnewyork.us/Recreation/Capital-Project-Tracker/4hcv-tc5r).

## Pavement, furnishings and tree grates

The City’s April 2023 capital-project detail describes pavement, site furnishings and replacement of broken tree grates for this phase. Compare those historical scope elements against the current issued drawings: which pavement limits and furnishings are included, and which grates are to be replaced? The old description is context, not proof of the final contract scope. [April 2023 City project detail](https://www.nyc.gov/assets/omb/downloads/pdf/cpd5-23mn.pdf).

This is an estimating review question, not a statement that any particular item is required. Obtain the drawings, specifications and addenda before assigning scope or settling a bid/no-bid decision. Use the [NYC public bid review](https://piper-ai.com/resources/nyc-public-construction-bid-review-checklist) to record unanswered questions and the responsible reviewer.

## Check the current procurement documents

Search the City's [Procurement Navigator](https://www.nyc.gov/site/mocs/passport/articles/find-opportunities.page) using the project name and identifiers, and confirm any match with the issuing agency. The City says public opportunities can be searched without a PASSPort account. Check the current solicitation, status, due date and all addenda directly; the tracker snapshot does not establish an open bid. The NYC public project directory provides context for other named packages.

## Compare the plaza package with the earlier plan

Once the team has the project documents, [Piper's scope-generation workflow](https://piper-ai.com/use-cases/scope-generation) can support a document-based scope review. Compare the resulting scope with the issued documents and subcontractor qualifications; resolve open boundaries before carrying a price. See the [construction scope review guide](https://piper-ai.com/resources/construction-scope-generation-guide).

*Research checked November 15, 2026. This is independent Piper analysis, not an NYC Parks notice or agency affiliation.*