---
title: 'Edwards Aquifer construction: connect plan approval and sensitive-feature risk'
url: 'https://piper-ai.com/resources/edwards-aquifer-construction-protection-scope'
description: 'Keep approved Edwards Aquifer protection measures in priced scope and define the separate response and uncertainty if a sensitive feature is found.'
contentTypes: [guide]
publishedAt: '2026-11-27T19:11:22.490Z'
author: 'Ido Gedanken, CEO'
readingTime: 2
---

# Edwards Aquifer construction: connect plan approval and sensitive-feature risk

For work near the Edwards Aquifer, begin with the actual parcel and regulated-zone map, not the city name. TCEQ regulates specified areas and activities, and the applicable protection plan and approval depend on the location and work. Its [program overview](https://www.tceq.texas.gov/permitting/eapp) links to the official maps and plan requirements. Do not apply one zone's requirements to every Central Texas site.

## Connect the map to the construction package

Have the civil designer document the parcel boundary, zone, applicable plan type, approval and revision. Compare the approved protection measures with the grading, utility and temporary works packages. If approval is pending, record who owns the submission and what mobilization assumption depends on it. Price controls in the approved design separately from uncertain discovery response.

| Register item | Evidence or responsible party | Carry or open question |
| --- | --- | --- |
| Zone and map | Designer's parcel overlay and TCEQ map | Verify boundary and regulated activity |
| Approved plan | Approval letter and current plan | Price specified temporary protection |
| Field measures | Civil contractor and superintendent | Install, maintain and inspect as required |
| Discovery | Stop-work and notification contact | Preserve access to qualified evaluator |
| Uncertainty | Owner-approved contingency basis | Record exposure and avoid double counting |

## Plan the discovery response

TCEQ says that when a sensitive feature is discovered during construction, regulated activities nearby must be suspended and TCEQ notified. Temporary protection is needed; a Texas-licensed professional geologist evaluates the feature, and a licensed engineer is contacted if a sewer line is to be installed in the area. Construction and soil disturbance cannot resume until TCEQ approves the proposed protection methods. See [TCEQ's discovery instructions](https://www.tceq.texas.gov/permitting/eapp/sensitive-features-encountered-during-construction).

Illustrative example: excavation exposes a suspected opening. The superintendent stops nearby regulated activity, protects the opening from runoff and equipment, and contacts the designated project lead. The team records the location and follows the agency's direction before restarting. This scenario does not suggest a feature exists on any particular parcel.

Carry specified controls as scope and define the owner, use and potential overlap of any discovery contingency. The [allowance and contingency review](https://piper-ai.com/resources/construction-contingency-allowances-estimate-review) helps keep those two decisions distinct.

Requirements described here reflect the linked agency guidance or statute checked November 17, 2026. Confirm current rules and project-specific conditions before relying on the estimate.
