# Fidelis Way: separate the access ramp from court and splash-pad proposals

Price the Pamela Donovan Road ramp as a concept item while separating it from sport-court reconstruction and a splash pad. The February 2026 final concept retained terraced seating beside the courts but expressly omitted work on the courts themselves.

The following register is an estimator's interpretation of the cited public records, not a contract scope or a substitute for the current procurement documents.

## Separate the ramp and seating from omitted amenities

| Work or location | Public record | Estimator's review |
| --- | --- | --- |
| Accessible ramp | Retained in final concept near Pamela Donovan Road | Confirm alignment, grading, structures and limits in issued documents. |
| Terraced seating | Retained beside the courts | Separate seating and adjacent paving from court surfacing. |
| Court improvements | Excluded from the final concept | Do not assume a court resurfacing allowance without new evidence. |
| Splash pad and dog amenity | Excluded from final concept | Remove earlier option carries or clearly label them alternatives. |
| Street signage | Warren Street location may be outside project | Verify ownership and limits before including. |

## Use the final concept to question broader page language

The City’s general project page uses broader water-play and court language than the February meeting record. Keep both dates in the change register and ask which issued documents control; a public concept can change before procurement.

The notes say a prior feasibility study informed the ramp location, that a hospital donation partly funds it, and that Public Works would maintain it. Those statements do not establish a separate hospital construction package or an executed maintenance agreement.

The primary records are [Fidelis Way Park Improvements official City project page](https://www.boston.gov/departments/parks-and-recreation/project/fidelis-way-park-improvements) [Fidelis Way Park Community Meeting #3 Meeting Minutes (February 2, 2026)](https://www.boston.gov/sites/default/files/file/2026/02/Fidelis-Way_Meeting3-notes_2026-02-02.pdf).

## Resolve ramp access, maintenance and road handoffs

For the ramp handover, request the issued survey and design, interfaces with road and park work, temporary access plan, inspection requirements and maintenance responsibilities. Record unresolved grades, structural support and cost allocation as questions rather than inferred quantities or approved accessibility details.

Before relying on a public presentation, trace the official Boston project record and [check the controlling issued revision](https://piper-ai.com/resources/construction-addenda-management-for-gc-estimators).