---
title: 'Frisch Field Reconstruction: project status and contractor scope review'
url: 'https://piper-ai.com/resources/frisch-field-reconstruction-parks-9587-contractor-guide'
description: 'Frisch Field Reconstruction includes a natural turf field, grading and drainage. Check the limits and connections in the issued documents before pricing.'
contentTypes: [guide]
publishedAt: '2026-11-19T17:25:12.915Z'
updatedAt: '2026-11-19T17:25:12.980Z'
author: 'Ido Gedanken, CEO'
readingTime: 2
---

# Frisch Field Reconstruction: project status and contractor scope review

This project will reconstruct the natural turf baseball field at Frisch Field, including grading, drainage, benches, fencing, dugouts, sidewalks, pathways, drinking fountains and bottle fillers. The [NYC Parks tracker record](https://data.cityofnewyork.us/resource/4hcv-tc5r.json?trackerid=9587) identifies tracker **9587**, FMS **846 P-111FFBB**, at Mosholu Parkway and Webster Avenue, Bronx. The recorded phase is **procurement**. The dataset row was last updated November 13, 2026 and this research was checked November 15, 2026. The practical decision is whether the issued scope and current procurement documents justify a pursuit, not whether the tracker phase implies a live bid.

## Recorded project status

The tracker reports design 100% complete, procurement 85% complete and construction 0% complete. These percentages describe separate phases. Project funding is **between $5 million and $10 million**, with source listed as City Council; this is funding, not a bid price or award.

The row records design start: February 1, 2021; original projected design completion: February 1, 2022; adjusted design completion: October 1, 2024; actual design completion: December 1, 2024; procurement start: February 1, 2026; projected procurement completion: February 1, 2027; recorded construction start: December 1, 2026; projected construction completion: November 1, 2027. Projected and adjusted dates are forecasts, not evidence that a milestone occurred. Any construction start shown in a procurement-phase record is a scheduled field, not confirmation that work began. A past forecast is not a current deadline or proof of completion; where it has elapsed, the current schedule is unknown. The [dataset and data dictionary](https://data.cityofnewyork.us/Recreation/Capital-Project-Tracker/4hcv-tc5r) provide the context for the tracker fields.

## Field, grading and drainage limits

The record identifies grading and drainage alongside the natural turf field, dugouts, fencing, paths and drinking facilities. Trace the grading and drainage limits against the field and paths, then check where drinking-facility connections and dugout work start and stop. The tracker does not specify quantities or system designs.

## Check the current procurement documents

Use the tracker to identify the project, then obtain the controlling solicitation, drawings, specifications and addenda from the agency. Verify the current status, eligibility and deadlines before assigning bid resources. The tracker does not itself establish an open solicitation or a contractor award. The [NYC public bid review](https://piper-ai.com/resources/nyc-public-construction-bid-review-checklist) helps record those decisions, and the project directory places this guide among other named projects.

## Review the field and drainage scope

With the actual documents in hand, Piper's [scope-generation workflow](https://piper-ai.com/use-cases/scope-generation) supports a document-based review. See also the [construction scope review guide](https://piper-ai.com/resources/construction-scope-generation-guide). This is independent Piper analysis, not an NYC Parks notice or affiliation. Research checked November 15, 2026.
