# Hansborough Recreation Center: pool restoration and accessibility need separate handoffs

At Hansborough, price the pool, entrance and interior handoffs separately, then check the boundary with the separately described boiler and HVAC project. A single recreation-center allowance can conceal both duplicate plant work and an unowned restart or finish repair.

[Parks tracker 6326](https://data.cityofnewyork.us/resource/4hcv-tc5r.json?$where=trackerid%3D%276326%27) describes reconstruction of the pool, entrance and interior spaces and lists construction in its November 13, 2026 update. [September 2022 Community Board 10 minutes](https://cbmanhattan.cityofnewyork.us/cb10/wp-content/uploads/sites/11/2020/03/PARKS-AND-RECREATION-COMMITTEE-MINUTES_For-Letterhead-September-14th_-2022-1.docx-1.pdf) historically described additional interior and access work and distinguished boiler/HVAC repairs as another capital project. Historical schedules do not establish a reopening date.

## Map acceptance across the pool and interiors

The following is an estimator's proposed review, not an issued acceptance procedure.

| Area | Boundary to test | Evidence to request |
| --- | --- | --- |
| Pool | Pool work versus plant isolation and restart | Pool drawings, plant responsibilities and test requirements |
| Entrance and lobby | Accessible route, thresholds and finishes | Issued entry details and accessibility plans |
| Interior access | Work at upper-floor access and affected spaces | Current room-by-room scope and access details |
| Finishes | Repairs after systems and access work | Finish schedule and protection limits |
| Boiler and HVAC | Separate project interface and outage ownership | Both project scopes, schedules and tie-in plan |

The 2022 meeting record is useful for identifying questions, but it cannot substitute for current issued details. Ask whether historical items remain in the current work before carrying them. Do not assume that the same contractor owns the separate plant project.

## Build a wet-test and handover sequence

In an illustrative estimate, identify the party providing water and power for pool testing, the party witnessing and recording the test, and who repairs finishes disturbed by correction. Match that sequence to access work and any separate plant outage. Where the documents do not settle a handoff, record a qualification and request a coordinated response.

Confirm the applicable accessibility design from the issued plans and the actual authority review. An accessible entrance in a historical description does not identify the final route, dimension or acceptance standard.

For the broader package review, use the [MEP coordination review](https://piper-ai.com/resources/mep-coordination-preconstruction-scope) and the [phasing estimate review](https://piper-ai.com/resources/preconstruction-phasing-estimate-review).