# Harrison Ink Block: trace interim median, signals and final surfaces

Track the temporary asphalt after median demolition as an interim condition, then separately track islands, remaining signals and final surfaces. The September 2026 presentation is a dated snapshot, not a current completion count.

The following register is an estimator's interpretation of the cited public records, not a contract scope or a substitute for the current procurement documents.

## Track temporary median, islands and final surfaces separately

| Work or location | Public record | Estimator's review |
| --- | --- | --- |
| Median | Demolished and temporarily asphalted in September report | Confirm remaining light posts and raised catch basin removals. |
| Signals | Three of five new mast arms reported installed | Verify current inventory and remaining foundations and connections. |
| Roadway | Excavation and initial repaving forecast | Coordinate sections with access and later island work. |
| Crossing islands | Forecast after initial repaving | Identify layout, curbs, paving tie-ins and traffic staging. |
| Final surface and markings | Top layer and weather-dependent striping listed separately | Track final placement and acceptance independently. |

## Read September counts as a dated construction snapshot

The September 16 owner report also recorded 17 reconstructed ramps and updated meters. It forecast remaining mast arms and islands in October or November, and said final striping might move to spring 2027 because of weather. These counts and dates should not be treated as present-day progress.

The City said residence and business access would be maintained and described weekday working hours. Those are owner-stated constraints in the presentation; they do not establish the contractor’s detailed means and methods. An end-of-2026 substantial-completion forecast and a 2027 hub completion expectation describe different statements, not verified acceptance.

The primary records are [September 16, 2026 Washington Harrison Neighborhood Association Presentation official primary document](https://www.boston.gov/sites/default/files/file/2026/09/2026-0916%20Harrison%20Avenue%20%28Ink%20Block%29%20Construction%20Update.pdf) [Harrison Avenue Reconstruction (Ink Block) live official body](https://www.boston.gov/departments/streets-cabinet/project/harrison-avenue-reconstruction-ink-block).

## Request current signal cutover, staging and payment quantities

Use a section register with existing condition, access route, initial pavement, island, signal, final asphalt and striping columns. Request current updates, issued staging, signal cutover and inspection requirements, and payment quantities before forecasting remaining work.

Before relying on a public presentation, trace the official Boston project record and [check the controlling issued revision](https://piper-ai.com/resources/construction-addenda-management-for-gc-estimators).