# Homecrest Cloudburst project: porous streets and underground storage interfaces

The Homecrest Cloudburst announcement supports a planning estimate for street capture and possible underground storage, not a takeoff of fixed tank sites. The preconstruction decision is whether the available design identifies a complete path from porous pavement through a connection to storage and restoration. If it does not, keep the missing quantities and site decisions visible.

On April 30, 2026, the [city announced $95 million in DEP funding](https://www.nyc.gov/mayors-office/news/2026/04/mayor-mamdani-announces--95-million-cloudburst-project-to-manage) for a project targeting a 350-acre Homecrest area including Kings Highway, Coney Island Avenue and avenues P, R, S, T, U and V. Planned methods include porous street pavement and underground storage on public land. Traffic triangles, courts, schoolyards and parking lots were being evaluated. The funding announcement is not a construction award, and those categories are not a list of final tank locations.

## Convert site selection into an estimating register

Use the following as a decision register, not a list of confirmed work. Price only the alternatives supported by the current assignment and disclose the basis.

| Decision | Evidence to request | Estimate affected |
| --- | --- | --- |
| Street capture | Drainage map, pavement limits, sections and subsurface investigation | Removal, porous surface, base, excavation and traffic arrangements |
| Storage site selection | Selected public parcel, footprint, access and existing utilities | Excavation, storage structure, protection and site constraints |
| Capture-to-storage connection | Pipe alignment, invert elevations, crossings and connection details | Pipe, structures, utility conflicts and tie-in work |
| Surface restoration | Existing-use survey and proposed finished surface for the selected parcel | Pavement, landscape or recreation reinstatement and maintenance |
| Operating handoff | Access points, inspection and maintenance responsibilities in issued documents | Access features, testing and turnover documentation |

If the selected site moves from a traffic triangle to a schoolyard, do not merely swap the surface area in the estimate. Revisit the connecting alignment, construction access, protection and restoration limits. No location or sequence is assumed here. The [plumbing underground scope boundary](https://piper-ai.com/resources/plumbing-underground-scope-boundary) provides a useful method for assigning connections where two drawing disciplines meet.

## Reconcile estimates when the design matures

Request the current design and drainage boundary, site-selection record, utility investigations, sections and procurement documents. Compare the street and storage scopes line by line, including temporary work and reinstatement. A design assumption can be carried as a named alternative, but should not be presented as an agency-selected solution.

The city's announcement includes an estimate of annual stormwater managed, which is a forecast rather than measured post-construction performance. It does not establish a start date or contract quantities. Use the [NYC public bid review checklist](https://piper-ai.com/resources/nyc-public-construction-bid-review-checklist) to distinguish a public funding announcement from documents that actually govern a bid.

The [Brownsville South hub review](https://piper-ai.com/resources/brownsville-south-cloudburst-hub-preconstruction) works from a different evidence stage: its April 2026 presentation names three potential public sites and a planned design submission. Homecrest's announced neighborhood and site categories should remain provisional until its own current design selects locations. Neither project supplies quantities for the other.