---
title: 'How to write an HVAC and ductwork scope subs will price on the same basis'
url: 'https://piper-ai.com/resources/hvac-scope-of-work'
description: 'Write HVAC bid scopes around equipment, controls, testing and handoffs, with a reusable outline that gives every bidder the same pricing and acceptance basis.'
contentTypes: [guide]
publishedAt: '2026-11-29T12:31:13.263Z'
author: 'Ido Gedanken, CEO'
readingTime: 11
---

# How to write an HVAC and ductwork scope subs will price on the same basis

1. Define the installed system and its acceptance work, not just Division 23.
2. Separate furnishing, installation, connection and verification at each trade boundary.
3. Excluding a specialist does not exclude the mechanical support that specialist needs.
4. Price alternates against the complete system, including changed interfaces.

On a commercial office project approaching bid-ready CDs, the GC should write the HVAC scope around **what must be installed, connected and demonstrated**, not around a blanket instruction to include Division 23. Give every bidder the same equipment basis, system limits, trade handoffs and acceptance obligations. Then ask for deviations separately.

The objective is not identical prices. It is identical pricing responsibility. A mechanical bidder can legitimately use different fabrication methods or suppliers. It should not quietly price a different controls boundary, omit support for test and balance, or assume another package carries the roof curbs.

This guide is for GC estimators and preconstruction managers assembling a mechanical subcontract or solicitation package. It is not a design specification or a substitute for contract review. For a DD GMP, identify unresolved design explicitly. For design-build or delegated design, add the actual design responsibility and performance basis rather than treating this outline as a complete design obligation.

## Fix the document basis before writing inclusions

Build a short source register before drafting scope language. For HVAC, use equipment tags and system IDs as the bridge between sources. That lets a bidder trace an AHU from its schedule through its duct system, piping connections, controls sequence and testing obligations.

Include:

- Mechanical plans, sections, details, equipment schedules, legends and sequences of operation, with issue dates and revisions.
- Applicable specification sections, identified by both number and title.
- Architectural roof, louver, reflected ceiling and access details; structural equipment support details; electrical equipment connections; and plumbing drain connections where relevant.
- Division 01 requirements for submittals, coordination, access, work periods, commissioning, training and closeout.
- Issued addenda and incorporated prebid responses, including the documents each response changes.
- Owner requirements and existing-system information expressly included in the package basis.

Use the project's actual section names. The official UFGS library illustrates why one section is not enough: its February 2025 HVAC Air Distribution guide includes equipment, ducts, louvers and condensate work, while insulation, TAB and controls also have separate guide sections. Its system-description clause requires offsets, fittings and accessories for a complete installation. These are useful examples of document interaction, not requirements imposed on every commercial project. [UFGS 23 30 00, February 2025](https://www.wbdg.org/FFC/DOD/UFGS/UFGS%2023%2030%2000.pdf).

Do not write a new order of precedence into the scope sheet casually. If a roof detail and equipment schedule disagree, identify the conflict and obtain the applicable clarification. A bidder instruction to price a stated temporary basis should remain visibly different from a design resolution.

For the cross-trade method, use the [construction scope generation guide](https://piper-ai.com/resources/construction-scope-generation-guide). Here, the HVAC-specific task is to turn that document basis into system-level pricing responsibility.

## Define the mechanical package by system and completion state

Start with a positive scope statement: which systems, areas and phases the mechanical subcontractor carries, and what completion means for each. Avoid letting an exclusions list become the only definition of the package.

### Equipment and associated piping

List the equipment tags covered by the bid. For each type, identify furnishing and installation responsibility, scheduled accessories, factory controls, field connections, supports, vibration isolation, rigging, startup and warranty obligations.

Where included, name hydronic and refrigerant piping, valves, specialties, drains, testing, flushing and treatment. Do not describe all piping as mechanical without identifying its service and endpoints. For condensate, state the boundary from equipment drain outlet through the required trap, pipe, insulation if applicable, and final connection or termination. Name the receiving plumbing work separately.

This is not merely a drafting preference. The current air-distribution guide has separate provisions for refrigerant piping, condensate drain lines, insulation and controls. A reference to the air handler alone does not explain how the GC intends to allocate those connected obligations. [UFGS 23 30 00, paragraphs 2.17 and 3.2.1](https://www.wbdg.org/FFC/DOD/UFGS/UFGS%2023%2030%2000.pdf).

### Ductwork and air-distribution components

Identify supply, return, outdoor air, relief and exhaust systems within the package. Reference the actual duct material, pressure classification, seal requirements and testing schedule rather than selecting one generic requirement for the whole building.

Spell out fittings and offsets, hangers and supports, flexible connections, terminals, grilles, registers, diffusers, balancing devices, access doors and specified dampers. Identify exposed finish requirements and special exhaust systems separately. Include the coordination and shop-drawing deliverables needed to fabricate the work.

The official air-distribution guide treats duct access doors, fire and smoke dampers, balancing dampers, acoustic treatment and air outlets as distinct components. Use that distinction to check whether your package language covers the accessories, not just the drawn duct runs. Do not copy every guide item into a project that does not contain it. [UFGS 23 30 00, paragraph 2.12](https://www.wbdg.org/FFC/DOD/UFGS/UFGS%2023%2030%2000.pdf).

### Insulation and acoustic treatment

State whether field-applied duct, pipe and equipment insulation is included in the mechanical price or bought separately. Reference the service-specific insulation schedule, thickness, jacket, vapor-control treatment and exterior finish. Identify internal lining and factory-insulated assemblies separately so bidders do not apply the same allowance to every surface.

UFGS 23 07 00, August 2024, distinguishes field-applied insulation from factory-applied insulation specified with the equipment, piping or duct. It also tells the designer to show locations where ductwork is internally insulated. That is a useful reason to reconcile insulation specifications with duct details before issuing the package. [UFGS 23 07 00, paragraph 1.2.1 and drawing notes](https://www.wbdg.org/FFC/DOD/UFGS/UFGS%2023%2007%2000.pdf).

The scope-writing decision is to identify the treatment and its owner. It is not to make the estimator resolve an unclear thermal or acoustic design.

## Replace “by others” with a handoff that can be priced

For each boundary, separate four actions: **furnish, install, connect and verify**. Add an endpoint and the prerequisite information the receiving trade needs.

The following is a proposed allocation exercise, not a universal trade split. Populate it from the actual project and issue matching language to the affected packages.

| Interface | What the HVAC scope must resolve | Matching obligation in the other package |
| --- | --- | --- |
| BAS and controls | Factory devices, field devices, mounting, wiring, programming, integration and test support | Controls package names devices and connections it receives and completes |
| Equipment power | Motors, drives, disconnect furnishing, field power termination and control power boundary | Electrical package identifies feeds, disconnect installation and final connections |
| TAB | Specialist procurement, systems tested, reports, test ports and mechanical or controls support | Separate TAB package states field work and readiness requirements |
| Insulation | Factory insulation, lining, field insulation and post-test repairs | Separate insulation package names systems and required return work |
| Roof curbs and supports | Curb selection, furnishing, setting, rigging and equipment attachment | Structure and roofing packages identify support, opening and weatherproofing work |
| Louvers | Furnishing, setting, duct transition, damper connection and perimeter sealing | Envelope package identifies opening preparation and perimeter treatment |
| Condensate | Equipment outlet, trap, route and final termination or connection | Plumbing package identifies receiving drain and connection responsibility |
| Commissioning | Checklists, startup evidence, technicians, access, testing assistance and corrections | Commissioning package identifies verification role and required participation |

Controls deserve more than a yes-or-no inclusion. The November 2026 UFGS control-device guide covers instrumentation and devices but explicitly excludes controllers, network devices and networking specified elsewhere. Thus, even “include controls per 23 09 13” can describe hardware without the complete control system. [UFGS 23 09 13, paragraph 1.1](https://www.wbdg.org/FFC/DOD/UFGS/UFGS%2023%2009%2013.pdf).

Your decision rule should be: read the equipment schedule, controls sequence and device/network specifications together, then assign each action. If one terminal unit has factory controls and another requires field controls, preserve that distinction by tag or type.

Competent estimators may choose different procurement structures. A GC may buy BAS directly to retain an owner-required specialist, or put it under the mechanical subcontract to consolidate responsibility. Let the owner requirements, qualified bidder availability and ability to manage integrated acceptance decide. Neither choice eliminates mechanical installation and testing support.

The broader allocation method belongs in [MEP coordination scope review](https://piper-ai.com/resources/mep-coordination-preconstruction-scope). For a separate diagnostic review of unresolved boundaries, see HVAC scope gaps.

## Write testing as work, not as one closeout line

Separate duct air leakage testing, TAB, equipment startup, controls verification and commissioning participation in the scope. Identify the responsible party, prerequisites, reports, attendance and applicable return visits for each.

The May 2025 UFGS TAB guide requires technical support personnel, including controls technicians or factory representatives, to enable testing. Its duct leakage testing prerequisites require accessible ductwork that is neither concealed nor insulated. The August 2024 insulation guide then requires repair of insulation and jackets after TAB, with identification of test ports. [UFGS 23 05 93, paragraphs 1.3.1 and 3.1.2](https://www.wbdg.org/FFC/DOD/UFGS/UFGS%2023%2005%2093.pdf); [UFGS 23 07 00, paragraph 3.3.6](https://www.wbdg.org/FFC/DOD/UFGS/UFGS%2023%2007%2000.pdf).

Read together, those provisions create two different handoffs: release ductwork for initial insulation after the applicable leakage test, then repair insulation disturbed by subsequent balance work. A scope saying “insulation complete before testing” collapses those events into the wrong sequence.

For a project using that basis, write the package obligations around the sequence:

1. Mechanical identifies completed duct sections and provides access, test connections and required support.
2. The designated testing party performs leakage testing before those sections are insulated or concealed.
3. Insulation proceeds after the applicable release.
4. Mechanical and controls provide the operating system and attendance required for TAB.
5. The assigned insulation party restores disturbed insulation and identifies test ports.

Likewise, an owner-retained commissioning provider does not make the mechanical subcontract's participation zero. The mechanical commissioning guide, May 2023 with Change 1 of August 2024, calls for accessible systems, inspection assistance, readiness documentation and participation by mechanical, electrical, controls and TAB representatives. Its readiness certificate includes startup, TAB and controls records. [UFGS 23 08 00, paragraphs 1.3 and 1.6](https://www.wbdg.org/FFC/DOD/UFGS/UFGS%2023%2008%2000.pdf).

The failure to catch is a scope that purchases the independent report but not the labor needed to produce a testable system. Check acceptance prerequisites against package inclusions before asking for a final price.

## An illustrative price shows why the handoff matters

Assume a commercial office bid package with two air handlers and 24 VAV terminals. These quantities, prices and labor rates are **illustrative**, not market benchmarks or customer results.

Bidder A quotes $486,000 for mechanical installation, including factory controls, but excludes field BAS, independent TAB, field insulation and commissioning-provider fees. The GC plans to procure those specialists separately.

The scope review produces these illustrative separate-package prices:

- Field BAS and integration: $38,400.
- Independent TAB: $7,200.
- Field insulation: $21,600, including the specified post-TAB repairs.

The comparable system cost is initially:

**$486,000 + $38,400 + $7,200 + $21,600 = $553,200.**

Now compare the TAB and commissioning support requirements with the quote. Factory startup is included, but mechanical attendance for balance and functional testing is not. The controls quote includes its own attendance; the mechanical bid does not.

For this illustrative package, the GC requests a priced mechanical add-back of 40 technician-hours at $115 per hour:

**40 × $115 = $4,600.**

The supported system cost becomes **$557,800**, excluding the separately carried commissioning-provider fee in both comparisons. Bidder B offers the same defined mechanical, BAS, TAB, insulation and support scope for $556,000. A was $70,000 lower on the raw quote but is $1,800 higher on the same system basis.

The arithmetic is not the insight. The decision changed because specialist procurement and installation support are separate obligations. Buying TAB and commissioning oversight elsewhere did not purchase A's attendance. Nor should the GC add insulation repair twice when the separate insulation price already includes it.

For the full quote-review process, use the existing [HVAC bid-leveling review](https://piper-ai.com/resources/hvac-scope-gaps-and-double-ups-bid-leveling). In the scope sheet, convert these adjustments into issued inclusions so the next bidder does not reconstruct them independently.

## Reusable HVAC bid scope outline

Use the following as a drafting artifact. Replace every placeholder with project-specific language. It is an outline, not a ready-to-sign subcontract exhibit.

### A. General and document basis

- Package name, project areas, phases and systems included.
- Drawing and specification register, revisions, addenda and incorporated clarifications.
- Base equipment and system basis, with a tag list or referenced schedule.
- Applicable permits, fees, inspections and procurement responsibility.
- Access, work periods, rigging assumptions, storage, protection and temporary service obligations.
- Submittals, coordination drawings, field verification and any expressly assigned design deliverables.

### B. Positive inclusions

- Equipment furnishing, installation, scheduled accessories and supports.
- Duct systems, fittings, dampers, terminals, outlets, access provisions and specified acoustic treatment.
- Included piping services, specialties, testing, cleaning and final connections.
- Insulation and jacket treatments by service and location.
- Controls responsibilities by device, connection and system layer.
- Roof curbs, louvers, openings and penetration work as expressly allocated.
- Leakage testing, TAB, startup, commissioning assistance, reports and training.
- Record documents, O&M material, spares and warranty requirements from the project basis.

### C. Exclusions and work by others

For each permitted exclusion, state the excluded action, receiving package, physical endpoint and retained coordination obligation. “Power by electrical” should identify what mechanical still furnishes and what electrical installs and connects. “Commissioning by owner” should preserve required subcontractor participation.

### D. Clarifications and bidder response

Require bidders to return a separate deviations schedule keyed to scope item numbers. Ask them to identify equipment substitutions, qualifications, unresolved existing conditions and deviations from the issued testing or access basis. Do not accept a bare “per plans and specs” as the only response to the boundary schedule.

Keep a GC-issued pricing assumption visibly open until the design or contract basis resolves it. Ask for a priced clarification where possible; do not quietly turn a bidder's assumption into the common base.

### E. Alternates and allowances

State the base first. For each alternate, identify changed equipment tags and associated duct, piping, controls, electrical, support and acceptance work. Require an add or deduct from that base, not an unexplained replacement total.

Use an allowance only for named unresolved work with a stated basis and reconciliation treatment. Do not use a controls allowance to conceal a missing integration definition.

### F. Unit prices

Define the assembly, unit, measurement basis and included work. A proposed terminal-unit price should identify type, capacity basis, controls, reheat, connections and applicable test work. A proposed duct price should identify material, size or size band, classification, insulation treatment and whether fittings and supports are included.

Specify where the unit price applies and which fixed costs remain separate. A price for adding one outlet is not automatically a price for extending a complete new branch system.

### G. Release and buyout check

Before issue, read the exclusions and by-others clauses in the corresponding controls, electrical, insulation, TAB, roofing and plumbing packages. Confirm that each receiving obligation exists in positive language. Then check that the HVAC base, alternates and unit prices use the same assumptions.

At buyout, preserve that basis and resolve accepted deviations rather than starting with a fresh generic exhibit. The bid scope sheet versus subcontract exhibit guide addresses that handoff.

## Keep the HVAC scope connected to its project basis

A reusable outline helps only if its items remain attached to the current project. A changed VAV selection may affect a device assignment, power connection and acceptance obligation without changing the duct plan visibly. Keep those relationships in the scope review rather than relying on a reviewer to remember them.

[Piper's Scope Generation workflow](https://piper-ai.com/use-cases/scope-generation) organizes drawings, specifications, addenda and company knowledge into trade-specific scopes with source references. It can surface uncertain trade boundaries and affected scope when project information changes. The team still decides the allocation, resolves ambiguity and reviews the scope before solicitation.

For HVAC, the useful output is a reviewable package basis: the system included, the handoffs assigned and the acceptance work carried. It is not a longer document summary.

### Is “include all Division 23” enough for an HVAC bid scope?

No. Use Division 23 as part of the document basis, then define systems, equipment tags, trade boundaries and acceptance work. The scope should say who furnishes, installs, connects and verifies controls, power interfaces, insulation and testing, including relevant requirements outside the mechanical sections.

### Should controls, TAB and insulation be included under mechanical?

Either procurement structure can work if the allocations match across packages. Decide from the owner requirements, available specialists and coordination responsibility. A separately purchased specialist does not remove the mechanical subcontractor's installation, access, technician attendance or correction obligations required by the project.

### How should commissioning appear in the HVAC scope?

Separate the commissioning provider's role from the subcontractor's participation. Identify required startup records, checklists, access, technician attendance, test assistance and corrections. Where seasonal or deferred tests apply, carry their participation requirements explicitly rather than assuming a startup visit completes the acceptance work.

### What should an HVAC equipment alternate include?

Price the complete change from the stated base, not just the equipment discount. Identify changed duct and piping connections, controls, power interfaces, supports, accessories and acceptance work. Keep unapproved substitutions separate from the compliant base so every bidder responds to the same system basis.
