# I-35 Capital Express North: review the Wells Branch interchange and corridor interfaces

Separate the Wells Branch interchange from corridor bridge and path work before carrying a package. The work crosses the Austin metro, so a city-only boundary would be misleading.

## The dated project record

TxDOT describes the SH 45 North to US 290 East corridor as one HOV lane in each direction, with rebuilt bridges and ramps, a Wells Branch diverging-diamond interchange and shared-use paths. Construction began in March 2023; early 2029 is its forecast finish, and Pulice is listed as contractor. The source is [TxDOT CapExNorth](https://www.txdot.gov/mymobility35/projects/capex-north.html). Check the current owner record before relying on any date or project status.

## Compare the interchange with the corridor crossings

The following is an estimating review, not a statement that the owner assigned these tasks to a particular contractor. Use the current drawings, specifications and contract documents to settle the actual boundaries.

| Scope or location | Review and assignment question |
| --- | --- |
| Wells Branch interchange | Identify crossover, bridge, ramp and traffic-control limits; ask which package maintains each transition. |
| Braker Lane | Trace road and bridge limits against adjacent ramp and access work; identify the handoff in each stage. |
| Walnut Creek crossing | Separate bridge work from adjacent roadway and path approaches; check temporary access and restoration. |
| Shared-use paths | Follow each approach to its tie-in; identify paving, barriers and maintenance responsibility during staged work. |

## Record each staged approach

An interchange quote can cover pavement while excluding temporary traffic shifts or the path tie-in. Compare each exclusion with the staged traffic plan and adjacent scope, and carry a named assumption until the documents resolve it.

Use Wells Branch as a distinct interchange review rather than a proxy for every corridor crossing. For Braker Lane and Walnut Creek, ask which approach and path work belongs to the structure handoff and which remains in adjacent roadway scope.

## Evidence needed for this package

Request the Wells Branch staged-traffic drawings, Braker Lane and Walnut Creek approach details, and the shared-use-path limits. Check the actual municipality and work zone of each location; the SH 45 North–US 290 East project extends across the Austin metro.

For the broader method, see the [logistics estimate review](https://piper-ai.com/resources/construction-logistics-plan-estimate-review). Use the project-specific register above to bring the general boundary review back to the actual work.