# I-35 University segment: review crossings, Airport Boulevard and pedestrian work

TxDOT anticipates construction of the I-35 Capital Express Central University segment from 2027 to 2033, weather permitting, and lists its contractor as TBD. The overview names five reconstructed crossings, the Airport Boulevard intersection and a Capital Plaza pedestrian bridge. [TxDOT University segment](https://www.txdot.gov/mymobility35/projects/capex-central/university.html) Source status checked November 17, 2026. Make the crossing, rather than the trade, the first unit of review. Each crossing has a different combination of traffic, utilities, pedestrian access and temporary works that must be assigned in the issued staging plan.

## Build a register for the five named crossings

The following register is estimating analysis, not a statement of the owner’s contract assignments. The owner overview establishes the project context; the current drawings, specifications and package documents determine what a bidder must carry.

| Interface | Review boundary | Decision to resolve |
| --- | --- | --- |
| Manor and Dean Keeton | Crossing reconstruction | What access and utility continuity must each stage retain? |
| 32nd and 38½ streets | Crossing reconstruction | Who carries temporary crossings, relocation and final restoration? |
| Wilshire Boulevard | Crossing reconstruction | Where do bridge, roadway and utility limits meet? |
| Airport Boulevard | Intersection reconstruction | Which package controls signal changes and traffic transitions? |
| Capital Plaza | Pedestrian-only bridge | Who carries approaches, temporary pedestrian routes and handback? |

TxDOT’s contractor field says TBD; that is a status on its overview, not proof that a trade solicitation is open. [TxDOT University segment](https://www.txdot.gov/mymobility35/projects/capex-central/university.html)

## Make the crossing the unit of scope review

For each location, place issued plan sheets, stage dates, maintained movements, utility owners and bid exclusions in the same row. Ask a targeted RFI where a temporary sidewalk or signal is shown but no package takes installation and maintenance. Confirm every assumption against the current documents before setting a carry.

The University description identifies Manor Road, Dean Keeton Street, 32nd Street, 38½ Street and Wilshire Boulevard, plus the Airport Boulevard intersection and Capital Plaza pedestrian bridge. Keep a separate row for each location: grouping the work as 'crossings' hides which roadway movement, utility connection or accessible route a particular stage must preserve.

## Documents to request before committing

Obtain the individual crossing plans and stage diagrams, intersection signal transitions, utility-owner requirements and Capital Plaza approach details. Keep this segment distinct from Downtown upper-deck removal and lowered-mainlane work unless issued documents expressly connect the responsibilities. A contractor field of TBD does not establish an open solicitation.

The [logistics estimate review](https://piper-ai.com/resources/construction-logistics-plan-estimate-review) provides a broader method for documenting these boundaries and carrying unresolved assumptions through bid review.